Generating power at high efficiency
WPNL2204
Related titles: Industrial gas turbines: Performance and operability (ISBN 978-1-84569-205-6) This important new book provides operators of industrial gas turbines with a review of the principles of gas turbine operation and how they can be used to predict and improve turbine performance. The book is accompanied by a CD which allows readers to simulate various aspects of performance such as emissions, changes in pressure and power augmentation. The air engine: Stirling cycle power for a sustainable future (ISBN 978-1-84569-231-5) The Stirling air engine is the core component of combined heat and power systems and is becoming an important sustainable technology in other areas. With more demands being placed on the engine, it is becoming necessary to increase its thermal efficiency and specific power. This new book discusses how redesign of the regenerator can maximise the potential of this important technology. Creep-resistant steels (ISBN 978-1-84569-178-3) Creep-resistant steels must be reliable over long periods of time, at high temperatures and in severe environments. Their microstructures have to be stable in both the wrought and the welded states. Creep, especially long-term creep behaviour of these materials, is a vital property and it is necessary to evaluate and estimate long-term creep strength accurately for safe operation of plant and equipment. The first part of the book describes the specifications and manufacture of creep-resistant steels. Part II covers the behaviour of creep-resistant steels and a final group of chapters analyses applications.
Details of these books and a complete list of Woodhead’s titles can be obtained by: • •
visiting our web site at www.woodheadpublishing.com contacting Customer Services (e-mail:
[email protected]; fax: +44 (0) 1223 893694; tel.: +44 (0) 1223 891358 ext. 130; address: Woodhead Publishing Ltd, Abington Hall, Granta Park, Great Abington, Cambridge CB21 6AH, England)
If you would like to receive information on forthcoming titles, please send your address details to: Francis Dodds (address, tel. and fax as above; e-mail:
[email protected]). Please confirm which subject areas you are interested in.
WPNL2204
Generating power at high efficiency Combined-cycle technology for sustainable energy production
Eric Jeffs
WPNL2204
CRC Press Boca Raton Boston New York Washington, DC
Cambridge, England
WPNL2204
Published by Woodhead Publishing Limited, Abington Hall, Granta Park, Great Abington, Cambridge CB21 6AH, England www.woodheadpublishing.com Published in North America by CRC Press LLC, 6000 Broken Sound Parkway, NW, Suite 300, Boca Raton, FL 33487, USA First published 2008, Woodhead Publishing Limited and CRC Press LLC © 2008, Woodhead Publishing Limited The author has asserted his moral rights. This book contains information obtained from authentic and highly regarded sources. Reprinted material is quoted with permission, and sources are indicated. Reasonable efforts have been made to publish reliable data and information, but the author and the publishers cannot assume responsibility for the validity of all materials. Neither the author nor the publishers, nor anyone else associated with this publication, shall be liable for any loss, damage or liability directly or indirectly caused or alleged to be caused by this book. Neither this book nor any part may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, microfilming and recording, or by any information storage or retrieval system, without permission in writing from Woodhead Publishing Limited. The consent of Woodhead Publishing Limited does not extend to copying for general distribution, for promotion, for creating new works, or for resale. Specific permission must be obtained in writing from Woodhead Publishing Limited for such copying. Trademark notice: Product or corporate names may be trademarks or registered trademarks, and are used only for identification and explanation, without intent to infringe. British Library Cataloguing in Publication Data A catalogue record for this book is available from the British Library. Library of Congress Cataloging in Publication Data A catalog record for this book is available from the Library of Congress. Woodhead Publishing ISBN 978-1-84569-433-3 (book) Woodhead Publishing ISBN 978-1-84569-454-8 (e-book) CRC Press ISBN 978-1-4200-8069-8 CRC Press order number WP8069 The publishers’ policy is to use permanent paper from mills that operate a sustainable forestry policy, and which has been manufactured from pulp which is processed using acid-free and elementary chlorine-free practices. Furthermore, the publishers ensure that the text paper and cover board used have met acceptable environmental accreditation standards. Typeset by Ann Buchan (Typesetters), Middlesex Printed by TJ International Limited, Padstow, Cornwall, England
WPNL2204
Contents
Acknowledgements
vii
1
Introduction
1
2
A brief history of development
9
3
Some early schemes
41
4
Gas turbine developments
57
5
Steam generator concepts
87
6
The single-shaft block
117
7
Repowering steam plants
135
8
Combined heat and power
154
9
Gas turbines and coal
166
What does the future hold?
190
Index
203
10
v WPNL2204
WPNL2204
Acknowledgements
I would like to thank the many people throughout the industry who have helped me over the years, providing information and arranging site visits. In particular I would mention three people who have reviewed my manuscript and thank them for their valuable comments. Dick Foster-Pegg, although born in the UK, emigrated to the USA and worked for Bechtel Corporation on some of the early combined-cycle concepts there, and later for Westinghouse on gas turbine research and development in Pennsylvania. Louis Codogno was Managing Director of the Energy Division of Cockerill Mechanical Industries up to his retirement in 2005 and was almost 40 years ago involved in the design of some of the first heat recovery boilers built by that company. Dr Maher Elmasri, President of Thermoflow Inc., was Professor of Mechanical Engineering at Massachusetts Institute of Technology until 1987. He left to form his own company, Thermoflow Inc., to develop and market GTPro, the first computer program for the design of a combined cycle. In the following 20 years the program has evolved into a powerful suite of software which is used around the world for the design and study of the operation of a wide range of gas turbine applications including, in the latest versions, the IGCC.
vii WPNL2204
WPNL2204
1 Introduction
Almost all of us alive at the start of the twenty-first century have grown up secure in the knowledge that, when we touch the switch on the wall, the light will come on. If it does not, then the chances are that the bulb has burned out and has to be replaced. Security of electricity supply is essential to our way of life, but we almost take it for granted that enough of the power stations are working to keep us supplied. However, a power station wears out and has eventually to be replaced, and the important question that we have to answer is: with what do we replace it? Present-day worries about climate change suggest that high efficiency is required of all new thermal power plants. Combined heat and power is one solution, but even with district heating or industrial processes the demands for heat do not necessarily coincide with demands for electricity. However, there is one engine which produces large quantities of exhaust gas, at a sufficiently high temperature, to generate steam for a small steam turbine. The gas turbine, which was first developed in the 1930s as an aero engine, is now at the centre of the most efficient generating yet devised: the gas-fired combined cycle as an electricity generator with an efficiency close to 60%. For much of the twentieth century the main fuels available for power generation were coal and oil and the efficiency of electricity production was at best 30% for the first 50 years. In the years after the Second World War, as the shattered economies of Europe and Japan were rebuilt, there was a period of great innovation across industry which all pointed to rapid growth in electricity demand. The first transistors were produced at the Bell Telephone Laboratories in the USA in 1948; the first gas turbines to be designed specifically for mechanical drive applications on land appeared the following year in Europe and the USA. The following decade saw the first gas turbine powered aircraft enter commercial airline service, and the application of the first computers in industry. Steam locomotives were replaced with electric and diesel traction on the railways. In the domestic market, television, refrigerators and a host of other electrical appliances spread across the population. The various social changes that resulted from the 1 WPNL2204
2
Generating power at high efficiency
development of these industries and the rapid expansion of others, the greater use of cars and road transport generally, and the development of supermarkets also added to the demand for electricity. As demand continued to grow the combined cycle was born out of a need to improve the efficiency of power generation. Until reheat steam cycles were introduced in the mid-1950s thermal power stations generated at an efficiency of less than 30%. The first combined cycle appeared in Europe in about 1960, but these early developments used the gas turbines available at the time, of which the largest were rated at about 25 MW, and their low exhaust temperatures required additional firing in the exhaust duct to raise the steam temperature going into the steam turbine. Nevertheless there was a sufficient gain in efficiency over the other thermal power stations of the time to show that, with further development of the gas turbine, a larger and even more efficient power plant could result. The first combined cycle in Europe was being built in Austria at a time when the electricity supply industry in Europe and North America was entering a period of change to meet a growing demand for electricity stimulated by the wider application of electric and electronic technologies among industries and the public at large. Generating sets were becoming larger, and voltages were increasing so as to be able to transmit economically the extra power that was produced. The first nuclear power stations were coming into operation, and the first high-voltage direct current (HVDC) transmission schemes went into service in Scandinavia. The first gas discoveries were made in the North Sea in 1964. It is ironic that what then was seen as a natural development of the electricity supply system was having benefits for the environment long before the Green movement became involved. HVDC, as developed in Scandinavia, showed how Norway, Sweden and Finland with a large hydro capacity and Denmark, which had entirely thermal generating plants, could pool generating resources between countries with different climates, in different time zones and with different industries and different methods of organisation of the working day. Furthermore it is an inherent property of HVDC transmission that it cannot propagate a fault in the sending network to the receiving network. Denmark could send base-load coal power north and hydropower was sent south at Danish peak times which gave better use of existing facilities and delayed the building of new power stations. Nuclear plants were at last a generating system which was not emitting smoke and ash into the environment and could not be accused of acidifying lakes downwind of them. Gas discoveries, in Europe at least, were to replace coal gas in the domestic market before being applied to power generation, but already the first combined cycles were pointing the way to achieving more efficient power plants. The oil crisis of 1973 was the principal catalyst for change. First it started a search for new oil and gas resources, and also set industry looking at ways to
WPNL2204
Introduction
3
improve the energy efficiency of both its products and its processes. This was a time when the first of the large gas turbines started to appear: 100 MW units which could run at the common synchronous speeds and therefore not require a gearbox in order to drive the generator. Exhaust temperatures over 500 °C could support more efficient steam cycles at higher temperatures and pressures without supplementary firing. The 1970s also saw the rise of an environmental protest movement. There had been protests before but these had been against specific actions such as the route of a power line or a new road. The new protest movements were not so much individuals as global organisations protesting against government energy, transport and environmental policies. Groups such as Friends of the Earth and Greenpeace all date from this time and, although some of their campaigns have undoubtedly been of benefit, their influence has not all been benign but has spread globally through their mastery of television presentation. A little knowledge is a dangerous thing and the way that public opinion has been influenced by these groups is amply illustrated by the contraction of the nuclear industry in Europe and North America, and by their influence which extends through the teaching profession into the education systems that now have fewer students coming forward to study mathematics, science and engineering. Already, in 2007, this was causing some anxiety in the oil and gas and the nuclear power industries as the people who grew up professionally with them as they were developed reach retirement age. Global warming is the latest environmental campaign and has been running for more than 10 years, but how serious is it? In the 60 years since the end of the Second World War the world population has trebled; so to blame only combustion of fossil fuels is to ignore the fact that there are three times as many people in the world now than there were then. Recorded history shows significant changes in climate when there was a much smaller population, when transport was on foot or horseback and when wind power ground corn and propelled ships. Two thousand years ago the climate of southern Britain was warm enough to grow grapes and to produce wine. Later it cooled and 300 years ago it was possible in winter to skate on the Thames in London. Modern commercial wine production in southern England started around 1970, summers are noticeably warmer and there is far less snowfall in the south of the country in winter, if at all. Industry gains no credit for steadily improving the efficiency of energy conversion from fuel to mechanical and electrical power. Any car owner will know that the efficiency of car engines has increased significantly in the last 30 years. Similarly the efficiency of the gas turbine has also been increased. Early models in 1970 had efficiencies of around 25%. The large gas turbines, over 200 MW, found in modern combined cycle plants are at about 37%, and the efficiencies of the latest models are nearer to 40%. Electricity generation has by its nature not shown the same overall improvement
WPNL2204
4
Generating power at high efficiency
in efficiency, particularly with coal-fired power. Unless it is a modern large coalfired unit of about 700 MW with a supercritical steam cycle and all the environmental additions, the efficiency will be significantly less than 35% over much of the world. Lasting improvement in efficiency will only come with the replacement of these generating plants, many of which are more than 30 years old, by a combined cycle in one or other of its forms. The emphasis on energy planning has changed. Some countries have introduced energy taxes which have aimed to encourage greater energy efficiency and reduction of the so-called greenhouse gases, principally carbon dioxide. Renewables, mainly wind power, have been heavily subsidised but still contribute little to the electricity supply. Biomass, mainly forestry and agricultural wastes and specially cultivated fuel crops, is judged to be carbon neutral and has caused boiler firms to increase research and development into the circulating fluidised-bed combustion system. However, if the Green movement becomes agitated over large-area monocropping for food, because of its deleterious effects on biodiversity, surely they are going to be even more agitated over monocropping to produce fuel, particularly if the plants have been genetically modified to increase the quality and volume of their yield. Natural gas is a finite resource although it is a product of the decay of vegetable matter and a few operators of landfill sites for refuse disposal have organised them in such a way that methane can be captured from the decaying refuse and burned in a gas turbine to produce electricity. One such scheme in the UK supplies electricity to Birmingham Airport. However, gas has been produced from coal for more than 150 years, and this brings us to the other important energy development, which is clean coal technology. This is really another name for the integrated gasifier and combined cycle (IGCC) which is gathering momentum in the coal-producing areas of the USA. There is now significant operating experience in several countries of IGCC plants mainly, it must be said, at oil refineries using residual oil and asphalt as feedstock. The gasifiers have been identified which will form the basis of these sytems. Costs are being reduced down almost to meet those of the conventional coal-fired systems. The first IGCC schemes are likely to be rated about 630 MW with a combined cycle based on the present generation of large gas turbines. The term ‘clean coal’ comes from the fact that the synthetic gas (syngas) produced can be cleaned of sulphur by established chemical processes and can be burned in a gas turbine which, as part of a combined-cycle cogeneration scheme, could also draw steam from the syngas coolers. The few coal gasifier plants that have been built in The Netherlands, Spain and the USA have been funded as development projects with the assistance of Government or European Union money but, in the USA, the IGCC system is on the point of commercial exploitation. Coal is still the most abundant fossil fuel reserve in the world, not least in the USA, where exploitation of an indigenous resource must be viewed against a growing need to import liquefied natural gas (LNG).
WPNL2204
Introduction
5
Since 1990 there have occurred massive changes around the world in the way that electricity is supplied. Deregulation, which started with privatisation of the UK electricity supply industry in 1990 has had two effects. Firstly, by separating responsibility for generation from transmission and distribution, it opened the door to independent power producers and forced the technology of generation in a new direction. Almost immediately applications were filed for combined heat and power schemes in industry, with the paper, petrochemical and food-processing industries to the fore. In a system where anybody could generate electricity and sell its surplus production at a fair market price, industry was keen to become involved and cut their energy costs, and in many countries, because of the state ownership of the electricity supply industries, they had never before had the opportunity. Secondly, the independent power producers appeared on the scene to provide the investment capital to continue the system. Year by year, as demand for electricity continued to grow, the cost of new capacity additions to keep pace with it also continued to rise but, whereas the State-owned utility systems had developed over the long term with specific energy policy objectives in mind, it was different for the independents. For them a power plant was an investment; they wanted one which which was easy to plan, quick to build, did not damage the environment and was highly reliable so that it could provide a good rate of return on the investment. All this pointed to the combined cycle which by 1990 could be considered proven technology and at a time when natural gas had emerged as an acceptable fuel for power generation with large reserves distributed around the world. As deregulation has evolved, the initiative for development of power plants has moved from the utilities to their supplier industries. Instead of the utility writing a specification for a power plant and inviting bids to design and build it, they just want an addition of capacity and have a choice of suppliers of complete generating plants which will be offered with long-term support for operation and maintenance. In the aftermath of deregulation, many of the public utilities, particularly in southeast Asia, have remained as the owners of the grid and therefore control the market into which the generators must sell their power. They retain a measure of influence in that they still control the development plan and collect data on the rate of growth of electricity demand and other factors on a national level which the private investors cannot be expected to do. Governments decide when new plants will be required and where they can be installed, although private capital will fund the project and the builders might retain a presence in the completed plant to train operators and to supervise operation and maintenance for the first few years. What has also happened is that electricity supply has become much more of a global industry as former national electric utilities have moved offshore. Spanish utilities, for instance, have moved into South America and Central America. The Belgian company Tractebel, is a major gas supplier in the USA and has interests in power generation there. Its Thai operation, Glow Energy Ltd, operates three large
WPNL2204
6
Generating power at high efficiency
combined heat and power schemes and an 800 MW combined cycle. International Power, from the UK, operates plants in, among others, the USA, Czech Republic, United Arab Emirates, Pakistan and Australia. In turn, the combined cycle has become standardized, with the development of the single-shaft block. This has made it possible for one of the new global generating companies to have the same plants as a standard 400 MW combinedcycle block (250 MW in 60 Hz countries) operating in different parts of the world with a global maintenance company supporting them with the turbomachinery. In Europe and North America, a more open market system has been set up. The original UK system had a national power pool into which all generators bid to supply in each half-hour period and were paid the price of the last unit to come on during that period. Several other countries adopted a similar system but did not have such a large system or such great diversity of generating plant as in the UK. However, the situation in Europe and North America is subtly different from that in much of the rest of the world. Here combined cycles have been installed in mature power systems where rates of increase in electricity demand in recent years have been no more than 1 or 2%/year. The combined cycles compete with the existing power plants many of which are old and completely written down, leaving just fuel, operation and maintenance costs to earn, whereas the combined cycle has to meet all these costs and capital repayment as well. From the end of 2004 onwards, there has been a steady rise in the price of both oil and gas, but oil at more than US$60/bbl has not had the damaging effect on the global economy as did the initial quadrupling of the oil price in 1973. In some ways it can be said to have had a beneficial effect in that it has stimulated the exploitation of more remote resources of oil and gas, and to support that is the development of a growing trade in LNG. In the last 40 years, new gas fields have been discovered in the Far East, the Barents Sea off the north coast of Norway, and in Central Asia, the latter requiring either long pipelines to bring the fuel to market, or else liquefaction for shipment to the customer. The much higher oil prices have encouraged deep-water drilling off the coast of Angola, Namibia and Brazil and stimulated the development of unmanned production facilities on the sea bed. As the North Sea fields decline, LNG from Norwegian, Middle Eastern and North African sources is starting to enter Europe and North America, and new pipelines are being built from Russia and Central Asia to western Europe, and also to China. For many years there have been just four companies offering basic designs in scaled 50 and 60 Hz versions of the large heavy-duty gas turbines specifically designed for power generation. As the result of various mergers within the industry there are two companies in Europe and one each in the USA and Japan who can bid to supply a combined-cycle block to any developer anywhere in the world. This is where we are at the beginning of the twenty-first century with the development of the combined-cycle technology firmly in the hands of the gas turbine suppliers. For the time being, the trend is to the basic refinement of the
WPNL2204
Introduction
7
design to make it more efficient and more reliable. Development so far has been hampered by major design problems in two of the gas turbine families and, although these have now been resolved, the market has since been cautious. European governments recently have been more concerned with meeting Kyoto targets and assigning a percentage of energy supply to renewables, mainly large wind farms. For the rest, coal has too many environmental problems and is almost priced out of the market. Nuclear power can be kept running but governments must be able to carry the electorate with them, if they are to build any more, although that seems to have happened in Europe in Finland and France, and a nuclear renaissance is gathering momentum in North America. For much of the world, however, combined cycle is the system of choice for most of the new generating plant needed in the first 20 years of this century, and as much again may be needed to replace plant that must be retired. It satisfies most environmental requirements with low emissions and a much reduced carbon dioxide emission due both to the higher efficiency and the use of methane with carbon dioxide and water as combustion products. In development over 50 years, the efficiency of electricity generation has risen from at best 35% for a large subcritical coal-fired plant to more than 58% in a single-shaft combined-cycle block and with far less environmental impact, in terms of both the physical size of the plant and the level of emissions. Gas turbines now under development aim to lift combined cycle efficiency above 60% but they are not likely to have much impact on the market for at least another 5–10 years. Several other technologies based on gas turbines have also been studied and some power plants have been built to test the principles of operation in a commercial environment but have not resulted in large markets. The Asian steel industry uses a number of gas turbines adapted to burn blast furnace gas, but this is a niche market for a particular industry. Although the price of oil is higher than in 1973, at between US$60 and US$80/ bbl, low inflation has reduced its economic impact. Nevertheless the factors raising the price of oil are not so much political as economic. Rapid industrial growth in China and India has increased demand, not just for oil and gas but also for other raw materials at a time when there is a shortage of refining capacity in the USA and Europe and irregular production due to sabotage of installations in Iraq and Nigeria. Opinion is moving toward the view that high fuel prices will be with us for a long time. Even where gas is not linked to the price of oil, LNG will add a new economic dimension to energy planning in Europe and North America. With many combined cycles in recent years having been designed for base-load duty and a quick return on the investment, have we lost sight of the value of flexible operation in later years? It would be advisable to look again at the lessons of the past if high gas prices persist, new coal-based and nuclear systems come to the fore, and combined cycle has again to occupy the mid-load market to provide the flexibility of operation that is the guarantee of a secure electricity supply.
WPNL2204
8
Generating power at high efficiency
There are signs of this already happening as a number of combined-cycle plants have been ordered in Europe during the second half of 2007 in, among other places, Germany, the UK, the Netherlands and Portugal. Several of these have specified Benson heat recovery boilers in anticipation of load following duty, including one project near Rotterdam which will only run during the daytime when electricity prices are highest. Does this point to the combined cycle of the future?
WPNL2204
2 A brief history of development
The principle of the combined cycle is that the hot exhaust gas from a gas turbine is passed through a water-cooled heat exchanger to power a small steam turbine. The Brayton cycle of the gas turbine is linked to the Rankine cycle of the steam turbine, and hence the term combined cycle. On gas turbine exhaust heat alone, the relationship is about 2:1 gas turbine to steam turbine output, so that a 120 MW gas turbine would generate enough steam from its exhaust gas to power a 60 MW steam turbine and, since no additional fuel is burned to make the steam, the efficiency of the system is significantly higher than that of the gas turbine alone, and of the traditional power plant of the last century with a coal- or oil-fired boiler generating steam for a 180 MW steam turbine. A combined-cycle set-up can be designed either as a pure generating plant or as a combined heat and power scheme integrated with an industrial process, with steam at the required pressures extracted from the steam turbine and/or the heat recovery boiler. Generally such projects are among the smaller installations serving a particular industrial site, with gas turbines rated at less than 50 MW, but there are now an increasing number of large schemes using the 250 MW class gas turbines in the 50 Hz market, and the equivalent 180 MW, 60 Hz models in the North American market, serving entire industrial estates. The combined-cycle principle as it is understood today is very much a European concept just as the gas turbine was before it, but that is not to say that other countries have not made significant contributions to the technology in the intervening years. In less than 50 years the combined cycle has evolved from a design idea to improve the efficiency of the power generation systems of the day, to being the preferred fossil-fuel-generating system across the world at a time of growing environmental concern. To understand why this should have happened we have only to look at the impact of the modern combined cycle on the power generation market. Cottam, shown in Fig. 2.1, is one of a string of coal-fired power stations built in the 1960s along the Trent valley of central England, close to the coal fields of 9 WPNL2204
10
Generating power at high efficiency
2.1 Cottam, UK: the 400 MW combined cycle with the 2000 MW coalfired steam plant in the background. The combined cycle went into service in 1998 and is operated commercially by E.ON (UK).
Nottinghamshire and south Yorkshire. It provides a good example of the compactness of the combined cycle. The coal-fired power station was completed in 1968 and two of the eight large cooling towers are associated with each of the station’s four 500 MW steam turbines. The four boiler flues are contained in a single stack about 200 m high to allow for wide dispersal of the flue gases on the prevailing wind. The low buildings in front of the station are, from right to left, the heat recovery boiler of the combined cycle with the stack 60 m high, the gas turbine building with a small bypass stack to enable the gas turbine to run independently of the steam cycle, and 14 hybrid mechanical draught cooling units. The plant was completed by Siemens in 1998 as a development centre for testing combined-cycle components, notably the prototype Benson once-through heat recovery boiler, in a utility environment. Some upgrade kits also have been tested on the gas turbine. The original plan was to replace the gas turbine, their F-class Model SGT54000F, with a more powerful unit after about 5 years, but this development was postponed and the plant now runs commercially under the ownership of E.ON (UK). The plant output is 400 MW and the efficiency is 58.5%, compared with about 36% for the coal-fired station. The Cottam combined cycle, if it had been built as a standard single-shaft block, using the same gas turbine, would be even more compact, with probably a wet mechanical-draught-cooling system with eight rather than 14 cells, or else an air condenser, an outdoor heat recovery boiler, and no gas turbine bypass stack. Five
WPNL2204
A brief history of development
11
such units would provide the 2000 MW of the coal-fired plant, but they need not all be built on the same site. These then are the basic advantages of the combined cycle: high efficiency, low emissions and low environmental impact. This also gives it greater freedom of location. The combined cycle was built at Cottam because the then owners of the station were an existing gas turbine customer of Siemens who had land available, and there was a high-pressure gas line coming into the site. The greater freedom in siting combined-cycle power plants means that they can be located much closer to the load centres that they will serve and can therefore make better use of the existing transmission system. Not only that, but construction time is shorter and a typical time from initial ground breaking to the start of commercial operation, for a single 400 MW block, is little more than 2 years. Several combined cycles in the UK have been built on the sites of old coal-fired stations built in the 1930s and have been connected to the original 132 kV transmission system which would have remained in place. A further benefit is the much lower cooling load of the combined cycle. If the original power plant had three 60 MW steam sets cooled by a river passing the site, the steam turbine of a 400 MW combined cycle would be about 120 MW and marginally more efficient than the original 60 MW units. The combined cycle would therefore have a much smaller cooling load and it would probably have a hybrid mechanical draught system or an air condenser rather than draw cooling water straight from the river. Combined cycle is the preferred fossil fuel generating system because of its high efficiency, low environmental impact, low capital cost and shorter construction time. Cottam represents the culmination of development of the combined cycle over 50 years, which has almost doubled the efficiency of power generation. Although the first gas turbines are generally considered to be the two aero engines developed independently in the UK and Germany at the end of the 1930s, there was in fact a third stationary gas turbine developed for power generation, in Switzerland, by Brown Boveri, and exhibited at a World Trade Fair in Geneva in 1939. This unit, rated at 3 MW, was subsequently installed at the Neuchatel water works and, in 1990, was still available as a standby unit on the Swiss power system. After the end of the Second World War, in the late 1940s, the British gas turbine technology was made available to the USA and others, and the USA and Russian industries continued development on the basis of aero engines and from that into heavy-frame industrial versions for power generation and mechanical drive. In North America the combined-cycle developments started at the end of the 1940s but focused on the application of the gas turbine as a feedwater heater for a conventional coal- or oil-fired steam plant. The gas turbine was seen as a relatively small device producing a large volume of exhaust gas at less than 400 °C. As such, it had the potential to heat feedwater for a large steam plant and thereby to reduce the amount bled off the steam turbine for this purpose. The steam turbine would therefore produce more electricity from its own steam supply to which would be added the output of the gas turbine.
WPNL2204
12
Generating power at high efficiency
In 1950, General Electric (GE) announced a 3.5 MW gas turbine which later became known as the Frame 3 and, although designed principally as a mechanical driver for the oil and gas industry, some single-shaft units were built, with the first examples being used in power plants as feedwater heaters. These early units were high-speed machines and were linked to the driven unit through a gearbox. Oklahoma Gas and Electric are credited with being the first utility to run such a combined cycle at their Belle Isle power station in 1949 followed by a second unit completed in 1952. Gas turbine development continued in North America. Three companies in particular focused on the market for power generation: GE, in Schenectady, New York, and with a separate aero engine division in Cincinnati, Ohio; Pratt & Witney in Hartford, Connecticut, concentrating on aero engine developments; Westinghouse, with headquarters in Pittsburgh, Pennsylvania, and with a Canadian production line at Hamilton, Ontario, about 120 km west of Toronto. By 1960 this industry was already global. Apart from the airline industry for which one of three companies could provide engines for a growing fleet of gasturbine-powered aircraft, the heavy-frame gas turbine manufacturers had also formed alliances with the electrical industries of other countries. Westinghouse had set up licences for their gas turbine and nuclear power technology with Fiat in Italy and Mitsubishi Heavy Industries in Japan, which in effect meant that, from a Westinghouse design base, the two companies could develop 50 Hz designs for the rest of the world while, because of the dual system frequency in Japan, Mitsubishi also could provide design input to the 60 Hz gas turbines. GE had a different approach with a network of business associates; these initially were Alsthom in France, AEG Kanis in Germany, John Brown Engineering in the UK, Kvaerner Brug in Norway, Nuovo Pignone in Italy, and Hitachi in Japan. Under this arrangement, GE supplied rotors, combustors and other noble parts to their business associates who would then package them and fit locally produced driven units. In 1962, West Texas utilities were planning a new power plant at Lake Nasworthy, near San Antonio. They already operated three gas turbines, including a GE Frame 3 which in 1959 had been applied to feedwater heating at their Rio Pecos station. The new plant for Lake Nasworthy would either be a conventional reheat steam plant of about 107 MW or a combined cycle of about the same capacity. Comparative studies showed that by using a 27.5 MW gas turbine there would be sufficient exhaust gas at 435 °C to supply a separate economiser which would replace all the low-pressure feedwater heaters of a conventional steam plant. Cost analysis showed that the combined cycle at a rated output of 130 MW could be installed at a total cost some US$3.60/kW cheaper than the steam plant alone. Lake Nasworthy went into commercial operation in June 1966 with a 27.5 MW Westinghouse 301 gas turbine and a 99 MW two-cylinder tandem-compound steam turbine, also by Westinghouse. The gas turbine was fitted with an evaporative
WPNL2204
A brief history of development
13
intake cooler for summer use when ambient temperatures reach about 40 °C. At the design inlet temperature of 19 °C the gas turbine output was 24.6 MW with the steam turbine output as 99.6 MW and the plant heat rate was 9342 Btu/kW h, which made it the most efficient thermal power plant in the USA at the time. Despite the combined cycle’s advantage of higher efficiency the electric utilities were slow to take up the idea. By 1967 there were only five companies operating combined-cycle plants of this type. All were in the southwestern USA, with a total capacity of 658 MW, which was then equivalent to only 0.3% of a total installed capacity in the country of 236 000 MW. A problem of these early combined cycles was maintenance, which may explain why American utilities were not receptive of the idea. Incorporating a gas turbine into the steam cycle of a fired boiler meant that the maintenance needs of the gas turbine would determine the availability of the whole plant. In any case, most steam plant operators performed their own maintenance and the gas turbine was a new technology which they did not fully understand. However, these were not the only gas turbine developments at that time in the USA. By 1960 the basic designs had been established for a number of gas turbines, derivatives of which are still in production nearly 50 years later. A steady increase in performance came from the use of improved high-temperature materials, and the air cooling of the first turbine inlet vanes and the first rotating blade stages. As a result the GE Frame 3 rating of 5000 hp in 1950 had reached 14 250 hp by 1969, with the two-shaft Frame 3J introduced in that year. In 1957, GE announced their larger Frame 5 model in single- and twin-shaft versions for power generation and mechanical drive respectively, with an initial rating of about 19 MW. It was progressively improved over the next 13 years to the Frame 5P model which was introduced in 1970 as a 25.2 MW unit with an efficiency of 27.7%, burning natural gas and aimed specifically at electricity generation. Pratt & Whitney meanwhile had cornered the US civil aviation market with their JT4 turbojet engine and had developed from it the FT4, which was announced in 1960 as a unit of 13.5 MW which could be used to drive either a generator or a pipeline compressor. The engine exhaust was directed to a free power turbine which was coupled to the driven unit through a gearbox as appropriate. As such, it could be used with either system frequency. In England, Rolls-Royce announced, in 1963, a similar development of their Avon turbojet, as a 14.6 MW unit for generator and compressor drive. This unit was later uprated to 17.75 MW and saw service in generator packages, on offshore platforms and as compressor drivers on gas pipelines around the world. More than 1000 units were sold over the next 20 years. However, in the USA there was a massive power blackout in the northeast in 1963 which also extended into Canada. The following year Boston Edison bought four Avon gas turbine generator packages from the UK to act as peaking and standby units on their system. These were the first of many generating packages
WPNL2204
14
Generating power at high efficiency
with aero-derivative gas turbines to be ordered around the world for similar duty. A feature of the Avon packages was the placement of a clutch between the power turbine and the driven unit so that the two could be separated and the generator run as a synchronous compensator at off peak times. Most of the gas turbines ordered by utilities during the late 1960s were for simple-cycle peaking units of this type. In Europe, the first combined-cycle projects followed the discovery of natural gas in The Netherlands and its distribution into neighbouring countries at the end of the 1950s. They were based on the available gas turbines of the time from the European manufacturers which were multi-cylinder units with free-standing combustion chambers and were characterised by relatively low powers and operating temperatures. As in America the object of the exercise was to improve the efficiency of power generation. It was the Austrian utility Niederösterreicher Elektrizitaetswerke AG (NEWAG) who in 1960 built the first combined cycle in Europe at their Korneuburg power station near Vienna. It was rated at 75 MW and consisted of two Brown Boveri Type 12 gas turbines with heat recovery boilers and a 25 MW steam turbine. From the beginning, the European concept of the combined cycle was different. The gas turbines were larger than the early American units which had been used for feedwater heating, with the Brown Boveri Type 12 at 25 MW, of the same order as the largest American machines then available. The European concept started with two gas turbines supplying a small steam turbine from their exhaust energy. Except for supplementary firing to raise the gas temperature entering the boilers, the arrangement of two gas turbines and heat recovery steam generators powering one steam turbine would become the commonest format for the majority of combined cycles that would be built with the next generation of gas turbines over the following 40 years. Korneuburg A had an efficiency of 32.5%. If compared with the efficiency of a 75 MW steam turbine of the time operating on a low-pressure non-reheat steam cycle, which would have been about 28%, it was a definite improvement in efficiency. Korneuburg A went into service in 1960 and ran on base load, averaging 6000 h/year for the next 14 years. By then, parallel developments in steam turbine technology had introduced higher steam pressures, with reheat, and the thermal efficiency had reached 36% with the 500 MW coal-fired units which came into operation in Europe from 1965 onwards. Meanwhile, NEWAG had built a second combined cycle at Hohe Wand, which was of a similar concept to that of the combined cycles that were then in operation in the USA. Rated 75 MW, it consisted of a Siemens Model VM51 gas turbine rated at 11 MW which was integrated into the steam cycle of a 54 MW steam turbine. The plant went into operation in 1965 as a base-load unit with an efficiency of 43.7%. For the first 10 years in operation it ran 73 000 h. Then, 4 years later, in 1969, at Angleur power station near Liège in eastern Belgium, a 23 MW Sulzer N1101 gas turbine was fitted with the prototype of a single-pressure heat recovery boiler which supplied steam to a 28.5 MW turbine.
WPNL2204
A brief history of development
15
Since the exhaust temperature of the gas turbine was only 380 °C, supplementary firing in the exhaust duct raised the gas temperature to 530 °C so as to generate enough steam for the turbine. In these early years, the underlying problem was the low operating temperatures of the available gas turbines, and the low steam conditions and efficiency of the small steam turbines. Nevertheless these early plants had demonstrated the principles. The Belgian plant, in particular, ran in load-following mode with an average of 4500 h and 250 starts/year during its first 10 years of life and, by 1990, operation had reduced to less than 1000 h/year, since when it has been held on stand by and is now running no more than 100 h/year. The concept of Hohe Wand was similar to that of the American stations with a small gas turbine integrated with a large steam turbine. Initially it was more efficient than the gas-turbine-led concept of Korneuburg. In Europe, with larger gas turbines of about 50 MW capacity available, a series of power plants was developed, which became known as fully fired combined cycles installed between 1965 and 1978 and were formed by incorporating gas turbines with the fired boilers and steam cycles of existing power plants. With these larger gas turbines the hot exhaust gas would be used as combustion air for the burners of the main boiler and on its way to the boiler passed through heat exchangers that took over the role of some of the high-pressure feedwater heaters. There were 15 plants of this type built, at a time when nuclear construction was at a peak, and there were limits in Europe to the gas supply available for power generation. The gas turbine exhaust flow had to be matched to the combustion airflow to the burners in the main boiler, which determined whether one large or two small gas turbines would be used. It increased the power output from the site by both the contribution of the gas turbine and the additional steam flow released from feedwater heating. A typical installation would have a gas turbine of about 50 MW linked to a steam turbine of about 350 MW for a total plant capacity of 400 MW. The gas turbine generally burned gas and the steam turbine boiler was dual fired with natural gas or heavy oil. The majority of these plants were built in Germany and, for a while, ran in base load at an efficiency of about 44%. Two plants were of particular interest because they had coal-fired steam turbines. STEAG’s Kellerman Lünen station can be considered to be the first combined cycle linked to a coal gasifier. The gas turbine was the 50 MW Siemens Model V93.2 which burned gas produced by a Lurgi gasifier on an adjacent site. The other plant was Gersteinwerk K which used an early Siemens Model V94.2 as the gas turbine with a 500 MW coal-fired boiler. This plant was promoted as an example of how a gas turbine topping cycle could increase the efficiency of a coalfired power plant. The heyday of the fully fired combined cycle was really the 1970s. A 50 MW gas turbine linked to a 350 MW steam turbine provided a far more efficient plant than
WPNL2204
16
Generating power at high efficiency
the 400 MW steam turbines then being installed across much of Europe. A further group of fully fired combined cycles was converted in the late 1980s from ten steam plants in The Netherlands. These were all between 12 and 15 years old and varied in output from 150 MW at Dordrecht to 590 MW at Eemshaven, near Groningen. Eemshaven was the last of the fully fired combined cycles to be built in Europe. It was a gas-fired steam plant with a single turbine with an efficiency of 40.3%. The gas turbine is a Siemens Model V94.2 rated at 128 MW (ISO rating). The converted plant has the heat recovery unit running in parallel with the feedwater heaters. After conversion the plant output was 698 MW of which the steam turbine produced 571 MW and the gas turbine 127 MW; the efficiency was 46.3%. By the time that Eemshaven went into operation in the winter of 1986, development of the alternative plant with an unfired boiler behind a gas turbine of high mass flow and exhaust temperature had established the definitive combined-cycle design around the world. Then, 10 years after their introduction, larger gas turbines with greater output and higher exhaust temperatures, and operating at the common synchronous speeds, had defined the combined cycle as we know it today; a gas turbine with an unfired boiler supplying a small steam turbine was the way to proceed to higher efficiency in generation. Furthermore there was no design compromise between the gas turbine and the steam turbine. The gas turbine had a specific output of heat and a boiler could be designed to produce steam at the desired pressure and temperature which set the design conditions for the steam turbine. Development was proceeding slowly in a less than encouraging environment in Europe. Electricity supply was fully publicly owned, in the UK, France and Italy, which were among the industrial leaders; in the UK a power station could only be supplied by a British company, in France by a French company, etc. The smaller countries with a more open industrial culture were more receptive to new ideas and it is not surprising that the first combined cycles installed in Europe were in Austria, Belgium, Ireland and The Netherlands. This also meant that the gas turbines based on American designs could not be easily sold in Europe but could in other parts of the world by for example GE’s European and Japanese business associates, but there were some units sold to large industries such as oil refineries and petrochemical plants where there was freedom to generate their own power outside the orbit of the public utilities. Combined-cycle development in earnest really began in Europe and North America after about 1970. The few operating plants on both sides of the Atlantic had demonstrated the potential of the combined cycle in its different forms to contribute to improved efficiency of power generation. The power plants Korneuburg A and Angleur had laid the groundwork for the combined cycles to follow, but up to this time the available gas turbines were relatively small and, at both plants, supplementary firing had been required because of the low gas turbine
WPNL2204
A brief history of development
17
exhaust temperatures, but development of larger higher-temperature machines had already started. The first units designed to operate at the 60 Hz synchronous speed of 3600 rev/ min had been the GE Frame 7 gas turbine at 55 MW, announced in 1968, and the Westinghouse 501A gas turbine rated at 66 MW a year later. In Switzerland, Brown Boveri had announcd their first 3600 rev/min gas turbine as the Type 11 at 72.5 MW. An assembly line was set up at the company’s USA factory in St Cloud, Minnesota. The first GT11 went into operation in 1970. By this time there were therefore three large gas turbine models designed to operate at the 60 Hz synchronous speed of 3600 rev/min. Westinghouse and GE in the USA and Brown Boveri in Europe who assembled the Type 11 at their US plant. All the combined-cycle experience to date had been gained with old gas turbine designs of low power and operating temperature, but the principle was understood and designs for commercial power plants had been produced. In 1973, the outbreak of war between Israel and its Arab neighbours, and the creation of the Organization of Petroleum Exporting Countries (OPEC), who were then prepared to use the price of oil as a political weapon in support of their Arab members, led to the oil crisis in the autumn of that year which saw a four-fold increase in the price of a barrel of oil. Although gas had been discovered in The Netherlands, and later in the southern North Sea, electricity generation in Europe and North America was mainly with coal- or oil-fired steam turbogenerator sets, which had steadily increased in output and with a subcritical reheat steam cycle achieved an efficiency of at best about 36%. Much of the available hydropower potential had already been exploited to its economic limit, although not in the rest of the world, and the first nuclear power plants were coming into service. Over much of the developed world, oil was the main fuel for power generation, the exceptions being the UK, Germany, Australia and the USA with large reserves of coal which, together with nuclear power, was seen as the answer for at least large steam power plants. Algerian and Siberian natural gas supplies were starting to arrive in Europe, initially to replace synthetic coal gas in the domestic market, and high oil prices had stimulated development in the North Sea and Alaska. A large part of the natural gas associated with oil around the world was still being flared off at the well head as a useless by-product. Coal was also being considered, both for a coal-burning gas turbine and for the IGCC, but it would be another 20 years before the first applications would appear in the USA and Europe. In 1973, in the USA, Westinghouse completed a 520 MW combined cycle at American Electric Power’s Comanche Peak, Oklahoma, site. This had four of the 90 MW Westinghouse 501B gas turbines arranged in two blocks, each with two gas turbines, two heat recovery boilers and one steam turbine. Over the next 4 years they installed another five examples of this nominally 260 MW combined-cycle block. One was installed at El Paso, Texas in 1975, and two were provided to
WPNL2204
18
Generating power at high efficiency
Florida Power and Light at Putnam, Florida, in 1976 and two more the following year to Southern California Edison at Coolwater. Subsequently, 10 years later, Coolwater would become the site for the Texaco gasifier and the first IGCC scheme burning syngas derived from coal. GE similarly were promoting their STAG system and had a notable success with Comisión Federal de Electricidad (CFE) in Mexico, with one block installed at their Dos Basos site in 1974, and three at Gomez Palacio in 1976. In Europe, the first gas turbines to run at the 50 Hz synchronous speed of 3000 rev/min were under development. Brown Boveri launched their Type 13 in 1973. The following year, Siemens launched their 3000 rev/min unit as the V94.0 at 90 MW. In Italy in 1975, Fiat (the Westinghouse licensee) had scaled up the original W501 design to produce the 92.5 MW TG50 for the 50 Hz market and Westinghouse with Ateliers de Constructions Electriques de Charleroi (ACEC) built one as the W1101 gas turbine in the ACEC factory at Gent and installed it at Interbrabant’s Drogenbos power station in the southwestern suburbs of Brussels. Also in 1975, GE put into service their first Frame 9B gas turbine at 82 MW which they had developed in a joint venture with Alsthom, who were their French licensee for nuclear and other technologies. Initial production was all in Europe. Alsthom set up a factory at Bourogne a few kilometres from their gas turbine production line at Belfort to supply rotors for the new 50 Hz machines. By 1975, therefore, all the major manufacturers in Europe each had a large gas turbine operating at synchronous speed and with exhaust temperatures at 500 °C but none yet applied to combined cycles. The high price of gas in Belgium prompted InterBrabant to repower the best of the three 37 MW steam sets at their Drogenbos plant by replacing its boiler with a heat recovery boiler fitted to the Westinghouse gas turbine that was already on the site. Cockerill Mechanical Industries (CMI) who had supplied the original boiler at Angleur in 1969 were engaged to supply the new heat recovery boiler. The repowering was completed in March 1976. Meanwhile, Westinghouse with ACEC had seen an opportunity to supply a smaller 120 MW combined-cycle block based on the 40 MW Model W251B7 gas turbine which they installed at Angleur 2 in 1978 (Fig. 2.2). They also supplied two of these gas turbines to repower a 35 MW steam turbine at the Jertovec power station in Croatia. Siemens had applied their 90 MW Model V94.0 gas turbine in 1974 at an initial rating of 90 MW. The first unit was installed in Vienna for an extension of the Leopoldau district heating station, followed by two more at the South Munich district heating plant. GE sold five of their Frame 9B gas turbine at the initial rating of 85 MW of which the first was installed by Electricité de France (EdF) as a peaking plant on a site in the north of the country near Valenciennes in 1975. Of the first production batch, three were sold to the Berlin utility BEWAG, for a district heating plant, although not a combined cycle, and one to the Electricity Supply
WPNL2204
A brief history of development
19
2.2 Angleur 2, Belgium: the schematic diagram of the definitive combined cycle with high-temperature gas turbines, a single-pressure steam cycle and no supplementary firing. It was completed in 1978.
Board of Ireland which was used to repower a 30 MW steam turbine at the Marina power station, near Cork. By 1980, there were 14 combined-cycle stations operating in seven countries of which six were in the USA and two each in Belgium and Mexico, and one each in Austria, The Netherlands, Ireland and Germany. Of these, two were repowering schemes in Belgium and Ireland; two were district heating schemes in Vienna and Munich. The gas turbines of these plants were the first to be designed specifically for power generation and with further development achieved outputs of 100– 160 MW and would come to dominate the combined-cycle market up to 1995. By 1980, there was a clear distinction for the heavy-frame gas turbines, between the European designs and the aero-engine-inspired American designs. The Europeans, who were among the leading power engineering companies, had from the beginning approached gas turbine design from the viewpoint of power generation. Their gas turbines were characterised by large silo-type combustors mounted on top or to the side of the casing, while the American designs were born out of the aero engine technology from which their industry had developed and had a ring of combustor cans arranged around the machine body: the so-called can–annular system. The specific difference was in the fact that the actual burners in the American designed units were smaller than in the European machines with their large silo combustors. In their original configurations before the introduction of dry lowemissions burners, Siemens for the V94 gas turbine had eight burners in each of their two combustor silos. Brown Boveri in the Type 13 gas turbine had only one in a single top-mounted silo. The GE Frame 9E gas turbine had 14 combustor cans each with a single burner, as did Westinghouse with their 60 Hz Model W501D. Before 1980 it was not assumed that the gas turbine would always burn natural gas. Particularly in the Asian Pacific countries it was thought that heavy oil would be
WPNL2204
20
Generating power at high efficiency
burned, and many saw that the European machines with their large silo combustors were better able to cope with heavy-liquid fuels. These gas turbines were much larger than the aero engines and their derivatives that had preceded them, but they ran at synchronous speed and could be started and run up from cold to full load in about 10 min, which was much quicker than a steam turbine of equivalent size. They had higher operating temperatures and consequently higher efficiency. In time this meant that they would support a high-pressure steam cycle which together would give a great boost to combined-cycle efficiency. These gas turbines also introduced a new combined-cycle concept as the repowered steam plant. Suitable plants for repowering would be those built in the early 1950s with steam turbines of 30–60 MW, or roughly half the capacity of the available gas turbines. Demolishing the fired boiler and replacing it with a new heat recovery boiler and a gas turbine would increase the output by about 200% and, since all the fuel was consumed by the gas turbine, the efficiency would be significantly improved from about 30% to at least 45%. Repowering is very much a niche market. While there were a few schemes in North America and Europe, and one in Japan, it was only when the much larger Fclass gas turbines came into the market after 1995 and could support the steam conditions of turbines up to 150 MW, that any further repowering schemes were undertaken in the 50 Hz market. In Europe, with its monolithic, publicly owned electricity supply industries in all but a few countries, the concept of a combined cycle then was of a mid-load plant which would start and stop once or twice a day and probably be shut down most weekends. It had a vertical heat recovery boiler with a single pressure to the steam turbine and a separate low-temperature preheater stage to hold up the temperature of the deaerator and so to avoid risk of dew-point corrosion through condensation in the top of the boiler. It was cheaper to operate than an old coal-fired plant that burned coal just to keep warm and to be ready to run for a few hours at peak time, as had been the case up to then. Dry running capability was a feature of these early heat recovery boilers but it was really an emergency measure and required the gas turbine exhaust temperature to be reduced. For the plant in Angleur the exhaust temperature of the W251B was 504 °C but, to run through a dry boiler, the exhaust temperature had to be held below 480 °C. The two gas turbines there, in fact, ran for nearly 6 months through dry boilers during a repair outage on the steam turbine generator in 1984. At this time there was a considerable degree of commonality between the combined-cycle designs of Europe and North America. The basic combined-cycle block had two gas turbines, two boilers and one steam turbine, and the gas turbines were rated at between 80 and 100 MW. The boilers were of vertical format with a single-pressure output to the steam turbine and a preheater loop through a deaerator to raise the feedwater temperature entering the main economiser. The only difference was that the American boilers, e.g. that in the Westinghouse PACE 360 combined-cycle package, with the more powerful W501D gas turbine, had
WPNL2204
A brief history of development
21
duct burners to increase steam production and to compensate for the lower gas turbine output at higher ambient temperatures. It is a practice which has continued in the USA to the present day. Although combined-cycle designs had been accepted in the southern USA which in the early years was certainly the largest individual market, they were still relatively few in number. It was an initial move to deregulate the electricity supply industry and to encourage the deployment of combined heat and power schemes in industry that carried the gas turbine industry forward in the USA, but there was still little interest in combined-cycle design being shown in Europe. The Public Utilities Regulatory Powers Act (PURPA) of 1979 was a measure introduced by the Carter Administration to promote economy in energy production through combined heat and power. Under the Act, any operator was able to sell electricity to their local public utility at the market price from a combined heat and power plant but, to do this, a prospective operator had to find a qualifying steam host in order that the plant could be licensed and built. PURPA effectively revived the gas turbine market in North America. The steam host could be a paper mill, a chemical plant, a refrigeration plant or any other site with a large and regular demand for process steam. Many installations were of a size that required a gas turbine of less than 40 MW. Some installations used a 25 MW aero-derivative gas turbine with a heat recovery boiler and a small steam turbine with steam taken from the high-pressure header to process and from a steam turbine extraction point or back pressure, for low-pressure process steam. Generally the steam demand determined the number and size of the gas turbines. How much steam could be supplied from the unfired heat recovery boiler? In this way the gas turbines would be likely to have surplus power for sale. The way in which this worked in practice varied from state to state. In some states the industrial power plants were dispatched by the utilities and therefore had to install back-up boiler plant to guarantee supply to the steam host when the gas turbine was not operating. In other states the utility bought power from the independent generators and moved their own plants from base to mid-load and peaking duty. Southern California Edison in 1982 was the first public utility to announce that it would build no more power plants but would buy future supplies from independent suppliers. Many large combined cycles were built for combined heat and power schemes using the heavy-frame 60 Hz gas turbines of the time, which were rated between 75 and 100 MW. For these schemes, there might be two, three or four gas turbines with heat recovery boilers supplying a single steam turbine. There could be one or two process steam bleeds from the turbine and a back-up supply throttled down from the high-pressure steam header. The technology of these schemes was based on the requirement to run continuously for long periods. Hence an entirely different concept of heat recovery boiler was developed with the horizontal natural-circulation design. While this boiler may have been reliable in a combined heat and power scheme running continu-
WPNL2204
22
Generating power at high efficiency
ously between production batches, which might shut down only twice or three times a year, it is a totally different application from load following in a public supply network with daily or weekly stops and starts. Many schemes, too, were combined cycles with small gas turbines including an aero-derivative turbine. However, in a country of more than 200 million with a largely uniform lifestyle, there were some very large process industries which supported a large combined cycle with supplementary firing of the boilers to balance steam and electric loads. PURPA’s consequence for the gas turbine industry was to bring innovation into the bottom end of the market. The companies such as Solar Gas Turbines, in San Diego, California, and Ruston Gas Turbines in Lincoln, UK, which had grown up as suppliers of mechanical drives to the oil and gas industry found a ready market for small combined heat and power units and developed new models to serve those markets. The aero engine makers, particularly Rolls-Royce and GE, were seeing a demand for units of 25–40 MW which could be met by the core engines of the large turbofan units which, by 1980, had been in airline service on international routes for 10 years. The growing demand for gas in many parts of the world had also created a market for compressor drivers on pipelines and offshore platforms. All these gas turbines had to meet the same environmental standards as the large gas turbines in utility service particularly in the reduction of nitrogen oxides (NOx). Much of the development over the next 10 years across the gas turbine industry was in the production of dry low-NOx combustion systems both for all the heavyframe gas turbines, including the small units below 10 MW and the large aero-derivative turbines which were finding increasing application in industrial combined heat and power schemes. The growing environmental movement during the 1970s had first focused on the consequences of acid rain due mainly to sulphur emissions from coal-fired power stations. The first stations to be fitted with flue-gas desulphurisation (FGD) systems started to come into service at the end of the 1970s in Germany and the USA. This had an immediate effect on the economics of coal-fired generation because it added to the capital cost without increasing the output and, because the FGD system created a back pressure on the boiler, it lowered the efficiency of the station. It had one benefit in that the limestone required to operate the system was transformed into calcium sulphate (gypsum) for which there was a ready market in the building industry for making plaster board for ceilings and partition walls. For the gas turbine industry the immediate concern was to reduce NOx emissions. Gas turbines produced visible yellow smoke when burning liquid fuel with high sulphur content, and the other problem that occurred because of their high firing temperatures was the brown colour of nitrogen dioxide. Very few gas fields have been termed sour gas, containing sulphur and the main concern for hightemperature combustion was NOx. Water injection went some way to alleviate the
WPNL2204
A brief history of development
23
problem but the industry itself sought to develop a dry combustion system which would reduce the formation of NOx from the combustion air. For much of the 1980s the gas turbine market in Europe was quiet. The principle of the combined cycle was well understood in the few plants that were built and the industry was confident to bid contracts based on these designs in other countries. Discovery of new gas fields continued apace, particularly offshore Southeast Asia, in South America and in the northern North Sea. Gas was coming into Europe from North Africa and Siberia but, as natural gas entered the market, it first replaced coal gas in the domestic market. For most countries where there was no energy market for coal-derived gas but which had found natural gas, the only way to exploit this new resource was with a large end use such as a power plant that would put the new gas supply infrastructure in place. There were few opportunities for combined-cycle development, but those that were built effectively defined the technology for what would follow in the next decade. It was not until the discovery of gas in and offshore southeast Asia and Australia that the combined-cycle market started to develop with the start of a trade in LNG between the producers, principally Australia, Indonesia and the United Arab Emirates, and the utilities in Japan, South Korea and Taiwan. As the gas fields were developed and supplies came ashore, so the first moves were made to install combined cycles in Japan, Taiwan, Malaysia and Thailand in 1983, and later in India where three stations were built on a pipeline running from Mumbai to Delhi and taking gas from the Bombay High field in the Indian Ocean. For these plants the gas turbines were early versions of gas turbine models, some of which with further development are still available today. In 1979, a general measure of 75 vppm at the gas turbine exhaust was accepted as a target for the industry on which to improve. Then 10 years later the consensus was that for natural gas the limit would be 25 vol.ppm and, for oil, 42 vol.ppm which could only be met by steam or water injection into the combustor. Nearly 30 years later contracts still specify NOx capability at 25 vol.ppm when firing gas and 42 vol.ppm on oil, but in reality much lower values are attainable with gas. By 1986, Siemens and ABB, formed by the merger of Brown Boveri with the Swedish ASEA group, had their own dry low-emissions burners and were marketing them with their gas turbines where local rules required, but these were only active with natural gas and, for liquid fuel, water injection still had to be used. All the above values are as measured at the gas turbine exhaust flange. In some parts of the USA, however, emissions have been defined as measured at the outlet of the stack. In the New England states the requirement is for 3 ppm coming from the stack and, to meet this, a catalyst must be installed in the heat recovery boiler to promote a chemical reaction with ammonia to reduce NOx to nitrogen and water. The reaction works best above 300 °C and the catalyst is therefore placed in the boiler upstream of the low-pressure superheater. The three Asian Pacific countries were poor in energy resources and were
WPNL2204
24
Generating power at high efficiency
obliged to buy all their oil and coal excess to their own production. They were as anxious as other countries to get oil out of power generation and went for nuclear power and natural gas. Nuclear plants were built first and then combined cycles, but there was still some concern about the availability of natural gas. In the decade from 1980 to 1990 the market for combined cycle was gradually expanding across the world with most activity focused on the Asian Pacific countries and southeast Asia. Interestingly in Japan which, like France, was developing a large nuclear power park, a large combined-cycle programme was also implemented for mid-load duty. Under Japanese law there is a requirement for the annual technical inspection of all steam-generating plant, which of course includes power station boilers. On a combined cycle every boiler must be inspected at once, which on a 2+2+1 combined cycle means shutting the whole plant down and losing the entire output for the duration of the inspection. Nevertheless the first of the Japanese combined cycles to enter service was at Tohoku Electric’s Higashi Niigata site 300 km north of Tokyo on the Sea of Japan coast. The combined cycle consisted of two blocks rated at 545 MW each with three M701D gas turbines unfired heat recovery boilers and a steam turbine. The notable feature of this plant is that it has the first gas turbines to enter service equipped with dry low-emissions combustors. Next Tokyo Electric Power at Futtsu installed 14 single combined-cycle units each consisting of one GE Frame 9E gas turbine, a heat recovery boiler and a steam turbine. Taiwan’s first combined-cycle plant at Tung Hsiao some 100 km south of Taipei on the west coast of the Island started as in Japan with blocks of 3+3+1 configuration which, being in a 60 Hz power system, were rated at about 360 MW. Two were supplied by GE each with three Frame 7EA gas turbines and a Toshiba steam turbine, and the third was by ABB with GT11N gas turbines. The GT11N with its silo combustor was chosen because of the initial requirement to burn heavy fuel oil. This also went into operation in 1983. Elsewhere in Asia, Thailand and Malaysia in particular exploited new gas fields in the gulf of Thailand, with Bang Pakong, 900 MW, in Thailand, and Paka, also 900 MW, in Malaysia. India had discovered the Bombay High field in the 1970s and constructed a pipeline from a shore terminal north of Mumbai to Delhi with three combined cycles along the route: Kawas, with four GE frame 9E gas turbines in two 300 MW blocks was the southernmost plant followed by Anta, with three Alstom GT13D gas turbines in a 3+3+1 arrangement, and Auraya, with a similar arrangement of Mitsubishi 701D gas turbines. In 1984, The Electricity Generating Authority of Thailand (EGAT) completed their first combined cycle at Bang Pakong about 120 km south of Bangkok. It had two blocks each with four of the Siemens interim Model V94.1 gas turbines and a steam turbine for a block capacity of 440 MW. The plant was intended to burn gas from the Erewan field in the Gulf but one block was designed for dual-fuel
WPNL2204
A brief history of development
25
operation, and a fuel treatment system was installed so that it could if necessary run on liquid fuel at least until the extent of the Gulf fields was fully known. In reality, apart from being commissioned on oil, none has been burned since to generate electricity. In 2004 the plants were still running in base load after operation for 20 years. The early combined-cycle operators in India had an unusual problem of competition for fuel. Natural gas was required for fertilizer production and as a result there was a shortage of fuel for the combined cycles because of the demand of the fertilizer industry. The southernmost of the three combined cycles at Kawas, with four GE Frame 9E gas turbines in two 300 MW blocks, was only allowed to run one gas turbine in its early years, which meant cycling half-blocks between each gas turbine to even up wear. The answer was to burn naphtha, of which there was a surplus at Indian refineries, and the station, which was completed in 1993, was converted in 1996. In Turkey, a small gas field was discovered near Hamitabad in the European province and, with additional supply coming from Russia to Istanbul, the first combined-cycle plant contract was awarded to Brown Boveri (now the Alstom Gas Turbine Division) to be built in two stages and completed in 1989. In 1987, the catastrophic explosion of a reactor at the Chernobyl nuclear power station in the Ukraine spread radiation northwards over Belarus and across Scandinavia where it was first picked up 2 days later on radiation detectors at the Forsmark nuclear power station in Sweden. The event turned public opinion against nuclear power over much of Europe and no more so than in Italy at a time of government crisis. The price of a new Christian Democrat–Social Democrat coalition was the closure of the country’s three operating nuclear plants and the cessation of construction of a fourth at Montalto di Castro. Italy, denied nuclear power for political reasons and with all its hydro and geothermal resources used up, had no option than to import oil and gas and to use them at the greatest efficiency. For the domestic gas turbine industry there suddenly appeared a market for small industrial combined heat and power schemes and the repowering of the older oil-fired steam sets with gas turbines and heat recovery boilers replacing the original fired boilers. Two stations with 12 gas turbines in Italy and the Dublin North Wall scheme in Ireland account for the repowering schemes during the second combined cycle decade up to 1990. Another scheme which could be considered repowering was in the USA at Midland, Michigan, where construction of a nuclear power station had been stopped in the mid-1980s and it was decided to modify the steam turbines to accept the output of 12 heat recovery boilers behind ABB GT11N gas turbines. The gas turbines of 100–150 MW rating which accounted for the majority of combined cycles built during this period had higher exhaust mass flow and temperature and could support a higher-pressure steam cycle. The amount of exhaust energy was such that it could be best recovered with a two-pressure heat recovery boiler. There is a hint of this in the Angleur steam cycle where there is a
WPNL2204
26
Generating power at high efficiency
feedwater preheater loop in the top of the boiler to extract as much of the low-grade heat left to hold up the deaerator temperature. For the much larger gas turbines the heat distribution through the boiler is sufficient to support a second evaporator and superheater at a lower pressure. With this arrangement efficiency was around 47– 49% and in some cases over 50%. By 1990, the combined-cycle market around the world had risen to 53 plants with 161 gas turbines and an aggregate capacity of 24 384 MW. Of these, 14 were in the USA with 48 gas turbines, 27 of which were in multishaft industrial combined heat and power schemes, including the Midland, Michigan, scheme with 12 gas turbines. In Japan there were four plants of which Tokyo Electric Power Company’s Futtsu site had 14 single-shaft blocks of Frame 9E gas turbines, and Chugoku Electric’s Yanai site had eight GE Frame 7 EA gas turbines. Six schemes in Italy were all repowering steam plants with two Fiat TG50 gas turbines repowering each of six steam turbines. Still there was little impact of the combined cycle in Europe. A number of small industrial combined heat and power schemes and district heating schemes had been built mainly in The Netherlands, Spain, Italy and Finland, but few large combined cycles. All this was about to change when in 1990 the first steps were taken to privatise the electricity supply industry of the UK. It resulted in the creation of five generating companies, namely National Power, Powergen, British Energy, Scottish Power and Scottish Hydro, with 12 regional electricity companies distributing electricity in England and Wales, and with the right to build their own generating plant; finally the National Grid Company managed the transmission network into which the generators had to sell their power. Put simply, the electricity supply industry was no longer run by the Government. Generation had been separated from transmission and anybody could generate electricity and sell it to the grid at the market price. The idea was copied around the world and, although some countries retained the transmission system in public ownership, the immediate effect was a sudden burst of activity into industrial combined heat and power where there had been none before, and a rush to build combined cycles to replace old and inefficient coal- and oil-fired capacity. The first combined cycle in the UK was installed at Roosecote, near Barrow-inFurness in northwest England, where a 225 MW combined cycle was erected in the turbine hall of a former 120 MW coal-fired power station which had four 30 MW steam sets. The refitted turbine hall and a few outbuildings were all that remained of the original power station. The rebuilt plant went into operation in 1991. Several other combined cycles followed in quick succession so that, by the end of 1995, 11 plants had been built with an aggregate capacity of 8000 MW and there was none of the former coal-fired power plants left in operation with generating sets of less than 200 MW. Some of the larger plants built since 1960, including Pembroke (four 500 MW oil-fired plants) and Drakelow (four 350 MW coal-fired plants) have since been demolished to prepare for the installation of new combined-cycle plants.
WPNL2204
A brief history of development
27
2.3 Limay Bataan, Philippines: the country’s first combined cycle which was oil fired and went into service in 1994, 10 years before the arrival of gas in Batangas province.
In some countries where no gas was available, and there was a need to add new capacity, the combined cycle, with its higher efficiency and lower construction costs, still had advantages over an oil-fired steam plant, particularly if the country had to import all of its oil supplies. One such country was the Philippines where in 1994 the first combined cycle went into operation at Limay Bataan, located about 120 km from Manila around the north side of the bay (Fig. 2.3). It is oil fired and consists of two 450 MW blocks each with three Alstom GT11N gas turbines and a steam turbine. During construction the Malympaia gas field was discovered about 450 km offshore of Batangas, a port city in southwest Luzon. With no domestic gas market the only way to develop this field was to provide a concentrated market, which effectively meant power generation. Batangas is the location of the Shell refinery, and it was here that the gas would come ashore. Santa Rita with four single-shaft blocks of Siemens SGT6-3000F gas turbines which was completed in 1999 ran for 2 years on liquid fuel before gas came ashore. Two other combined cycles were later built in the same region. In the Middle East, Saudi Arabia, with large fleets of simple-cycle gas turbines running on crude oil, opted for its first combined cycle by converting eight simplecycle gas turbines at Rabigh, 150 km north of Jeddah on the Red Sea coast, into two combined-cycle blocks with eight heat recovery boilers and two steam turbines. For this project, since the gas turbines, early versions of the ABB Type GT11, were burning crude oil, the boilers had to be fitted with soot blowers to clean the high-
WPNL2204
28
Generating power at high efficiency
pressure superheater tubes which were in the hottest zone of the boiler and therefore the first to encounter the incoming exhaust gas stream. Soot blowers are commonplace on oil-fired steam plants, but this was the first time that they had been used on a combined cycle. Saudi Arabia would later specify soot blowers on all the subsequent combined cycles. For these boilers, soot blowing using high-pressure steam is a daily occurrence lasting about an hour. In the rapidly growing economies of the Middle East and Asia, combined cycles were built as base-loaded plants to support the growth in electricity demand. On the majority of sites the gas turbines were installed first and commissioned to operate in simple cycle while the heat recovery boilers and steam turbine were erected behind them. Each gas turbine would have a valve in the base of the stack so that, when the boiler was connected behind it, the original stack served as a bypass. In Europe, none of the new combined cycles was built in stages and there was no economic justification for simple-cycle operation. They were built in mature power systems with low rates of growth in demand and significant reserve plant margins The majority of the initial installations were in 2+2+1 arrangement with vertical boilers. It was only when American developers came into the market and brought the horizontal-boiler technology with them that these boilers started to appear in Europe in any great number. The aero-derivative gas turbines which had come into utility service for peaking and standby duty in the 1960s were now much larger and with dry low-emissions combustion systems in the generator and mechanical drive versions could be operated anywhere. The GE LM6000, which was introduced in 1990, was a turbofan core engine rated at 42 MW and running at 3600 rev/min and could therefore drive a 60 Hz generator without the need for a gearbox. Several have been installed in combined heat and power systems. Rolls-Royce produced a 28 MW version of their RB211 turbofan engine which has been sold to industrial combined heat and power schemes in Europe and South America. During the early 1970s, Rolls-Royce built a number of generator packages based on their Olympus engine and had produced conceptual designs for the combined cycle based on the Olympus 593 engine of the Concorde supersonic airliner, and the RB211 turbofan which was then just coming into airline service. Then, 20 years later, four RB211 turbofans were installed in a combined cycle at Samarinda, on the Island of Borneo in Indonesia (Fig. 2.4). The station consists of two 75 MW blocks each with two RB211 turbofans and a 25 MW steam turbine. At the time, Rolls-Royce owned Northern Engineering Industries which included turbine maker CA Parsons, in Newcastle upon Tyne, and the boiler maker International Combustion, of Derby who had been a subcontractor to CMI on several of the combined cycles in the UK for which the Belgian firm had supplied the heat recovery boilers. In fact, for a few years, Rolls-Royce had the complete capability to design and build a combined-cycle power station, but this was not their main business; later Parsons was sold to Siemens and is now the steam turbine maintenance headquarters for the whole group. Switchgear and control systems
WPNL2204
A brief history of development
29
2.4 Samarinda, Indonesia: one of the few combined cycles with aeroderivative gas turbines. It has four RB211 gas turbines in two 75 MW blocks on the Island of Borneo. (Photograph courtesy of Rolls-Royce.)
were sold to the Austrian group VA Tech, who themselves were taken over by Siemens in 2006. The combined-cycle market in the early 1990s was all based on multishaft plants with two, three or four gas turbines powering a single steam turbine. The most commonly used gas turbines at this time were uprated versions of the models introduced in the mid-1970s and with outputs between 120 and 150 MW, resulting in a combined-cycle block in the commonest arrangement of between 350 and 450 MW. All the major gas turbine companies had new models under development in 50 and 60 Hz versions which would enter service from 1992 onwards. The first F-class gas turbines had in fact appeared in the USA before 1990. GE announced the 150 MW Frame 7F gas turbine in 1988, and Westinghouse followed with the 501F gas turbine a year later. These were high-temperature machines with turbine inlet temperatures nearer to 1300 °C and were introduced with a number of common features. All drove the generator from the cold (intake) end of the machine, which meant that there was a straight exhaust gas path to the heat recovery boiler with fewer parasitic losses. Indeed the Frame 7F was the first heavy-frame gas turbine of GE that did not drive from the exhaust end. All had dry low-emissions burners as standard equipment. The starting system was based on a static frequency converter operating through the generator. The prototype Frame 7F gas turbine was installed at Virginia Electric Power’s Chesterfield site, initially for simple-cycle testing, and was converted to a combined cycle in 1992. The first examples of the Westinghouse W501F gas turbine went to a repowering scheme at Florida Power and Light’s Fort Lauderdale station in 1991. In Europe, Siemens launched three F-class gas turbines: the V64.3 at 60 MW in
WPNL2204
30
Generating power at high efficiency
1988, the V84.3 in 1991 and the V94.3 in 1992. The first to appear on the market was the V64.3 at 53 MW of which two were sold to Helsinki Energy for a combined-cycle district heating scheme at Vuosaari in the eastern suburbs. The combined-cycle market in Europe started in 1990 with privatisation of the electricity supply in the UK. First the Central Electricity Generating Board (CEGB) was split into three generating companies: National Power, Powergen and British Energy, the nuclear plant operator. The 12 area distribution boards became regional electricity companies, with the right to build their own generating plant. Few decided to build but instead entered power purchase agreements with the independent plant operators. This coincided with the relaxation of a European Union ban on using natural gas for power generation and increasing concern for the environmental effects of power generation notably the acidification of some lakes in southern Sweden. The UK had a highly developed electricity supply system in which coal supplied 80% of the power demand from a series of large power stations with individual generating units of 500 and 660 MW. These were supported by older stations with smaller, less efficient units which were retained for load-following duty in a complex merit order. Almost all these smaller plants had been built before 1960. The first combined cycles were based on the 100–150 MW class of gas turbines of which the larger units achieved efficiencies of about 52%, compared with 36% for the best coal-fired stations. Very soon the impact of the new combined cycles was felt as one by one the oldest power stations were closed down and demolished so that, within 5 years, there were no coal-fired generating plants with units of less than 200 MW remaining in service. All this was happening at a time when British public opinion was coming to terms with the result of the many privatisations of state-run industries which preceded that of electricity. Public opinion was slow to take up choice of supplier and particularly of gas, which enjoyed a nationwide domestic market for cooking and space heating. The management of British Gas saw itself as a supplier to the domestic market and was taken aback by the sudden rush for gas-fired power generation. If they sold all their gas to the power stations there would be none left for domestic consumers, which was politically sensitive when there was still hostility to privatisation and much criticism of the salaries paid to the directors of the newly privatised industries. All the early combined cycles in the UK had water or steam injection for NOx control. This was because they were designed as dual-fuel systems with distillate oil as a back-up fuel for which they would in any case have to use water injection to achieve the guaranteed NOx levels, whether or not a dry low-emissions combustor was available. The price of gas was raised to power generators who could counter it by accepting an interruptible tariff. This meant that gas supply could be shut off for up to 20 days a year, which meant that developers would have to carry the additional
WPNL2204
A brief history of development
31
cost of designing their gas turbines for dual-fuel operation with provision for water injection for NOx control when burning oil and provide tanks to hold at least 20 days’ supply of distillate. This was the turn of events which brought in other North Sea gas producers joining with power plant developers as their fuel supplier. An 1800 MW combined heat and power scheme serving the Imperial Chemical Industries (ICI) chemical works on Teesside was supplied from a special collector main linking a number of North Sea oil platforms so that the associated gas could be collected for use onshore instead of being flared off at the well heads. Powergen, one of the three generating companies, procured its own gas supply and built a pipeline from a terminal at Killingholme on the south Humber estuary, where they had a 900 MW combined cycle, to their Cottam power station, which was converted to dual firing with coal and gas. From Cottam the pipeline ran south to their Rye House combined cycle near Bedford and, from there, past London to their large oil-fired power station on the Isle of Grain. These moves freed up the gas supply and developers did not have to obtain fuel contracts from British Gas, although the gas supply was mostly transmitted through the British Gas trunk mains. It was the signal to introduce the new gas turbines. One of the first of the new machines was the ABB GT13E2 gas turbine announced in 1992. It was basically a GT13E in which the silo combustor had been replaced with an annular combustor incorporating their environmentally friendly cone-shaped (EV) low-emission burners, and improved compressor and turbine blading gave a 10% power increase. The first installation at Deeside in northwest England was a 500 MW block with an efficiency of 54%. In time it could be seen that this gas turbine was a test vehicle for the annular combustors of the larger Fclass gas turbines that would follow. In 1993, Siemens relaunched their family of F-class machines as three mutually scaled models with an annular combustor replacing the horizontal silo combustors of the previous models. Both ABB and Siemens, with their F-class gas turbines, had dispensed with the silo combustors and adopted an annular combustor arrangement that reduced the cooling load of the hot-gas path and resulted in a short direct path from the combustors to the turbine inlet. The GE and Westinghouse units retained the can– annular combustion system but with a dry low-emissions burner system in each can. By 1995, the first of the F-class gas turbines were in service in Europe and were not without their problems, which were made worse by the fact that the promise of significant improvements in performance attracted many companies to order off the drawing board. Not only this, but with the simultaneous launch of scaled models for 50 and 60 Hz applications there was the likelihood that a design problem in the 50 Hz machine would also appear in the 60 Hz machine and vice versa.
WPNL2204
32
Generating power at high efficiency
This is what happened first with the GE F-class machines, and this was further complicated by the difference in operations and physical sizes of the units for 50 and 60 Hz systems. GE had launched the Frame 7F gas turbine first in the USA in 1988 and then, for the Frame 9F for the 50 Hz market, set up the same joint development and manufacture with Alstom as they had with the Frame 9E. The Frame 9F was first installed in 1992 as a simple-cycle unit on an EdF site at Genevilliers in the northern suburbs of Paris. The first utility order was in England in 1993 for two units for a 660 MW combined cycle at Keadby, on the former site of an old power station demolished some years before in the lower Trent valley, about 100 km east of Nottingham, with the aim for entry into service in 1995. When the Frame 9F was first announced, it was as a gas turbine specifically for combined-cycle applications. As such, it would achieve an efficiency of 55% compared with 52% which was being reported by operators of the combined cycles then coming into service in the UK and elsewhere. Marketing in Europe and Asia was with GEC Alstom and almost 30 gas turbines were in effect ordered off the drawing board before Keadby went into operation. By then, GE had announced upgraded versions of both machines as Frame 7FA and Frame 9FA. The initial problems which developed on the Frame 9F were confined to that gas turbine and were the result of a specific issue of manufacture with one European supplier of the rotor tie bolts. It did not affect the Frame 7F gas turbines assembled in the USA nor any of the upgraded FA machines. They had entirely different problems with materials used in the power turbine stages and, because of the different operating patterns, physical sizes and synchronous speeds, the Frame 9FA started to fail at about 1000 h and the Frame 7FA at 10 000 h. A massive repair programme was launched around the world and several actions were taken to alleviate the problems for different operators. By the end of 1995 all the problems had been resolved in both systems. GE marketing of their F-class gas turbines resumed shortly afterwards. GE were not the only supplier of F-class gas turbines to face problems. Mitsubishi had a problem with turbine inlet blade geometry on the 701F at full load which was not difficult to correct and only affected the first four machines at Wang Noi, Thailand. Siemens had combustor vibration, again on full load, which was simply a matter of fixing asymmetrical collars around some of the burners to disturb the parallel flow leaving them. Alstom had a problem of cooling in the second-stage turbine of their upgraded GT24 and GT26 at their introduction in 2001 which had wider implications than simply finding a solution to the problem but, by the summer of 2004, these problems had been resolved and a more powerful gas turbine has resulted with scope for further upgrade in the future. GE’s problems were the first and, since they covered so many operating gas turbines in both markets, they had the greatest influence on what followed. It took some time for the market for the F-class machines to pick up, but there were two consequences for the industry at large: in reorganisation and in gas turbine testing.
WPNL2204
A brief history of development
33
First was the reorganisation of the gas turbine industry which has left four major players in the market for large combined-cycle power plants. It started with the break-up of European Gas Turbines, the gas turbine production company jointly owned by GE and Alstom, with factories in Belfort and Bourogne in eastern France, Essen in Germany and Lincoln in the UK. Alstom relinquished their GE licences and retained the Lincoln and Belfort works, except for the gas turbine production line at Belfort and the offices associated with it. These with the Bourogne and Essen works were incorporated in a new company GE Energy Products Europe (GEEPE). Later Alstom and ABB would merge and, in 2000, ABB would pull out of power generation and become an electronics company providing control equipment to the power and process industries. Alstom remained as an infrastructure company with its primary interests in power generation and rail transport. The final act was the takeover of Westinghouse non-nuclear power business by Siemens in 1999. This brought to an end the Westinghouse–Mitsubishi–Fiat partnership, with Mitsubishi retaining the large 50 Hz machines and the right to 60 Hz gas turbines that they had developed. Fiat pulled out of gas turbine manufacture and joined with Siemens as part of the Turbocare International Maintenance Group. The second change was that the industry could see that there had to be a better way of testing these very large gas turbines. Deregulation of electricity supply which created the independent power producers provided the answer. In the past, whenever a new large gas turbine was introduced, the manufacturer would seek, in Europe and North America, a first customer who would be prepared to give them access to their site for, say, the first 6 months to take performance measurements and to make any adjustments to what was in effect the production prototype. Since all these large gas turbines were destined for the combined-cycle market, the logical development would be to build their own power station. Deregulation brought an end to what had become an inherently unsatisfactory arrangement. The factory test stand, which allowed for a no-load test of a completed gas turbine just to check it out mechanically and to measure the temperature distribution, has been superseded by a load test of the gas turbine and generator in a specially built facility which would in reality be an independent power station owned by the manufacturer, who would be able to conduct extended load tests and to sell the output to the local utility just like any other independent power producer. Siemens built the Cottam development centre in England but have used it not so much as a test of their large 50 Hz gas turbine but rather as an evaluation of a combined cycle with a Benson once-through heat recovery boiler in a utility environment. Mitsubishi built a complete power station at their Takasago works as a test site for their steam-cooled M501G. The gas turbine is arranged in a combined cycle with a separate steam turbine and generator and sells its output to Kansai Electric.
WPNL2204
34
Generating power at high efficiency
The power sales agreement has allowed a number of weeks a year for testing and, in 2 years, Mitsubishi had periods of several weeks’ operation with a steam-cooled rotor for the planned M501H but have since not continued with the development. Alstom installed a GT26 gas turbine in a bay of their factory at Birr, near Baden, Switzerland. They also set up an outdoor stand for the smaller GT8C2, feeding into the same busbar. Only one of the gas turbines can be operated at a time. Both engines are permanent units used for testing components and major design improvements. Just as the switch to annular combustion systems allowed the European manufacturers to develop more powerful designs running at higher temperatures, so the American manufacturers with their can–annular combustion systems moved to steam cooling to reduce the cooling air requirements. Steam cooling was applied to the transition ducts, sending the hot gas from the combustion chamber to the turbine inlet. Since there are 16 combustion cans, there are 16 steam paths between the two headers of the 60 Hz machines. The steam path through the gas turbine is integrated with the intermediate steam pressure and operates in parallel with the reheater when operating at full power. Compared with the air-cooled units on which they were based, steam cooling achieved a large increase in output at a higher turbine inlet temperature. The first units to attempt steam cooling were announced by Westinghouse and Mitsubishi in 1995 as the W501G and the M501G. The first Westinghouse unit was completed in 1998 and went into service at the Lakeland Electric power plant near Tampa, Florida. Initially it ran for 2 years in a simple cycle with a small oncethrough heat recovery boiler supplying cooling steam. It was later developed into a combined cycle which went into operation in the summer of 2001. The period between the installation of the Lakeland W501G and its conversion into a combined cycle spanned the takeover of the Westinghouse non-nuclear power business by Siemens and the conversion to combined cycle was a joint venture with Siemens factories in Germany contributing part of the steam turbine. The completed power plant went into commercial operation in April 2002. Mitsubishi also built a steam-cooled gas turbine and installed it in a purpose built combined-cycle power plant at their Takasago works, near Kobe, Japan. With two power systems operating at 60 Hz in the south and at 50 Hz in the north of the country, they also developed the M701G and installed the first two in a 900 MW combined cycle at Tohoku Electric’s Higashi Niigata station in 2000. Most of the steam-cooled gas turbines are installed in the USA, although the first contract to Mitsubishi was from Korea Electric Power Corporation for an independent power project in the Philippines. Located at Ilijan on the main island of Luzon near the city of Batangas (Fig. 2.5), it was one of three combined cycles built in the area to provide a market for the Malympaia gas field 450 km offshore, which was discovered in 1990. The plant consists of four gas turbines and two steam turbines arranged in two 600 MW blocks and went into operation in June 2002. The other steam-cooled unit is the GE Frame 9H in which steam cooling is also
WPNL2204
A brief history of development
35
2.5 Ilijan, Philippines: inside one of the M501g packages at the power station looking towards the intake with the steam manifolds nearest the camera.
applied to rotating components. The first unit was installed in a combined cycle in the UK at Baglan Bay, near Swansea (Fig. 2.6). It is the only example of its type in operation. Tokyo Electric Power have ordered three units for their Futtsu, Tokyo, site, but these will not be in operation until 2008 at the earliest. The first Frame 7H, a scaled version for the 60 Hz market, is under construction at a site in California. Although a number of steam-cooled gas turbines have been installed in the USA and Japan, there has been very little interest elsewhere and none in the 50 Hz market for a larger unit outside Japan until, in October 2006, Electrabel ordered three of the uprated M701G2 to be supplied in three single-shaft blocks for a new combined cycle at Morata de Tajuna, in Spain. Steam cooling inevitably ties the gas turbine into the steam cycle which complicates start-up, but Mitsubishi use auxiliary boilers that provide coolingsteam supply to the gas turbine until the steam turbine is up to speed and the reheater flow is firmly established. The M701G is not expected to extend significantly the start-up time to full load. However, there is another issue which is of growing importance in the European and Asian markets and that is reliability. Development of the F-class gas turbines was not without problems, but all four companies have put it behind them and report F-class gas turbine reliability up to the levels of the preceding E-class machines.
WPNL2204
36
Generating power at high efficiency
2.6 Baglan Bay, UK: the first and only commercial installation in the power station of the GE Frame 9H gas turbine in a 480 MW combined cycle officially opened in September 2003.
The designation H in the type name is not indicative of steam cooling, but rather of the turbine inlet temperature. In September 2005, Siemens announced the SGT5-8000H, a 340 MW gas turbine without steam cooling and intended for application only in a combined cycle. Furthermore the combined cycle will be supplied only with a Benson heat recovery boiler and the target efficiency is over 60%. Initial testing of the gas turbine at a power station in Germany is intended to validate the design, and only then will it be converted to a combined cycle. Both H-class gas turbines are to be marketed only as combined cycles, but development has come at different times. Baglan Bay had been in commercial operation for nearly 2 years before the new Siemens gas turbine was announced, and market conditions have significantly changed. Development of the Frame 9H had started in the early 1990s when it was seen as a logical step forwards from the F-class machines for base-load duty. Baglan Bay effectively continues commercial testing of the Frame 9H. The argument has always been that it would require optimisation of the steam turbine to push the efficiency over 60% and that is expected to be achieved with the first commercial order in Japan in 2008. Siemens, on the other hand, have designed a combined cycle which is flexible and clearly aimed for 60% with a combination of a higher temperature and therefore more efficient gas turbine, and a much higher steam pressure which again achieves a higher efficiency on the steam side. With this arrangement, 60% is not impossible given that the stated efficiency of the current single-shaft combinedcycle block with the SGT5-4000F is 58.5%. What is different is that the combined cycle for the new gas turbine is designed for greater operational flexibility. For the F-class the preferred form of a combined cycle in Europe is now as one
WPNL2204
A brief history of development
37
2.7 Connah’s Quay, near Chester, UK: one of the first stations with single-shaft blocks to be installed in Europe with four 390 MW units. (Photograph courtesy of GEEPE.)
or more identical single-shaft blocks. Some of the first were installed by GE at Connah’s Quay, near Chester in northwest England with four units (Fig. 2.7), and at Eemscentrale, at Eemshafen, The Netherlands, with five units and Gent Ringvaart, with a single unit in Belgium which went into service in 1997. Eight single-shaft units were installed at Black Point, Hong Kong. The majority of single-shaft systems have been supplied in the 50 Hz market, by the European manufacturers. Each single-shaft block can be supplied as a standalone 400 MW power station or in a group of two or three separate units with shared facilities such as water treatment and control room. The first European-designed installation was Siemens’ King’s Lynn project in eastern England (Fig. 2.8), which defined the basic arrangement adopted by both European manufacturers. The gas turbine is directly coupled to the generator and at the other end there is a clutch linking it to the steam turbine, which can then be separated at shutdown. The gas turbine exhausts straight into the heat recovery boiler at one end and the steam turbine is exhausting axially into the condenser at the other. With this arrangement there is no need for an auxiliary boiler since the heat recovery boiler can supply gland sealing steam to the turbine which at start-up is disengaged from the power train by the clutch. Normally the only visible departure from a completely standard design would be in the heat recovery boiler and in the cooling system. The boiler is frequently a separate contract and may be chosen because of customer preference for a
WPNL2204
38
Generating power at high efficiency
2.8 King’s Lynn, UK: the first single-shaft block for the Siemens interim Model V93.4, which set the basic design for the many blocks that have since been built with the SGT5-4000F.
particular supplier or the existence of local manufacturing capability, or because of the operating arrangements, whether base load or mid-load requiring frequent stops and starts. The cooling arrangement is either an air condenser as at King’s Lynn or a wetcooling system, depending on the availability of water. A third variant is the hybrid unit in which the water is initially cooled in a heat exchanger mounted between the wet section and the fan before it falls into the wet section. The arrangement has advantages on sites beside busy roads and bridges since the dry precooling lowers the temperature in the wet section and reduces the formation of vapour plumes which could present a severe traffic hazard at certain times of the year. Several American operators have found it quicker and easier to obtain a licence for an air condenser system where there may be contentious issues concerning water extraction. At Hays County, Texas, with four 250 MW single-shaft blocks, treated sewage effluent is used as a cooling medium on two blocks, and air condensers are used for the other two. King’s Lynn went into service in November 1996. The first single-shaft combined cycle to be installed in the USA was at St Francis, Alabama, as the first of two 250 MW blocks of the Siemens 60 Hz Model V84.3 gas turbine in 1999, with a second block following 2 years later. The Alstom GT24 single-shaft blocks were the first attempt to produce a standard power plant based on a common power train. In this case the plant is rated at 250 MW for the 60 Hz market. The power train consists of a gas turbine, generator and steam turbine on a single shaft with the gas turbine feeding into the
WPNL2204
A brief history of development
39
heat recovery boiler at one end and the steam turbine exhausting to the condenser at the other. For these plants the heat recovery boiler is a two-pressure design with a oncethrough high-pressure section operating at 160 bar at 540 °C, which is the highest operating pressure for a combined cycle anywhere. The low-pressure section is a conventional drum type. The single shaft is now the most common arrangement for a large combined cycle and manufacturers have made considerable effort to refine the design and to achieve a standard power train system which can operate under all conditions with high reliability. Furthermore operators can have a common basic design for all their power plants with all the advantages of a common spares inventory and ease of maintenance. Flexibility has become more important for the combined cycle as more have been built to meet system growth and to replace old steam plants at the end of their lives. They cannot all be built for base-load duty; somebody has to provide the power for peak demand and that has always required a plant which could run up to full power for 12 h or less on weekdays and may be shut down overnight and at the weekend. Another factor is the increasing renewable energy capacity in many countries. There has always been renewable capacity in the hydropower plants and pumped storage schemes, but water can be stored. Germany has one of the largest components of wind energy, on its system, with over 14 000 MW at the end of 2005, and wind, like electricity, cannot be stored; therefore a back-up power system is required that can respond quickly to changing wind conditions which can affect the amount of power produced at different times of the year. As gas turbines have increased in output, the steam pressures have risen and the high-pressure section of a three-pressure reheat cycle can be up to 135 bar at 560 °C. The F-class gas turbines have all been fitted with variable-inlet guide vanes as a control measure at start-up and also to allow them to run at part load. This could be simply a national requirement to carry a certain amount of spinning reserve for system security, or to run down to part load on weekday nights. This has shown up problems with the horizontal natural-circulation boilers as they are moved to mid-load operation with up to 200 starts/year. This has come to light with the increasing contribution of combined cycles to the power supply. At the end of 2005 in the UK, gas provided over 40% of electricty supply; yet 15 years earlier the country had depended 80% on coal. With the advent of nuclear power, there followed the concept of pumped storage to compensate for their inflexibility of operation by holding up the load factors overnight. If water was pumped from a lake to a reservoir constructed on a hill top, it could be run down to provide peak power during the daytime. In fact, these plants are often used to cover the start-up of gas turbine plants at times of system emergency when a power plant trips out. There is now in effect a merit order of combined cycle. At the top are the single-
WPNL2204
40
Generating power at high efficiency
shaft combined cycles, many with horizontal natural-circulation boilers and with the lowest production costs at a thermal efficiency between 56% and 58%. These would be considered base-load plants although, as in some parts of Europe and the USA, they may be required to run less frequently because of the contribution of large nuclear and modern coal-fired stations. Below these are the combined cycles of the E-class gas turbines built between 1980 and 1995, with an efficiency of 50–54%. These have multishaft configurations with gas turbines from 95 to 150 MW. In Europe at least, most of these have vertical heat recovery boilers and single- or dual-pressure steam cycles with highpressure outputs between 50 and 90 bar. Many of these have for several years been engaged in load-following duties and operating daily in perhaps two 4 h sessions. The same division of boiler design exists between Europe and North America as with gas turbine design. Almost all the combined cycles have horizontal naturalcirculation boilers, and attempts to operate a similar merit order have shown up serious problems with the horizontal-boiler designs. At the higher steam pressures there is the additional problem of the time taken to start up from cold. These boilers were designed initially from the original combined-cycle concept with a small gas turbine as a base-load feedwater heater. With further development they became the standard format for the combined heat and power schemes built under the PURPA directive. As such, these plants depended on steam demand for a continuous process with perhaps only 1 or 2 starts/year which the horizontal boilers were well able to handle. As soon as these older combined cycles go into mid-load operation the problems start, with fatigue failure of welds particularly between tubes and drums and consequent loss of availability. The exceptions are the small number of plants which have once-through boilers of low thermal inertia and which were designed for mid-load duty in the competitive merchant plant market. Until now the performance improvements which have raised the efficiency of a combined-cycle plant have been nearly all due to the gas turbine. Gains in efficiency which come from the steam cycle are the result of the higher gas turbine output and the ability to support higher steam pressures and temperatures, together with the recovery of various waste heat outputs from the gas turbine fabric. Preheating fuel to about 160 °C is a common practice with all combined cycles. For the Alstom GT24 and GT26 the pressure ratio of 32 to 1 means that air bled from the compressor for turbine blade cooling must itself be cooled giving up heat to the high-pressure steam cycle. On the steam-cooled gas turbines which all have the can–annular combustor system, part of the the returning flow to the reheater is connected to the inlet manifold of the transition ducts, and the outlet is returned to the reheater outlet. Experience over 50 years has shown us that the combined cycle is inherently a flexible system which can be operated in different ways over its lifetime. This is a feature that we cannot afford to overlook in a system which is turning more to gas as the fossil fuel of choice.
WPNL2204
3 Some early schemes
The first combined cycles were built at a time in Europe when the electricity supply industry in many countries was in state control and the power stations were mostly large steam plants either coal or oil fired but, even as early as 1960, there were worries about the cost of fuel and the need to improve the efficiency of power generation to meet an ever-rising demand for electricity. A few countries in Europe, which had depended mainly on hydropower up to then, were starting to build thermal power plants either because their hydropower potential was all used up, or as in parts of North America it was too far away to develop economically. So the cost of fuel, at a time of rising electricity demand, provided the incentive for combined-cycle development. The first examples certainly showed improved efficiency, but the results were hampered by the low operating temperatures of those first gas turbines. By 1960, the maximum gas turbine output available for both aero engines and the heavy-frame industrial gas turbines was little more than 25 MW. It was such a gas turbine, the Brown Boveri GT12, which was used for the first European installation, Korneuburg A, which came into operation in that year. All these early gas turbines had low firing temperatures and low exhaust temperatures, which meant that supplementary firing, similar in action to the afterburner on an aero engine, but operating continuously, was required to raise the gas temperature entering the heat recovery boiler so as to produce sufficient quality and quantity of steam for the turbine. However, burning additional fuel was not efficient and it would require a higher power gas turbine with an exhaust temperature around 500 °C to eliminate it. This first plant, however, ran as a base-load unit for 14 years and logged 6000 h/year. It was therefore able not only to demonstrate the performance of the combined cycle but also to impart knowledge of the maintenance requirements of a gas turbine and particularly the life of turbine blades exposed to high-temperature gases. Then 9 years later, in Belgium, a Sulzer N1101 gas turbine rated at 23 MW formed a combined cycle with a fired boiler since the exhaust temperature was less than 400 °C (Fig. 3.1). Angleur was very much built to study the performance of 41 WPNL2204
42
Generating power at high efficiency
3.1 Angleur, Belgium: the Sulzer N1101, an early European gas turbine rated at 23 MW, with multicylinder design and free-standing combustion chamber. (Photograph courtesy of CMI.)
the heat recovery boiler, which was designed for mid-load duty with daily start and stop, and to see how the gas turbine and steam turbine would respond to load changes and faults on either side of the boiler. Initially it was seen that a fault on the steam turbine would not propagate back to the gas turbine and that a common grid fault shutting down both generators would damage neither turbine. Angleur had no bypass stack but was provided with a steam bypass straight to the condenser. There was no need to run the gas turbine independently and so there was no need for a bypass stack which would add to the cost and the maintenance burden. Also the exhaust silencer of the gas turbine was moved to the top of the boiler. Further development had to wait for the arrival of more powerful gas turbines, but these two plants had demonstrated the principles of the modern combined cycle which still hold good today. It would be another 10 years before the availability of large gas turbines rated at around 100 MW and running at synchronous speed would launch the combined-cycle market in the world at large. Gas turbine development in Europe continued to focus on power generation and, by 1973, Brown Boveri had introduced two new models, both of which ran at synchronous speeds. These were the GT11 for 60 Hz markets, launched in 1968, and which was assembled in the USA at the company’s factory in St Cloud, Minnesota, and, in 1971, the GT13 for 50 Hz markets which was initially rated at 62 MW. By 1970, application of the gas turbine as a means to improve the efficiency of power generation was widely accepted. In the USA, both GE and Westinghouse
WPNL2204
Some early schemes
43
3.2 Korneuburg B, Austria: a combined cycle completed in 1980 and still operating 25 years later after a gas turbine upgrade.
had introduced the first gas turbines designed specifically for power generation and related applications and a few combined cycles had been built in the southern USA and Mexico. By 1974, Brown Boveri had uprated the GT13D gas turbine to 76.5 MW which with an exhaust temperature of 491 °C could be the basis of a 120 MW combined cycle. The first order for a combined cycle based on this gas turbine was from the Dutch utility PNEM at their Donge site which went into service in 1975. With an efficiency of 45.6% and with an unfired heat recovery boiler, it was the most efficient combined-cycle plant so far built and pointed to further improvements over the fully fired units with which it then competed. Then 4 years later NEWAG decided on a similar combined-cycle plant to be built as Korneuburg B with an uprated version of the gas turbine from 76.5 to 81 MW and a slightly modified steam cycle (Fig. 3.2). It is an indisputable fact that hot gas rises and that therefore the logical arrangement of a heat recovery boiler should be vertical. This is not now what is found at the majority of new combined-cycle sites but, for these early projects, designers did indeed configure the heat recovery boiler with a vertical gas path. The boiler is the key to the performance of the combined cycle, and the object of its design is to obtain the maximum energy recovery from the gas turbine exhaust. It can be regarded as a stack of heat exchangers with the economiser at the top above the evaporator, and the superheater at the bottom, which is repeated for each pressure level. In a vertical heat recovery boiler the tubes are arranged horizontally across the
WPNL2204
44
Generating power at high efficiency
rising gas flow. They are small-bore finned tubes supported in tube plates which hang from the top of the boiler frame. These early boilers had relatively low steam pressures and were therefore of assisted circulation design with pumps in the evaporator section. Two pumps of 100% capacity were generally installed to drive the water through the evaporator and so to ensure that the steam would leave the drum to go to the superheater and not flow back to the economiser. These are small-capacity pumps of which one runs continuously with the other on standby, and they have proven to be extremely reliable in operation. They also contribute to the rapid starting capability of these boilers since they are circulating a smaller volume of water than would be possible with a boiler of naturalcirculation design. As gas turbine outputs and operating temperatures increased, it became possible to capture more energy, first by preheating the feedwater and later by adding a full second-pressure stream of an economiser–evaporator and superheater to recover the maximum amount of the gas turbine exhaust energy entering the boiler. Gas entering the boiler at, say 500 °C, would emerge from the stack at about 110 °C. The steam cycle for Korneuburg B is of this type with the second pressure obtained by booster pumps which are supplied from the low-pressure drum. Condensate returns from the steam turbine to a deaerator which is heated by a pegging steam supply bled from the turbine. The low-pressure feed pump then sends the feedwater to an economiser and thence to the evaporator and superheater. The high-pressure flow is pumped from the low-pressure drum to a second economiser and thence to the high-pressure evaporator and superheater. Korneuburg B was commissioned in 1980 and at the time was the most efficient combined cycle to have been developed so far with a maximum output of 129 MW at a net efficiency of 46.6%. It continued in operation until 2003 when the gas turbine was refurbished, upgraded and returned to service in the autumn of 2004. Combined-cycle development in Europe initially followed two routes: firstly, the fully fired combined cycle, with a small gas turbine integrated into the steam cycle of a coal- or oil-fired steam set; secondly, the unfired combined cycle which was the forerunner of the system in use today. In the USA at this time the combined cycle was considered to be the use of a small gas turbine integrated with the steam cycle of a large power plant as a feedwater heater. The arrival of gas in western Europe had led first to the application of natural gas to the traditional applications of manufactured coal gas for cooking and space heating. Power generation would be a large competing market and initial applications were limited. Some of the new large gas turbines were applied to repowering and to district heating plants, notably in Vienna and Munich. In the fully fired combined cycle the gas turbine exhaust was fed to the burners of the fired boiler. The mass flow through the gas turbine had to match the combustion airflow into the burners. On the way to the burners the gas turbine exhaust passed through a series of heat exchangers which replaced some of the original feedwater heaters of the steam plant.
WPNL2204
Some early schemes
45
3.3 Drogenbos, Belgium: a repowering scheme dating from 1976 and still available as a standby unit on the Electrobel system.
The advantage of this was that the gas turbine would provide additional output both with its own generator and by the reduction of steam bled from the turbine for feedwater heating which gave a small increase in power to the steam turbine. In all, 15 plants of this type were built in Germany and Austria, between 1965 and 1978 and, some 10 years later, ten steam plants were similarly converted in The Netherlands. The advantage of these units was the high efficiency at between 43% and 45% which was a significant improvement compared with even large coalfired plant with high-pressure reheat steam cycles which could only reach 36% with coal. In Austria, by 1974, the first combined cycle at Korneuburg had been operating for 14 years and at an efficiency of 32.6% was no longer economic to operate as a base-load unit. A further application envisaged for the combined cycle was in repowering old steam turbines. The large gas turbines introduced around 1975 were able to support a steam turbine of 30–50 MW such as had been installed in Europe in the late 1940s. These turbines had low-steam conditions with no reheat and a typical efficiency of between 25% and 30%.The new gas turbines under development ran at sufficiently high temperatures that they could support the original steam cycle without the need for supplementary firing. Drogenbos power station in the southern suburbs of Brussels was such a plant (Fig. 3.3). It was built in 1947 with three 37 MW steam turbines which had originally been coal fired and had later been converted to burn oil. Also in Belgium, at that time, ACEC had formed an alliance with Westinghouse, principally in connection with the seven nuclear reactors which were then being built in Belgium, but Westinghouse also produced gas turbines and had developed the 90 MW Model W1101 which was aimed at countries operating on a 50 Hz power system. The first unit was installed at the Drogenbos station in Brussels. Worried
WPNL2204
46
Generating power at high efficiency
about the rising price of gas, Inter Brabant, the operator at Drogenbos, decided to convert the simple-cycle gas turbine to a combined cycle. CMI, of Seraing, near Liège, were given the order for the heat recovery boiler and the modification of the power station to connect the new boiler to the best of the steam turbines. The boiler was specifically designed to operate at peak times which would involve running for a few hours twice a day. For this reason a single pressure steam cycle was used which at 51 bar at 460 °C was the highest pressure then attempted for a combined cycle. The repowered plant went back into service in 1976. The output was 119 MW at an efficiency of 42%. Although it had slightly lower output than Korneuburg B, its lower efficiency was due to the use of a single-pressure heat recovery boiler to enhance flexibility of operation. In daily operation the gas turbine could run up to full load in 15 min with the steam turbine reaching full load after about 40 min. This is how it operated for most of its life with, on average, 156 starts/year, each time delivering full power within an hour of pushing the start button on the gas turbine. This is a pattern of operation which has carried forward to modern combinedcycle plants. With larger gas turbines and more complex steam cycles, it is still possible to operate in load-following mode with a daily start-up. It is still possible after an overnight shutdown to bring the combined cycle up to full load of nearly 400 MW in an hour. Several features were incorporated which have stood the test of time and can be seen in combined-cycle plants being built today. Firstly, there is no bypass stack to allow the gas turbine to operate independently of the steam turbine. The gas turbine and steam turbine are regarded as an integrated whole, Instead there is a steam dump straight to the condenser which is used during start up to receive steam as the boiler heats up, until the quality is suitable to be passed to the steam turbine. A second feature was the dry running capability. If, for example, the steam turbine generator developed a fault, the gas turbine could still be operated alone, exhausting through the boiler from which the water had been drained. This was not a problem with the low exhaust temperatures of the gas turbines then available but, as outputs and operating temperatures increased, fewer boilers could be so operated, because it would mean reducing the exhaust temperature of the gas turbine to about 480 °C. The Drogenbos plant was an important reference but the idea was slow to become popular in Europe. Again the combined cycle had to fit into the operating pattern of a state-run utility system operating in a heavily interconnected European network with a growing nuclear capacity that would be running in base load. It would be the district heating plants and a few large industrial combined heat and power schemes that would provide a small European gas turbine market in the years up to 1990. During this time there were few suitable steam turbines available for repowering and, although it was suggested at the time that it would be a natural application for the gas turbine, there were very few opportunities, but it was a difficult market in
WPNL2204
Some early schemes
47
Europe. Those countries with state-owned companies holding a monopoly in power generation, chiefly the UK, France and Italy, showed little interest in the technology. Those which had investor-owned or municipally owned generating companies, mainly Sweden, The Netherlands, Germany and Spain, were more receptive and installed some of the first gas-turbine-powered district heating and industrial combined heat and power schemes. The Republic of Ireland was one country where there were opportunities. It was an isolated network, politically disconnected from a larger network in the six counties of Northern Ireland, and with, in 1980, a maximum electricity demand of about 3500 MW. Until gas was discovered offshore County Wicklow in the mid1970s the only indigenous fuel was peat. Unlike the situation in the UK, there was no domestic gas market and so the only way to exploit this new resource was in power generation which would guarantee a large enough load to allow the supply infrastructure to be put in place. The Marina power station near Cork had two 30 MW steam turbines and had been completed in 1954. In 1979 it was decided to repower one of the steam turbines. Engineers from the Electricity Supply Board had seen Drogenbos, which by then had been in operation nearly 3 years, and awarded the contract for the boiler to CMI. The unit was similar to Drogenbos except that it had an additional preheater section above the economiser which heated the returning feedwater before passing it to the deaerator where it was further heated by pegging steam from the steam turbine before being pumped to the main economiser at the design pressure of 45 bar. The gas turbine in this case was the GE Frame 9B which was rated at 87 MW with an exhaust flow rate of 340 kg/s at 510 °C. The scheme was arranged so that either one of the steam turbines could be used. For this reason there is a separate dump condenser connected in parallel with the steam turbine condensers. Other features followed the Drogenbos arrangements. There was no bypass stack and the boiler was designed for dry running. In fact the gas turbine ran for 500 h on a dry boiler during commissioning. The repowered station went into operation in December 1979. While this was going on in Europe, Westinghouse was commissioning the third of their combined-cycle plants at the Putnam power station of Florida Power and Light, at East Palatka, Florida. The station had four of the W501B gas turbines, each rated at 70 MW and arranged in two blocks with two gas turbines and heat recovery boilers powering one steam turbine. The first block went into service in May 1976 and the second 4 months later in September. For the first 6 years it ran on liquid fuel, mainly residual oil, and was switched to gas firing in the summer of 1982. As in Europe, Putnam was operating in a network with large base-loaded steam plants and was operated as a mid merit plant. Until natural gas was introduced to the site, the plant ran for 2500 h/year with over 200 starts/year. Also in 1982, the Dublin North Wall station was repowered. The station had
WPNL2204
48
Generating power at high efficiency
been built originally as a peaking plant with three 15 MW oil-fired steam turbines, two of which had been installed in 1953, and the third in 1964. Repowering was the first application of the 120 MW uprated Frame 9E gas turbine, and North Wall is the only station arranged with one large gas turbine and heat recovery boiler supplying steam to three turbines. In this plant there was a low-pressure evaporator, the drum of which incorporated the deaerator. The pressure of the steam output was at 30 bar at 430 °C, matching that of the original boilers. The repowered station went back into operation in May 1983 and for the next 3 years this, and the Marina station at Cork, ran in base load until a 1200 MW coal-fired power plant was completed at Money Point, County Galway, in 1986. By this time in Europe there were four large gas turbines with operating experience in combined cycles, ranging from the Brown Boveri GT13 at 81 MW to the latest GE Frame 9E at 120 MW. In 1974, Siemens had introduced their Model V94.2 gas turbine to succeed the Model V93.2. Their first installations were in district heating plants in Vienna and Munich. The gas turbine was initially rated at 90 MW which was later increased to 105 MW and eventually to 150 MW. However, orders in Europe were few and far between and it was the growing economies of southeast Asia and Japan that would provide much of the market for the European and American manufacturers until 1990. Gas had been found in southeast Asia, and particularly the Erewan field in the Gulf of Thailand. Countries in the region were developing and there was experience of combined cycle with all the large gas turbines then available in Europe. Gas was piped west to the Malaysian peninsula where it came ashore near Paka, and north to the Thai terminal at Rayong about 150 km south of Bangkok. The first combined cycles were built in the region and came into operation in 1983. At Bang Pakong, about 80 km south of Bangkok, Siemens supplied two 440 MW blocks, each consisting of four of their Model V93.3 gas turbines, site rated at 70 MW, at 32 °C (Fig. 3.4). Four single-pressure heat recovery boilers fed a 160 MW steam turbine. At the time, the extent of gas reserves in the Gulf of Thailand were not fully known and the gas turbines of one block were set up for dual-fuel operation with oil as a back-up fuel, but apart from commissioning on oil the gas turbines have never burned it in commercial operation. In fact, 20 years later, both blocks were still running in base load and at least five large combined cycles and a number of smaller combined heat and power plants were taking fuel from the same source. In Malaysia, Alsthom, who were then a licensee and manufacturing associate of GE and had collaborated with them on the development of the Frame 9E, were awarded a turnkey contract for three 300 MW blocks each consisting of two Frame 9E gas turbines, which were site rated at 103 MW, and a 100 MW steam turbine. These were installed on the east coast of the peninsula at Paka. Much of the output was intended for a steel works being built along the coast to the south.
WPNL2204
Some early schemes
49
3.4 Bang Pakong, Thailand: the country’s first combined cycle which consists of two 440 MW blocks was completed in December 1993 and ran for 22 years. A decision to redevelop the site was taken in 2006.
Japan, Taiwan and later Korea were also installing their first combined cycles and importing LNG from Australia, Indonesia and Abu Dhabi. Japan had an innovative gas turbine industry founded on American licences and with both system frequencies in the country could develop gas turbines for both 50 and 60 Hz operations. Mitsubishi focused on the northern utilities in the 50 Hz network and launched their M701 gas turbine at 130 MW with a dry low-emission combustion system in 1983. Another country that had acquired a gas supply and discovered some of its own was Turkey. In the early 1980s gas was already being piped from Russia to western Europe with branches extending south through Romania and Bulgaria into Turkey. A small gas field was also discovered in Turkey’s European province at Hamitabad, some 100 km north of Istanbul. This site and another at Ambarli near Istanbul were the first combined-cycle sites in Turkey. At Hamitabad, the Turkish Electricity Authority in December 1984 awarded the then Brown Boveri AG, acting in consortium with Turkish civil contractors ENKA, a contract for two blocks each consisting of two of their Type 13D gas turbines and a 100 MW steam turbine (Fig. 3.5). A repeat order was awarded for two more blocks in July 1986. As shown in Fig. 3.5, many of the early combined cycles had bypass stacks between the gas turbine and the heat recovery boiler. In the case of Hamitabad this was to allow the gas turbines to be installed early and to run in simple cycle while the boilers and steam turbines were being erected. Alhough not strictly necessary, and completely absent from the single-shaft blocks which would follow at the end of the century, the bypass stacks are generally indicative of staged construction in a country with high rates of growth of electricity demand.
WPNL2204
50
Generating power at high efficiency
3.5 Hamitabad, Turkey: a plant which consists of four 300 MW blocks on a small gas field in the European province of Turkey and was the country’s first combined cycle completed in September 1989.
Many of the developed countries of Europe and North America had seen their rate of growth of electricity demand drop and continue at lower rates from the mid1970s onwards. The nuclear and coal-fired plants which had reduced the use of oil for power generation had also created large reserve plant margins. Growing concern for environmental issues meant that much retrofit work was carried out, particularly on the coal-fired stations to fit FGD systems and low NOx burners. These measures on the largest and newest coal-fired stations did not increase their output but ensured at least that these power plants could stay in operation under the new environmental rules. In the early 1990s, the combined-cycle market exploded in southeast Asia where, in the fast-growing economies of Thailand, Malaysia and Indonesia, rates of growth in electricity demand were of the order of 15%/year. In this situation a 300 MW combined-cycle block would be built by installing the two gas turbines to run in simple-cycle mode during which time 200 MW of gas turbine power would be available, and it would come into operation between 9 months and 1 year from the date of order. The gas turbines would then operate for up to 18 months in simple-cycle mode while the heat recovery boilers and steam turbine were erected. The stack would have a diverter valve in place so that all that had to be done to complete the combined cycle would be to shut down the gas turbine behind the closed damper while the duct connection to the boiler was installed, after which there would be a period to commission the steam turbine and to perform a reliability run of the whole block. The original stack and damper remain as a bypass.
WPNL2204
Some early schemes
51
As the market took off in southeast Asia, so the first steps were taken in the deregulation of electricity supply in Europe. Privatisation of the British electricity supply system which began in 1990 brought about the so-called ‘dash for gas’ in which several combined-cycle power stations were built, including some large industrial combined heat and power schemes. At the same time, all the small coalfired power stations were closed down so that, by 1995, there were no steam plants with units of less than 200 MW in operation in the UK. It was little more than 20 years since the first experimental projects had gone into service in Austria and Belgium and in that time gas turbine development had resulted in more efficient units and cleaner combustion with low emissions of carbon monoxide and NOx. At the same time that the industry had reorganised, it was the gas turbine suppliers who became the combined-cycle designers and builders. This was not surprising given that at the top end of the market the gas turbine builders also were the traditional suppliers of steam turbines, and in one case at least had a boiler division. The pattern of ordering at this time was that the contract would be between the generating company and the gas turbine supplier. It would define the power plant to be built in terms of output, siting conditions, emission standards and responsibility for procurement of balance of plant. Sometimes the gas turbine supplier would procure the heat recovery boiler and at other times the customer would procure it. The first independent combined-cycle plant in the UK was installed in northwest England at Roosecote, near Barrow-in-Furness in October 1991. A group of four engineers of the former CEGB had formed a company to buy a 120 MW coal-fired power plant, which had been closed in 1986, and to redevelop it. The four 30 MW generating sets were removed, the boiler house and stacks were demolished but the cooling system of the original plant was refurbished and three small ancillary buildings were retained, housing the rebuilt control room, offices and workshops. The 225 MW combined cycle was installed in the former turbine hall. It consists of a single Type GT13E gas turbine with water injection for NOx control and a 63 MW steam turbine mounted on either side of a centrally mounted heat recovery boiler. By 1990, combined cycles were generally based on gas turbines of 120–150 MW in the 50 Hz market with up to three gas turbines and one steam turbine. There would be a two-pressure steam cycle with which there would be either a lowprofile wet mechanical-draught-cooling system or an air condenser. The determining factors as to what form the steam cycle would take are the exhaust energy of the gas turbine and the customer’s intended use for the station. If it were intended for a base-load operation, then a two-pressure steam cycle would be used on the assumption that the plant would run continuously for long periods. For a plant that was intended for load-following duty, a single-pressure steam cycle might be used. With only one drum and one operating pressure level the
WPNL2204
52
Generating power at high efficiency
3.6 Peterborough, UK: a typical 350 MW combined cycle for northern Europe using E-class gas turbines, which now runs to service the peak demands with over 200 starts/year.
boiler would have a lower thermal inertia and so would heat up more quickly. If the gas turbine could be synchronised and loaded within 15 min, it was clearly in the operator’s interest to have full output within half an hour if the plant was to be run for, say, 4 h during the morning peak, shut down for 5 h, and then started up again to run for another 4 h over the evening peak. This was the typical operating pattern assumed in Europe for the first combined-cycle plants which were installed in utility systems with large coal-fired and nuclear sets providing the base load. It soon became very clear that the repowering of old steam plants which had been among the first applications would not be a lucrative market for the gas turbine industry. Steam power plants with suitable sets to repower were few in number and, in any case, the largest gas turbines available before 1990 were around 100–120 MW capacity with exhaust temperatures of 520 °C or less. Even if a power station had been available with a suitable steam turbine the gas turbine would have to be chosen and the heat recovery boiler would have to be optimised to the existing steam conditions. It was far better to build a brand new combined cycle with a gas turbine, heat recovery boiler and steam turbine optimised to the purpose. Until 1995 the combined cycle was always a multishaft concept: two, three or four gas turbines each with its heat recovery boiler feeding common steam ranges supplying a single steam turbine. A typical arrangement for a combined cycle of the time, based on a 120 MW gas turbine, is shown in Fig. 3.6 which represents the steam cycle at Centrica’s Peterborough power station about 150 km north of London.
WPNL2204
Some early schemes
53
Completed in November 1993, the station was for the first 7 years operated as a base-load station by Eastern Electricity. It is now one of seven combined cycles operated by Centrica. Under new electricity trading arrangements introduced in April 2001 the station is now operated on a daily load cycle to supply Centrica’s mainly domestic customer base in eastern England. Peak time is in the evening as consumers return home from work and a typical operation is to start up at 5.00 pm, to run through to 11.00 pm and then to shut down. In winter time the plant may run through to the following morning to charge up night storage heaters. This pattern of operation emphasises the operating flexibility of the combined cycle over its lifetime, since Peterborough started life in 1993 as a base-load power station. Flexibility is becoming increasingly important as more gas-fired power plants are added to networks. The steam cycle for Peterborough is a typical two-pressure system for a site in northern Europe. The design ambient temperature was 10 °C and the temperature on site ranges over the year from –5 to +25 °C. The station is also set up for dualfuel operation with an interruptible gas tariff which allows for gas to be shut off for up to 20 days a year, during which time the gas turbines burn a light fuel oil. Almost all combined cycles built in Europe, and by European companies in Asia and the Middle East at this time, had vertically configured heat recovery boilers. This is not surprising given the circumstances in which the first combined-cycle projects were developed. They were built on congested urban sites for district heating plants, or on existing power station sites where a vertical arrangement would save space. By the time that the combined-cycle market started to open up in Europe and the Far East at the end of the 1980s these early projects had all been operating for between 5 and 10 years and had demonstrated their operational flexibility and reliability. However, there was increasing competition from American developers who had fixed ideas as to the design of the heat recovery boiler. They had used horizontal natural-circulation boilers on their PURPA combined heat and power schemes with gas turbines of which the largest was rated at 105 MW and therefore they could be used on the combined cycles behind the larger 50 Hz gas turbines. The first horizontal boilers appeared in England in 1991 but, 4 years earlier, a vertical natural-circulation boiler had been developed by Austrian Energy and Environment (AEE) and installed behind a 150 MW gas turbine at Leopoldau district heating plant in Vienna, and a number were also installed on combined cycles in Indonesia and Singapore. The argument against the vertical boiler had always been that it was not natural circulation, and that being vertical it was more difficult to erect and needed long expansion loops in the downcomers and risers between the evaporators and the circulation pumps all of which would add to the cost. Vertical natural-circulation designs did not really come into favour until the arrival of the larger F-class gas turbines wich were capable of supporting a threepressure steam cycle. A typical steam cycle for the early F-class would have
WPNL2204
54
Generating power at high efficiency
100 bar for the high pressure, 30 bar for the intermediate pressure and 5 bar for the low pressure. The intermediate- and high-pressure economisers were interspersed through the stack of heat exchangers, which in turn meant that the evaporators were lower in the stack. The drums mounted on top of the boiler frame would now have a large static head for each evaporator which would replace the circulating pumps. Most of the early European combined cycles used vertical assisted circulation boilers that were designed for dual-fuel operation. After 1995, as gas supplies seemed more assured, more plants were built for gas firing only with consequently lower capital cost. Peterborough is one of several combined cycles in the UK which have been supplied with an air condenser. The station is situated on the edge of the city with open farmland on two sides. There is no convenient water body for cooling so that an air condenser with 16 cells is used. The combined cycle, of course, has a much smaller cooling load than a steam plant of the same capacity. In this example the steam turbine is only 120 MW as it contributes only about one third of the total output Air condensers, of course, add to the auxiliary load of the station and were previously used mainly in desert areas, but they have advantages in Europe and North America where either there is no available source of cooling water or difficulties in obtaining water extraction rights for cooling. One advantage over wet cooling systems is that there is no low-level vapour plume, which in certain weather conditions could give rise to fog on roads passing the station site and create a traffic hazard. A variant of the wet mechanical-draught-cooling tower is the hybrid unit which has an air-cooled dry section immediately below the fan that initially cools the water and passes it to the wet section below; in most weather conditions, this is cool enough not to cause a vapour plume. Several of these units have been installed at plants on urban sites and beside motorway bridges. Combined cycles in Finland, Russia and other countries with extremely low winter temperatures have the additional problem of intake icing to contend with. In very cold climates there could be a separate preheater stage in the boiler as part of a closed loop to the gas turbine intake which uses ethylene glycol as the working fluid as is done at many sites in Finland. In a less severe climate this could be a separate water loop, perhaps fed by a bleed from the steam turbine. Some plants may have district heating condensers fed from the steam turbine with just a small condensing tail at the peak heating time. The amount of extraction will vary with the time of year so that in summer time there could be no heat load and the plant would be running as a pure combined cycle with maximum electrical output. In some countries, notably Indonesia, combined cycles installed on coastal sites will have a steam turbine with a bleed going off to a multistage flash distillation unit so that seawater can be distilled to provide demineralized water for boiler
WPNL2204
Some early schemes
55
make-up. Where this has been done, it is with combined cycles with 130 MW gas turbines in 3+3+1 configuration, giving a steam turbine of nearly 200 MW capacity. As more experience of gas turbine operation was gained, it could be seen that not only did the output vary with ambient temperature but also there would be a degradation of output with time due to compressor fouling. The best filters will still pass fine dust and aerosols which can deposit on the first compressor blades and cause a sharp drop in output over a few days. Online compressor washing came into the market in 1991. For some time, gas turbines had been equipped for offline washing, and among operators it had become a matter of principle that after any outage a compressor wash would be performed before the gas turbine was restarted. There are many different causes of fouling. The extent to which gas turbine output degrades with time depends on where it is located and the quality of the intake filters and their maintenance. On an urban site beside a busy road junction leading to an industrial estate, a combined heat and power plant serving it could see a complex cocktail of traffic fumes and process emissions which could cause the loss of 2 MW output a week from a 100 MW gas turbine. In a rural site an ostensibly clean environment could carry pollen and fine dust particles at different times of year, and on coastal sites there is the problem of salt spray. Online washing does not completely eliminate fouling but regular washing can greatly reduce the rate of fouling. A daily wash can recover, say, 75% of the power loss since the last online wash and the same each time so that the period is extended between offline washes. The online wash system is a series of nozzles strategically placed in the intake duct such that the greatest wetting of the first-stage blades can be achieved. The nozzles are supplied from a manifold fed from a mixing skid which prepares the detergent and solvent in the correct mixture. Many companies can supply the detergents but only a few provide the complete kit of nozzles and mixing skids. A problem with online washing is the pressure at which the cleaner is delivered to the compressor intake. Too high a pressure, and therefore flow rate, and a high frequency of washing can lead to blade erosion particularly if a high rate of intake air flow forces the cleaning fluid to concentrate at the blade root. Consequently low-pressure systems and nozzle designs have been developed to provide complete wetting of even the largest gas turbines. Until 1994 there was no change in the general concept of what a combined cycle should be. Such increases in power and efficiency as had been made were the result of improvements to the gas turbines. The best efficiency with the 150 MW gas turbines was about 52.5% Larger gas turbines operating at higher temperatures were under development and there was talk of higher-pressure steam cycles with efficiency approaching 60%. However, the lessons of these early schemes are important for the future. The design life of these early plants was 25 years and this was confirmed with
WPNL2204
56
Generating power at high efficiency
Korneuburg B when it broke down in 2003. The thermal block was judged to be at the end of its life but Alstom had a new block in storage for a GT13D which had never been built and this replaced the damaged unit. A new combustor incorporating the low-emissions EV burners was also installed together with the turbine upgrade package and the unit went back into service in late 2004 with about 10% increase in power over that of the original unit. What is possible now is to apply the technology of the latest F-class gas turbines in compressor and turbine blading and turbine blade cooling to give a small gain in performance without losing the basic flexibility of the original combined cycle. In load-following mode the simpler steam cycles at lower pressures were able to run up much faster than the large steam plants on the network. In a typical operation in a developed industrial county the power plant could start with a 7.00 am run for, say, 3 h and then shut down until 4.00 pm to restart for the evening peak. No fuel is being burned to keep the plant warm during the shutdown period, although the steam turbine would still be warm and would be rotating slowly on its turning gear. Up to about 1994 all combined cycles had been ordered with long-term power sales agreements. A merchant plant has no long-term contract but bids to supply every day on the basis of its generating cost and availability. Contracts could run for several weeks to cover, say, a refuelling and maintenance outage at a nuclear plant or simply to provide mid-load power on weekdays. Another contract could be to an industrial customer to supply power for a particular period of production. These are all situations demanding flexibility of operation. The challenge has been to provide it with combined cycles with the larger F-class gas turbines which because of their higher power density and higher operating temperatures have been designed mainly for base-load operation with horizontal natural-circulation boilers and high steam pressures, shutting down once or twice a year according to the demands of maintenance. However, what happens when these combined cycles are overtaken in turn by even more powerful gas turbines in future? This makes it all the more inportant that future combined cycles be designed for greater flexibility.
WPNL2204
4 Gas turbine developments
Of the three gas turbines that were developed at the end of the 1930s, two were designed as aircraft engines, and during the Second World War this line of development continued up to 1945. Gas-turbine-powered aircraft entered service with the British Royal Air Force as the war came to an end, and for a long time afterwards the public perception of the gas turbine was as the jet engine of an aircraft. After the war, gas turbine technology was made available to the USA and other countries, and it was principally those countries with a significant aircraft industry who continued the development of the gas turbine as an aero engine. Some further applications in transport were studied. In England, the Rover Car Company experimented with a gas-turbine-powered car and, in Switzerland, Brown Boveri designed a gas-turbine-powered locomotive. However, neither went into commercial production. As understanding of the technology grew, the first industrial gas turbines went into production. Ruston, at Lincoln, some 250 km north of London, began development in 1946 of a small gas turbine which, in 1949, was announced as the Model TA1750. This unit was primarily intended as a mechanical driver for the oil and gas industry. Its initial rating was 970 kW with a design speed of 11 800 rev/min and the turbine inlet temperature was 726 °C. The first unit went into service in 1953 and, in the next 30 years, 820 were sold around the world. By then the output had been increased to 1390 kW with the turbine inlet temperature at 825 °C. In the USA, GE had spearheaded gas turbine development with the Frame 3 which was introduced as a mechanical drive unit rated initially at 3730 kW at 7100 rev/min and had a thermal efficiency of 26.4%. It was a two-shaft design for mechanical drive application on pipelines, on production platforms and in process industries. A few single-shaft units were supplied for power generation, and some found their way into the early American combined-cycle projects which were based on large steam plants with small gas turbines incorporated into the steam cycle as a feedwater heater. Sweden, which had remained neutral during the war, had an aircraft industry and 57 WPNL2204
58
Generating power at high efficiency
in 1952 had started development of a gas turbine engine for the Swedish Air Force. This engine was successfully flight tested but, when it came to choosing an engine for a new generation of fighter aircraft, the Swedish Air Force opted for the RollsRoyce Avon. The developers, Stal Laval Turbin AB, located at Finspong, some 150 km south of Stockholm, decided to adapt their design for power generation and industrial applications. The modified engine was launched in 1957 as the GT35 and is still in production 50 years later. The majority of applications have been to power plants and industrial combined heat and power schemes, but some have been applied to mechanical drive and several have been installed on North Sea oil and gas platforms. It has been progressively upgraded over the years to its present rating of 17 MW, and the can–annular combustor system has been fitted with the ABBdesigned low-emissions EV burners since 1995. Now that the Finspong works is part of Siemens Industrial Turbomachinery, this gas turbine has been renamed the SGT500. By 1960, the first long-range aircraft with pure gas turbine engines were coming into service with the airlines: the long-range Mk 4 Comet with four Rolls-Royce Avon engines, and the short-range French-built Caravelle with two Avon engines, in Europe, and the Boeing 707 and Douglas DC8 in the USA each with four Pratt & Whitney JT4 engines, on trans-Atlantic and transcontinental services. These aero engines were of a size at their initial ratings where they could be adapted for use on the ground at constant output as a compressor or generator driver. Rolls-Royce had also investigated using the Avon as an industrial engine running on oil or natural gas. Then in 1963 a power system failure in the northeastern USA, extending from New York city to Toronto, in Canada, led to the start of aero engine application to power generation. An aircraft engine was a compact design of low inertia and quick starting. Therefore, it was argued, if there was another failure of the power system, surely a gas turbine generating set could run up to full power in no more time than if it were on an aircraft. The following year Boston Edison ordered four gas turbine generator sets from the UK. Each consisted of a Rolls-Royce Avon engine and associated power turbine linked to the generator through a synchronous self-shifting clutch. Manufactured by SSS Gears Ltd at Sunbury on Thames, some 40 km southwest of London, the clutch separated the gas turbine from the generator so that it could operate as a synchronous compensator at times of low power demand over long transmission lines. Besides these dual-purpose units a number of gas turbine peaking sets were installed consisting of two aero-derivative engines driving at either end of a common generator. Three such stations were installed in New Zealand in 1982 with the arrival of Maui Gas in the North Island (Fig. 4.1). At that time hydro stations on the South Island supplied the North through an HVDC link. Two of the plants were installed in the south of the North Island to cover periods of low rainfall or power station or transmission line outages in the South Island.
WPNL2204
Gas turbine developments
59
4.1 Whiranaki, New Zealand: a plant with four 30 MW JT4 twin packs installed in 1982 to provide back-up for the HVDC link transmitting power from the South Island.
By 1970, the arrival of the wide-bodied aircraft with large turbofan engines gave further stimulus to the market for aero-derivative engines in power generation. The core engine without the fan section was used and, as with the earlier aero engine designs, the combustion system was modified to burn gas, and a bespoke free power turbine in the exhaust duct was the basis of a larger and more efficient generator package of between 25 and 33 MW depending on the gas turbine type. The main engine types were the Rolls-Royce RB211 from the Boeing 747 and Lockheed L1011, and the GE CF6 series from the DC10 tri-jet and the first Airbus models, from which were derived the LM2500 (Fig. 4.2) at 25 MW and the LM 3000 at 33 MW. These engines competed directly with the GE Frame 5 industrial gas turbine, which had also been upgraded in 1970 in a single-shaft version for power generation applications. The large markets for aero-derivative engines have been in the oil and gas industry. Their compactness was an advantage on an offshore platform and they have been installed on oil and gas production platforms all over the world, both to drive compressors and pumps and to provide power generation. The large aeroderivatives, notably the GE LM 6000 and Rolls-Royce RB211 and Trent, are now the main compressor drivers on the world’s gas pipelines. These types, on account of their high efficiency, have also found application in generating sets and also a growing number of industrial combined heat and power schemes. Of the smaller aero gas turbines, only the Allison Model 501 at 3.5 MW has been widely used for industrial combined heat and power schemes in the USA, and also through its licensed packagers, principally Centrax Ltd at Newton Abbot in southwest England, for Europe and the Middle East.
WPNL2204
60
Generating power at high efficiency
4.2 Air New Zealand, which is one of several airlines that maintain aero-derivative gas turbines for industrial customers. Shown here in the Auckland base is an LM2500 for a Pacific Island utility.
Few industries installing a combined heat and power scheme for the first time had experience of gas turbine operations and the attraction of an aero-derivative gas turbine was due to not only its flexibility of operation, because of its rapid starting capability, but also the presence of a large body of experience in the airline industry who operate and maintain these gas turbines. Many airline operators opened their maintenance shops to industrial and utility customers in their countries to provide aero-derivative gas turbine maintenance services. Outside the aero engine scene, gas turbine development did not really improve until the late 1970s when large gas turbines capable of operating at synchronous speed became available. The peaking and emergency sets using aero engines had shown that they could be adapted and applied to power generation which, at constant output and ambient conditions on the ground, was vastly different from the normal operating environment for which the engines had originally been designed. Some of the early heavy-frame machines had been applied to power generation but, in comparison with the aero engines, were low-temperature machines, running at high speed and therefore requiring a gearbox to drive a generator at synchronous speed. The challenge was to produce a gas turbine running at 3600 rev/min for 60 Hz and at 3000 rev/min for 50 Hz generators. In 1960, the largest gas turbines were rated 25 MW; by 1970 the largest units in Europe were 50 MW, but larger gas turbines were under development. In fact, the first gas turbines operating at the 3600 rev/min had already appeared in the North
WPNL2204
Gas turbine developments
61
American market and it would only be a matter of time before the equivalent 50 Hz models would be launched in the European market. In fact, the first of the so-called E-class could be considered to be the GE Frame 7 which was announced in 1968 at an initial rating of 55 MW and by 1971 had been uprated to 80 MW at 32.1% efficiency as the Frame 7E. This gas turbine is still in production as the Frame 7EA at an ISO rating of 85.1 MW, with an exhaust temperature of 536 °C. It was the first GE gas turbine to be designed to drive the generator directly at synchronous speed and it is this property and exhaust temperatures of 500 °C or more that really define the E-class rather than absolute power. Brown Boveri in 1968 had introduced the first of three gas turbines of a new compact design characterized by a single shaft driving from the cold end, which had a straight-through exhaust duct to the heat recovery boiler, with a single silo combustor mounted on top of the casing and housing a single burner. This was the Type 11, rated at 49.5 MW and running at 3600 rev/min. In the following year, Westinghouse introduced the W501A at 66 MW, which in 1972 was scaled up by Fiat to produce the TG50 as a 90 MW unit running at 3000 rev/min. By this time, Westinghouse had uprated their 501A to the W501D at 107 MW and 34% efficiency. Brown Boveri introduced their large 50 Hz machine in 1973 as the Type 13 initially rated at 60.7 MW but, before this in 1969, they had introduced the Type 9 at 35.4 MW and operating at 4500 rev/min and driving the generator through a gearbox for either system frequency. All these large gas turbines were able to support a combined cycle without supplementary firing, but there was growing interest in Europe and North America in another market that was starting to appear: large industries, such as pulp and paper mills, and petrochemical plants, with large process steam loads were looking to install gas turbine combined heat and power units as production expanded and a gas turbine and heat recovery boiler would meet their process steam requirements and some of if not all their electricity demand. Few industries would require upwards of 60 MW of power and there were few opportunities to export surplus power at a fair market price. So there was a definite need for a smaller gas turbine to perform this duty. GE had in 1970 announced the Frame 5P specifically for power generation applications. It was a single-shaft design with a 17-stage compressor and an inlet guide vane. It ran at 5100 rev/min, and so was supplied with a gearbox for either 50 or 60 Hz operation. The Frame 5P was offered through GE and their business associates and, by 1982, more than 2000 had been sold and achieved over 40 million cumulative operating hours. Brown Boveri’s Type 9 was also aimed at this market and a number were sold to district heating plants. Siemens also had a 50 MW gas turbine in the Model V93.2 and were preparing to replace it with a larger unit, Model V94.0, which was announced at an initial rating of 90 MW in 1974. The period from 1968 to about 1980 was one of frantic development in the gas
WPNL2204
62
Generating power at high efficiency
turbine industry. Effectively there emerged four basic designs of gas turbine for the electric power market representing the technology of GE, Westinghouse, Brown Boveri and Siemens. 60 Hz machines had been scaled up by European and Japanese licensees for the 50 Hz market, and there were at least ten companies around the world that could supply one of these large gas turbines for a power project or industrial combined heat and power system. Development was given additional impetus by the Middle East war and the resulting oil crisis in the autumn of 1973. While combined cycle held out the prospect of higher efficiency of power generation, and natural gas rarely contained any sulphur at all, the reduction in particular of NOx and carbon monoxide was to become an issue for the gas turbine manufacturers. The basic principle of the gas turbine is that air is compressed and then heated by burning fuel. The hot gas then passes through a turbine which drives the compressor and also the driven unit, in this case a generator. To increase the output of the gas turbine more air must be passed through it and heated to a higher temperature. High-temperature materials from the aero engine technology and manufacturing techniques were developed to produce improved air cooling passages through turbine blades and vanes. As temperatures increased so the tendency of nitrogen in the combustion air to oxidise above 800 °C leads to a visible brown discolouration of the exhaust gases due to the presence of nitrogen dioxide. Reactions to the 1973 oil crisis varied from country to country around the world. The industrial nations of Europe, North America and Japan decided to take oil out of power generation. At the time the alternatives were either nuclear power, such hydropower as could be economically developed, or other fossil fuels, which meant either coal or natural gas. Coal was known to be in abundant supply in many parts of the world but worries about its environmental impact were beginning to surface in North America and Europe. Natural gas was associated with oil and much of it was still being flared off at well heads in the Middle East and elsewhere as a useless by-product. In Europe, natural gas had been discovered near Groningen in the northeast of The Netherlands and in 1964 in the southern North Sea offshore Great Yarmouth. Gas fields were also being discovered in other parts of the world. Important discoveries were made on the North West Shelf, about 100 km off Dampier, Western Australia, in the Bass Strait, between the Australian mainland and Tasmania, and in the Cooper Basin in the middle of the continent. In time, these discoveries would lay the foundations for a growing trade in LNG to supply in particular Japan, South Korea and Taiwan. Also, the mid-1970s saw the emergence of a new social phenomenon: the rise of organised protest against damage to the environment, and in particular gaseous emissions from cars and power plants. Acid rain was a direct consequence of sulphur oxides released in the combustion of coal and oil and carried on the prevailing wind from tall power station stacks. This led directly to the development
WPNL2204
Gas turbine developments
63
of FGD systems which are now standard equipment on all large modern coal-fired power plants. Natural gas was held to be a clean fuel. It was delivered by pipeline at a high pressure. Unlike coal there was no solid residue to be disposed of, and no energyintensive preparation before it could be used, as was the case with fuel oils and uranium. In 1973 the largest available gas turbines were about 100 MW and the first large gas turbine applications to industry were starting to appear in the Middle East with the power plants for the aluminium smelters in Bahrain and later in Dubai, and a large desalination plant at Ras Abu Fontas, in Qatar. As soon as a market appeared, there was an incentive to develop larger gas turbines and, as these started to be deployed, so the exploration and development of new gas fields gathered momentum. The American manufacturers dominated the early market through promotion of their technology to companies that were their licensees for other energy technologies, particularly nuclear reactors and steam turbines. Among the aero engine companies, neither GE nor Rolls-Royce packaged their gas turbines for mechanical drive applications, preferring instead to leave this job to the compressor manufacturers. Rolls-Royce did package some gas turbines as generating sets at the end of the 1960s but have since taken over the American compressor company Cooper as Cooper–Rolls for compressors and generator packages and more than 30 years later licensed the Swiss company Turbomach to package the RB211 for generating sets and industrial combined heat and power schemes in Europe. Similarly GE placed generator packages with Stewart and Stevenson, in Houston, whom they have since taken over, and their compressor packager is Dresser Rand. GE at this time had all its heavy-frame gas turbine production lines located at Schenectady, in upper New York State. Initially all its industrial gas turbines were manufactured there and these would require gearboxes to be fitted to achieve the 50 Hz synchronous speed. Their largest gas turbine model, Frame 7E, ran at 3600 rev/min which is one of the two commonest 60 Hz synchronous speeds. When, however, it was decided to build the Frame 9 as the equivalent model for 50 Hz networks, the development was carried out jointly with Alstom, at their Belfort factory in eastern France. A factory was set up in the neighbouring town of Bourogne to manufacture rotors for the new gas turbine. The first of the new generation of heavy-frame gas turbines for power generation were launched in Europe, between 1970 and 1975. Brown Boveri, as the combined-cycle pioneers at Korneuburg, were first with the Type 13. This was followed by the first GE Frame 9, which was installed by EdF as a peaking plant on a site near Valenciennes, in northern France. Siemens launched their Model V94.0 with the first installations at district heating stations in Vienna Leopoldau and south Munich. Westinghouse installed their W1101 initially as a simple-cycle unit at Drogenbos power station in the southern suburbs of Brussels in 1975. This gas turbine was one
WPNL2204
64
Generating power at high efficiency
of three rated at about 92 MW which were scaled up from the original W501 60 Hz model. Although it was the only one built, the equivalent Mitsubishi and Fiat designs, as the MW701 and TG50 respectively, continued in production and have sold well in Europe, the Middle East and Asia, reaching a final rating of 133 MW. For these new gas turbines there were two design concepts: the American system as presented by GE and Westinghouse, which is reminiscent of the early aero engines with the airflow from the compressor divided into a ring of combustion cans and thence through transition ducts linking them back to the turbine inlet; the so-called can–annular system which has continued to the present day. The two American designs were similar, the only difference being that the Westinghouse gas turbines coupled the driven unit at the cold end of the machine whereas, until their first F-class gas turbines appeared, in 1988 all GE gas turbines drove from the hot end so that the exhaust had to be diverted upwards or to the side to clear the driven unit. The two European manufacturers were frequently accused of designing their gas turbines like steam turbines, and the early models were indeed complex multicylinder assemblies with large free-standing combustion chambers. By 1970 this had given way to the compact structure reminiscent of the aero engine, but with one important difference. The combustion chambers were retained as outboard silos with one unit on the top of the casing for the Brown Boveri models and one at each side on the Siemens design. There were three other features of the European designs which were significant to the future market. The machines all had a cold-end drive, with the generator coupled to the intake end of the gas turbine. This allowed an uninterrupted straightthrough path for the exhaust gases to a heat recovery boiler, which would incur fewer losses. In a single-shaft combined-cycle arrangement this also enables the steam turbine to be connected at the other end of the generator and separated from it by a synchronous self-shifting clutch. The European rotor construction was definitely a follow-on from steam turbine practice. Brown Boveri had a solid forged rotor, which was machined to receive the channels into which the blades were placed. Siemens used individual discs which were machined with the Hirth gear on both faces of the disc so that adjacent discs were solidly interlocked by the gear surfaces. A large central tie bolt completed the assembly. The American designs following aero engine practice used discs with radial retaining keys and secured by a ring of tie bolts. The starting method of the European gas turbines was also different. Instead of a diesel or electric starter motor and a torque converter, both companies used the static frequency converter. This is a solid-state electronic device which works on the generator by pulsing each phase winding of the stator in turn, causing the generator to rotate and accelerate from rest as though it were an electric motor. As soon as the gas turbine has been fired up and is in stable operation the system switches off, the excitation is returned to its normal operation mode and the generator starts to load as the gas turbine reaches synchronous speed.
WPNL2204
Gas turbine developments
65
The system is elegantly simple with a low maintenance burden, and turbines so equipped have shown superior start reliability in service. The only moving part is the ventilation fan of the cabinet housing the electronic racks. On a multishaft combined cycle with two or three gas turbines, one electronic starter might be shared between all gas turbines but, for a station with two or more single-shaft blocks, each would have its own starter system. Although it would be nearly 30 years before the arrival of the single-shaft combined cycle on the scene, the electronic starting system could have been made for it and this is now the universal starting arrangement for all the large F-class gas turbines. By 1980, the four gas turbine models had been defined that, in their 50 and 60 Hz versions, would be the basis of the designs that followed. Very quickly after introduction these large gas turbines were produced in upgraded versions. By 1983, Brown Boveri had upgraded the GT13D from its initial rating of 60.7 MW to 89 MW with a turbine inlet temperature of 990 °C. In 1984 they introduced the GT13E rated at 149 MW with an efficiency of 33.7% and exhaust mass flow of 506 kg/s at 525 °C. The GE Frame 9B, introduced in 1975 at 85 MW, had by 1983 become the Frame 9E at 106.7 MW, which by the end of the decade would be further increased to 123.4 MW. Siemens who had introduced their Model V94 at 90 MW had in two steps raised the output to 125 MW and by 1990 had raised it further to 150 MW. Of the four major manufacturers, Siemens did not have a gas turbine for the 60 Hz market. The Model V84.2 was not launched until 1984 as a scaled derivative of the existing 50 Hz Model V94.2, with an initial base-load rating of 82 MW on natural gas, and an exhaust temperature of 512 °C. During the 1980s, the main developments were in the design of low-emissions combustion systems (Fig. 4.3 and Fig. 4.4). At the end of the 1970s an American standard for NOx emission was defined at 75 vppm at 15% oxygen. It was not a particularly severe standard and gas turbines that could not meet it could use water or steam injection to achieve it. However, this has disadvantages because, although there is a power gain from the additional mass flow of the water or steam, it is achieved at a lower efficiency as the object of the injection is to reduce NOx by diluting the flame, and this reduces the temperature at the turbine inlet. The first dry low-NOx combustion system was developed in Japan by Mitsubishi. It was applied to three M701 gas turbines, forming a combined-cycle extension of Tohoku Electric’s Higashi Niigata power station and went into service at the end of 1983. As a prototype system it produced NOx levels of about 55 vppm, which was a good reduction from the 75 ppm standard and would be decreased by further development. Low-NOx combustion is a two-stage process. In the first stage, known as the lean premix stage, only enough combustion air is used to ensure total combustion of the fuel mixed with it. The rest of the fuel is added in a second stage with the rest of the
WPNL2204
66
Generating power at high efficiency Gas (pilot)
Air
NOx water Cylindrical burner outlet
Gas (premix)
Swirlers
Oil return Oil (diffusion, pilot for premix)
Oil (premix) Gas (diffusion)
4.3 The Siemens low-emissions burner developed for the E-class gas turbines with silo combusters, and later for the F-class machines with annular combustors. (Courtesy of Siemens.)
Dilution air Combustion air
Spray evaporation
Liquid fuel
Ignition
Fuel gas
Vortex breakdown
Fuel gas
Swirl nozzle to atomize
Flame front
4.4 The EV burner introduced on the GT13E2, which is now used on all Alstom gas turbines. A modified version is used for the second combustors of the GT24 and GT26. (Diagram courtesy of Alstom.)
combustion air that dilutes the flame temperature to a level which can be withstood by the materials of the hot-gas path. The combustor also has a high-temperature valve on each can which reduces the airflow to the premix section as the load decreases so as to retain the same fuel–air mixture and so maintain a reduced NOx level down to about 25% load. Without this valve the low-NOx condition is met at full load and is sustained down to about 50% load, and the NOx level would then start to increase. At the relatively low firing temperatures of around 1000 °C of these early gas
WPNL2204
Gas turbine developments
67
turbines, it was fairly easy to obtain low NOx readings and both Siemens and Brown Boveri with their large silo combustors reported single figures of NOx in commercial installations. The Brown Boveri design used an asymmetric cone with a slot down the side. Gas was introduced through holes in the edge of the slot and mixed with the air entering through the slot in a concentrated vortex. As soon as the vortex leaves the cone, it breaks down in free space to create a lean combustion flame. A particular feature of this combustor is that, because the flame is not attached to it, the burner surfaces remain very clean. The EV burner has been applied to every one of the company’s gas turbines and has carried over to all of their current models. In the 1980s, there was a major development in low-emissions combustors across the industry with every manufacturer producing a dry low-emissions combustor that could be fitted in place of the original design. By the end of the decade there was effectively agreement by all on an NOx standard that could be guaranteed in a contract. A gas turbine would guarantee NOx at 25 vppm on gas and 42 vppm on liquid fuel. At the time the natural gas figure could be met dry, but with oil firing was only attainable with water or steam injection. In setting a common standard it was felt that this would not complicate matters for the industry if a system was developed which could achieve even lower emissions. The fear was that it might inspire some Green-tinged centre-left government, particularly in Europe, to bring in legislation to reduce emissions still further to levels that would cause industry problems and focus development in a different direction. In fact, for the 250 MW class gas turbines today, contracts still specify upper limits for NOx at 25 vppm on gas and 42 vppm on oil with water injection, but in practice these gas turbines can all achieve less than 15 vppm on gas, and some claim even single-figure values Only in the USA have emission levels been driven down further but, as measured at the top of the stack, rather than at the gas turbine exhaust flange. In New England the value is 2 vppm leaving the stack, which means that, to meet this, every heat recovery boiler is fitted with a catalyst system that, since it operates best at about 300 °C, is placed in the gas path upstream of the low-pressure superheater. The reaction is between ammonia and NOx to produce nitrogen and water. This standard for low-emissions combustion was, for many years, directed to the gas turbine users in power generation and industrial combined heat and power schemes. In countries with strict environmental policies, users were supplied with the low emission combustor. Elsewhere, if national emission standards were not yet in force, it was a matter of customer preference. However, there was the concern that a further increase in firing temperature in future more powerful gas turbines would mean that they might not be able to attain the low NOx levels achieved on the current generation of machines. For all the manufacturers it meant developing an improved cooling system so that more air could be used for combustion. For the European designs, with their outboard silo combustors, the answer was to replace the silos with an annular
WPNL2204
68
Generating power at high efficiency
combustion system. This would eliminate the large hot metal mass which diverted the airflows from the compressor to the combustor and back to the turbine stages. In the new arrangement there would be a short annular passage across which the burners faced the power turbine inlet guide vanes. There were no transition ducts but the annulus was lined with heat-resistant tiles. Access to the annulus was possible for borescope inspections of the turbine inlet stages and the individual burners could be withdrawn from outside for inspection and repair of individual units. The dry low-emissions combustor was standard on each unit. If it was a dual-fuel machine, a special mixing skid was installed. This created an oil–water emulsion that could be fed straight to the burner and so removed the need to instal a separate water injection manifold, greatly simplifying the fuel system hardware of the gas turbine. With this, the steam turbine market was subtly changing. Low growth in electricity demand in Europe had reduced demand for large steam sets for coal- or oil-fired or nuclear power plants, and countries which had discovered gas and had previously built steam plants with 120–200 MW steam sets were now installing combined cycles for which a 350 MW unit would require a steam turbine of only about 120 MW and operating on a different steam cycle. Even for the largest single-shaft combined-cycle systems with the H-class gas turbines the steam turbine will still be less than 200 MW. Gas turbine developers who also made steam turbines were better able to cope with the changing demand than companies which had built only the very large turbines for steam plants, for which there was then a very small international market. Already the first large changes had taken place in the industry. ASEA, the Swedish power engineering company, had joined forces with Brown Boveri to create ASEA Brown Boveri (ABB). ASEA brought to the union ASEA Stal, thereby creating a company with production lines for the large Brown Boveridesigned gas turbines in Mannheim, Germany, and the small industrial gas turbines produced in Finspong; these were retained as separate operating divisions with a defined product range. To start with, only the GT35 was produced in Finspong but in 1992 they acquired the design and production of GT10, a 22 MW gas turbine which had been developed in Switzerland by Sulzer. Following this, Sulzer pulled out of gas turbine manufacture and has since built up a global compressor, pump and gas turbine maintenance business. Further development of GT10 continued at Finspong culminating in the production of a higher-power version for specific applications in compressor drive and industrial combined heat and power schemes. In 1988, an Anglo-French group was formed as GEC Alstom. The British company GEC had developed an 85 MW gas turbine in the EM 610 which had limited success in simple-cycle applications for power generation and mechanical drive. They also packaged Rolls-Royce aero-derivative gas turbines in their Leicester works. Ruston Gas Turbines, at Lincoln, with their small industrial range were also in the GEC Group.
WPNL2204
Gas turbine developments
69
Alstom were the GE licensee for gas turbines with their main factory at Belfort in eastern France and had collaborated with GE in the development of the Frame 9 models. From the merger was born a new company, European Gas Turbines (EGT), with GE and Alstom as the shareholders. The EM610 was discontinued together with the packaging of the Rolls-Royce engines. Gas turbine production in the UK was concentrated in the Ruston factory in Lincoln, which took over the packaging of the GE aero-derivative gas turbines. In France, Alstom expanded their gas turbine operations in Belfort. Later GE’s German business associate, AEG Kanis, of Essen, was incorporated into EGT and a new factory was built there, principally for the assembly of the smaller GE gas turbines (Frames 3, 5 and 6) for the emerging east European and Commonwealth of Independent States (CIS) markets. The European market picked up after 1990 with privatisation of the electricity supply in the UK. Elsewhere in the world, at about the same time, a broader range of gas turbine fuels was being considered where natural gas was not available or in short supply; naphtha, gas condensates, heavy oils and crude oil, and hydrogen have all been used as gas turbine fuels. Particularly in India, naphtha was being considered as an alternative fuel to overcome a conflict of interest in natural gas which was required not only for power generation but also to make fertiliser. With the discovery of gas in the Indian Ocean a pipeline had been laid from a shore terminal north of Mumbai to Delhi, and three combined cycles had been built along the route. However, beyond Delhi the line terminated at Babrala, the site of the Tata Chemicals fertilizer factory which had a 50 MW combined heat and power unit supplying power and process steam to the factory which used the rest of the gas as a feedstock. With a growing rural population, a strong demand for natural gas for the fertiliser industry to increase food production conflicted with demand for power generation. For example, Kawas, a 600 MW combined cycle at the southern end of the pipeline, with four GE Frame 9E gas turbines in two 300 MW blocks was for much of the first 3 years constrained to use only one gas turbine (half a block) because of demand from the fertiliser industry for natural gas. Naphtha, of which there was a production surplus at Indian refineries, was seen as a way round the problem, and the four gas turbines at Kawas were converted to naphtha firing in 1996. Naphtha is a difficult corrosive fuel with a low flash point and poor lubricity, which requires the use of a lubricity enhancer. This is an additive which creates a lubricating film on the surface of the pipe carrying it. Early enhancers were essentially corrosion inhibitors designed for use in pipelines. In the much smaller dimensions of gas turbine fuel systems, these compounds were forming sticky deposits by reaction with the contaminants in the naphtha, which were collecting in mechanical flow dividers and fuel filters. Some gas turbines are more affected than others, notably those with can–annular combustion systems incorporating flow dividers. Those gas turbines with different combustion
WPNL2204
70
Generating power at high efficiency
systems are less susceptible, but the properties of naphtha have to be considered as it can still form deposits in pumps and pipes. The search for a solution lies with the companies making fuel treatment additives for oil-fired gas turbines which required some kind of treatment system to remove traces of sodium, potassium and vanadium from the fuel. Lubricity enhancers were developed which can provide protection for critical fuel system components. Generally the naphtha-fired gas turbines are found in the smaller industrial combined heat and power schemes, but gas condensates are found in many fields and provide an alternative liquid fuel; however, generally these are separated out before they reach the power plant. In the UK the increasing number of gas producers entering the market caused some generators to take the risk and to design only for gas, which offered a significant reduction in the price of the gas turbine as well as the elimination of oil treatment and storage. Sour gas, containing hydrogen sulphide, could not be fed into the public system and could only be burned in power stations. The Liverpool Bay sour-gas field supplies the Connah’s Quay station. It was because of this that the station obtained planning consent when the British Government was again under political pressure to slow down gas developments and to give more support to a declining coal industry. In the background to all this there was in progress a development of larger gas turbines that could support higher steam conditions with reheat and even oncethrough steam cycles, which would raise combined-cycle efficiency to almost 60%. More powerful gas turbines would be able to generate more steam at higher pressures to achieve greater efficiency but, if this meant going to higher firing temperatures, the question was whether the single-figure NOx levels would be lost. There were two aspects of the development of these large gas turbines: greater controllability of the gas turbine at higher power output and better distribution of combustion and cooling air to retain low emission levels. The first gas turbines of this new F-class were ordered in 1988 for a combined-cycle power plant at Chesterfield, Virginia some 40 km south of the state capital, Richmond. This was the GE Frame 7F initially rated at 159 MW. Then 4 years later the scaled-up 50 Hz model, the Frame 9F, which was initially rated at 220 MW, went into operation on an EdF site at Gennevilliers in the northern suburbs of Paris. Westinghouse had meanwhile concentrated on the development of a competing unit, the 501F, which was launched in 1989 at an initial rating of 153 MW. Their first four units were installed in a repowering scheme for Florida Power and Light at the Fort Lauderdale power station, which went back into service in June 1993. In fact, the Westinghouse units had remarkably trouble-free entry into service and several were sold to South America and the 60 Hz countries of Asia, for which a separate production line was set up at Ulsan, in South Korea. The air entering a gas turbine has two purposes: as combustion air to produce the power output and as cooling air for the power turbine blades and vanes. The
WPNL2204
Gas turbine developments
71
question then was how to reduce the amount of cooling air required and to reassign it to combustion as temperatures increased. For the European designs there was a very large hot metal mass in the centre of the machine directing the compressor output to the combustor silos and returning the heated gas to the power turbine. If this could be replaced with an annular combustor system similar to that of the latest turbofan aero engines a significant amount of air could be released to combustion and lower NOx levels would be attainable at higher firing temperatures. The first of the new European gas turbines to be announced was ABB’s type GT13E2 of which the first examples were installed in the Deeside power station, near Chester in northwest England, and to a district heating plant at Diemen, The Netherlands. It offered a modest power increase over the GT13E, from 150 to 165 MW but had an exhaust output of 532.5 kg/s at 610 °C. For this design the silo of the earlier GT13E was removed and replaced with an annular combustor with 57 of the so-called EV burners. By adopting an annular combustor, more air was used for flame dilution to control emission levels. Also by removing the silo combustor it eliminated the large hot metal mass. The straight-through duct from the burners to the turbine inlet was a much simpler construction with a greatly reduced cooling load. Deeside went into operation in 1994 and was the first station in service with a three-pressure steam cycle, but without reheat, and the efficiency was 54%. A reheat steam cycle would be introduced with the larger GT24 and GT26 gas turbines, and the GT13E2 has served as a proof test of the annular combustor which has since been installed on all current Alstom models except the GT11N2. In September 1993, ABB had announced two new gas turbine models: the 165 MW GT24 for the 60 Hz market and the 240 MW GT26 for 50 Hz systems. They were common scaled designs which incorporated a sequential combustion system. The company had inherited the Brown Boveri gas turbine fleet which included 11 of 26 units of an earlier sequential combustion design that were still in operation. The first sequential combustion gas turbine was installed as a simple-cycle unit at Beznau, Switzerland, in 1948 which operated on liquid fuel. Sequential combustion has two combustors separated by a single power turbine stage. The first combustion with a heavily diluted low-NOx flame has enough oxygen for a second stage of combustion. Expansion through the high-pressure turbine stage reduces its temperature so that more fuel can be added in a second burner but not to raise the firing temperature above that in the upstream combustor. The original sequential combustion machine at Beznau had a turbine inlet temperature of 575 °C, which is less than half that of the current models, yet as an oil-fired unit in simple-cycle operation it had 30% efficiency, which was significantly higher than was achievable with some of the other gas turbines of the time. The GT24 and GT26 have two annular combustors. The first has the standard EV burners as on all the current Alstom gas turbines. The standard EV burner in the second stages is a simpler device which receives gas that is lower in oxygen content and completes combustion without any more NOx being formed.
WPNL2204
72
Generating power at high efficiency
The other benefit of sequential combustion is the high part-load efficiency. In any gas turbine, most of the work is done in the first blade rows. In the sequential system the first turbine stage is placed between the two combustor stages. To go to part load, the inlet guide vanes and the fuel flow to the first combustor are the main control actions. This determines the mass flow and temperature to set the energy level. The gas leaving this first stage then goes to the second-stage combustor for which the fuel flow has not changed. The gas continues to expand but the exit temperature is still set for a full load and the exhaust temperature is higher than with a conventional single-stage combustor; therefore the efficiency of the steam turbine is higher at part load. Other features of the new gas turbines were a much higher power density than the competing models owing to the pressure ratio of 30:1, which was double that of the Frame 9FA. Since then, the latest upgrade with new compressor blading, released in 2005, has a pressure ratio of 32:1. Then, at the end of 1996, Siemens introduced a redesign of their three F-class gas turbines of which the first examples had horizontal silo combustors (Fig. 4.5 and Fig. 4.6). The main feature of the redesigned gas turbines was the replacement of the silo combustors with an annular combustor utilising smaller versions of the low-emissions burners used in the original silos. Models V94.3A, V84.3A and V64.3A were all announced together in 1996 as a scaled family according to mathematical laws of similarity. Behind this there was the development of new high-temperature alloys and in particular single-crystal blades that would be used in the hottest first-stage blades of the power turbines. All the three gas turbines drove the generator from the inlet end and used the static converter starting system. Variable-inlet guide vanes were introduced as an additional control measure. In many markets a requirement is for operators to carry a spinning reserve of, say, 10% of output. For a large gas turbine, the easiest way to achieve this is to hold the guide vanes partially closed with a corresponding reduction in fuel flow to the burners. While these developments were going on, problems were starting to appear with the GE Frame 9F. For the 50 Hz market, GE had again entered a joint development with Alstom, but by this time they had moved their large gas turbine production and development to a new factory at Greenville, South Carolina. Production of the 50 Hz gas turbines was shared between Greenville and Belfort, with Belfort handling more of the early production. The new gas turbine known as the Frame 9F was initially rated at 220 MW and the first unit was installed in the autumn of 1992 on an EdF site at Gennevilliers in the northern suburbs of Paris. In the European market the Frame 9F was the first of the 50 Hz F-class gas turbines to be announced. The Frame 9E was well known and was a market leader. What made the 9F attractive was the higher power and firing temperature which made it possible for the first time to use a reheat steam cycle and to achieve a combined-cycle efficiency of 55%. At a time of rising gas prices this was particularly attractive when compared with other combined cycles of the time
WPNL2204
Gas turbine developments
73
4.5 Seraing, Belgium: one of two units of the Siemens Model SGT53000E (V94.2) in the second of three 450 MW combined-cycle stations installed mainly for mid-load duty.
4.6 Tapada do Outeiro, Portugal: one of the first examples of the Siemens Model SGT5-4000F (V94.3A) during installation in 1997. The intake structure is visible on the left.
WPNL2204
74
Generating power at high efficiency
using the gas turbines then available which at best achieved an efficiency of about 52%. The first combined-cycle application was at Keadby ordered in 1992 to be built on a former power station site in the Trent valley, for Scottish Hydroelectric. The plant was to have two gas turbines and a steam turbine to make a 700 MW combined-cycle plant. In the 2 years that followed while the station was built, GE continued development and brought out an improved version, the Frame 7FA, for the 60 Hz market and had acquired a number of combined-cycle orders in the USA and Mexico. In Europe, EGT launched the 9FA and orders continued to be received by Alstom and GE so that, by the time that Keadby was commissioned, some 39 units of Frame 9FA had effectively been ordered off the drawing board. Then problems struck. The Keadby units had not been running for more than a few hundred hours when excessive rotor vibration was noted in both machines. This resulted in the unusual precedent of removing the rotors and airlifting them back to Greenville for examination. The problem did not stop there, as one by one the other 9F sites reported similar problems at about the same running time. This first problem was confined to the European-assembled Frame 9F gas turbines and was due to a weakness and cracking of some rotor tie bolts from a particular source. This was cured by redesign of the bolts and did not affect any of the 60 Hz machines. The second problem was in the design of the power turbine in the upgraded FA models. In particular it was due to differential expansion in the inter-stage disc spacers, which required a change in some material and a redesign of the affected component. This problem was complicated because all of the FA machines were affected at both frequencies, The Frame 7FA had been introduced first and several had been in commercial operation by the time that the first Frame 9FA gas turbines started to be commissioned. Because of the different dimensions and operating speeds the Frame 7FA gas turbines started to fail at around 10 000 equivalent operating hours while for the Frame 9FA gas turbines the problems started to appear with excessive vibration at about 1000 equivalent operating hours. In real time this meant that all the problems appeared within a few months of each other. A major programme of works between GE and EGT resulted in a redesign of the rotor and all the operating plants were refitted with new rotors; a few new units from the original order book were shipped with the new rotors installed. Two units for the South Bangkok plant of the EGAT were shipped intact with the old rotors which were stripped out on site and sent to the GE maintenance base in Singapore for rebuilding. By arranging it in this way, since EGAT were one of the last to order the Frame 9FA in the original batch, they could install the lower casing of the gas turbine and all the auxiliary connections while the rotors were being repaired, and as a result there was hardly any time lost in their original commissioning schedule. Since then the Frame 7FA and 9FA models have held their own in the market,
WPNL2204
Gas turbine developments
75
4.7 The water brake at the Siemens Berlin works, which can load test both 50 Hz and 60 Hz machines. Rated at 180 MW, it is shown here in March 2004 while testing a Westinghouse-designed SGT6-4000F gas turbine.
but the GE experience, because of the number of units involved, caused the power generators to think again about the new 250 MW class gas turbines and there was a slowdown in the rate of ordering of all types. One result was the decision of some of the gas turbine manufacturers to build their own test facilities that could be operated as an independent power plant in a working utility environment. There were two consequences flowing from the GE problems. Until this time, most manufacturers had a no-load facility to test the mechanical integrity of their gas turbines but depended on an obliging first customer who would allow them on site for the first few months to take measurements and to validate their design. Only Siemens with a 150 MW water brake in their West Berlin factory and Mitsubishi with a 130 MW resistance bank at their Takasago works could test any of their previous gas turbines at full load before shipping them. For Siemens it had been an absolute necessity because, until 1990, they were behind the infamous Berlin Wall with no access to a gas supply. When, in 1996, Siemens announced three new gas turbine models to a common scaled design according to mathematical laws of similarity, they had by then upgraded the water brake (Fig. 4.7) and were able to test the validity of the principle of similarity on the two smaller machines. Under this principle, if geometrically similar machines are rotating with the same circumferential velocities, they will have the same aerodynamic performances. Mass flow and output are proportional to the square of the linear dimensions. All the blades in each machine have the same profile but are inversely proportional in their linear dimensions. The three gas turbines were the V64.3A at 67 MW, the V84.3A at 185 MW and
WPNL2204
76
Generating power at high efficiency
the V94.3A at 272 MW. By scaling in this way and with the water brake able to test the two smaller machines, they would be able to see that the principle of similarity was valid and extrapolate from the measurements taken to manufacture the largest machine. The first unit was the V64.3A, which runs at 5400 rev/min and drives the generator through a gearbox. This established the basic parameters of the design, and it was then a case of taking the same measurements with the larger Model V84.3A running at 3600 rev/min. Both units were found to conform to the similarity law within the range of manufacturing tolerance so that dimensions could be extrapolated to Model V94.3A. In the deregulated market, with the need to test the large F-class gas turbines, and even larger models in the future, it would be possible to build a power plant specifically as a test bed and to sell the power to the local utility like any other independent power producer. Since most deregulated markets used a bidding arrangement 24 h in advance, it was easy to specify the time of a test and the amount of power that could be produced. Siemens built the Cottam Development Centre in England and installed a singleshaft combined cycle as a test bed for Model V94.3A and later gas turbines. This went into service in 1999 and also had the first working example of the Benson heat recovery boiler. ABB had an empty bay in the factory at Birr, near Baden, and there installed the prototype GT26; subsequently it was used extensively to work out design improvements for the uprated B machines Again by announcing two scaled models the 50 Hz GT26 would be backed up by field tests of the GT24 prototype in the USA. For the next generation of gas turbines to follow their 60 Hz F-class gas turbine, Mitsubishi built a power station beside their Takasago works and ran the steamcooled M501G as an independent power producer, selling their output to Kansai Electric. The other consequence of the GE gas turbine problems was the restructuring of the gas turbine industry, starting with the break-up of EGT. GE started to buy into some of its manufacturing associates, creating out of Nuovo Pignone in Italy, GE Oil and Gas. Kvaerner, their Norwegian associate, became the main packager of the GE aero-derivative gas turbines. Other European business associates became regional maintenance centres for GE gas turbine models and driven units. Alstom, as a major French power engineering company in their own right, were unwilling to become a subsidiary division of GE. They gave up their GE licences and pulled out of the European gas turbines joint venture. GE continue to manufacture in a part of the Belfort works and took over the former EGT offices there together with the factory in Essen. The GE power engineering business in Europe became GE Energy Products with headquarters at Bracknell in the UK. About a year later, Alstom acquired the power engineering business of ABB and the gas turbine business remained with the headquarters in Baden, Switzerland.
WPNL2204
Gas turbine developments
77
4.8 Blackstone, USA: inside the GT24 package looking towards the turbine. Large-diameter pipes carry bled air to be cooled before it is returned to the power turbine stages.
The large machines over 50 MW continued to be assembled in the former ABB factories in Switzerland, Germany and Poland, and a small industrial gas turbine division was created, based on the Lincoln, UK, factory, formerly of EGT, and the former ABB Stal plant in Finspong, Sweden. An assembly line for the GT11N2 was built as an extension to the ABB turbomachinery maintenance centre in Richmond, Virginia, and continued to supply that market. Alstom also acquired the former ABB joint venture with Kawasaki as Japan Gas Turbine KK. Kawasaki Heavy Industries at Kobe had earlier supplied to the combined cycle at Limay Bataan, Philippines, the six GT11N and the heat recovery boilers, for which they held a licence from the American company Vogt. This relationship was further developed and Kawasaki have supplied Alstom gas turbines to the Asian 60 Hz market, and also supplied GT11N2 for customers in the USA. Kawasaki were also given the development of the combustion system for low BTU gas and have two examples of gas turbines applied to the GT11N2 at the Baoshan steelworks in China and at Mizushima, Japan. Besides this they also manufactured the GT26 for the Chiba Mill combined cycle in Japan, and the Tocopilla project in northern Chile. Alstom became the designers and principal producers of all the former ABBdesigned gas turbines including the GT24 (Fig. 4.8) and GT26 which were just
WPNL2204
78
Generating power at high efficiency
entering the market. With many GT13E2 by then in operation the EV low NOx burner was a proven design in the first stage combustors of GT24 and GT26. The original GT26 units on four combined-cycle plants in the UK, Germany, Argentina and New Zealand worked well and demonstrated the operational features of the sequential combustion system. It was when the more powerful B version of the gas turbines was introduced late in 2000 that troubles appeared, stemming from a misdirection of cooling air flow in the second stage of the lowpressure power turbine. Like GE before them, they too had a large order book for which they had to find a common solution that would be applied to some units out in the field and to the remaining few in production in the factory. Where Alstom’s problem had differed was that operating units could carry the fault simply by running at a lower temperature and mass flow. This meant that operators could still earn some revenue but with a plant running at part load which could not meet its contracted performance guarantees. Consequently Alstom, in designing and testing new components which would result in a more powerful gas turbine than they had offered previously, also had to cope with compensation payments to customers and occasionally litigation over missing performance guarantees. Improvement occurred in stages. The first step was to amend the cooling arrangement and to make some other changes to turbine blading to prepare for the planned power upgrade. This was given to all existing operators. The second step was the new compressor that offered a set of blades which could replace the originals in situ at a major maintenance outage. The result of these changes is an increase in power for GT24 from 183 to 188 MW, with a compression ratio of 32:1 (30:1) and exhaust mass flow of 445 kg/s at 612 °C. For the GT26, the power is up from 265 to 281 MW, the pressure ratio is up from 30:1 to 32.1:1 with an exhaust mass flow of 632 kg/s at 615 °C. While seeking solutions, Alstom had focused on their smaller gas turbines and won several contracts for GT13E2 and GT11N2. They also won several orders for steam turbines and for the maintenance and refurbishment of gas turbines, steam turbines and hydro turbines, but the litigation associated with the GT24 and GT26 contracts and the redevelopment costs of these gas turbines had resulted in a financial ‘black hole’ amounting to some €6 billion in their accounts for the fiscal year 2002–2003. The decision was therefore taken to dispose of the small gas turbine and industrial steam turbine divisions based in Lincoln in England, Finspong in Sweden, Nürnburg in Germany, and Brno in the Czech Republic. There was a ready buyer to hand in Europe. While Alstom had been grappling with their gas turbine problems, Siemens had followed their takeover of Westinghouse with first the aquisition of the gas turbine maintenance group Turbocare and then Demag Delaval, makers of pipeline and process compressors and small steam turbines. With this they created a new industrial power division with headquarters in Oberhausen. The Lincoln and Finspong divisions of Alstom were a source of gas turbines that
WPNL2204
Gas turbine developments
79
would fit comfortably into the new industrial division and this led to the creation of Siemens Industrial Turbomachinery. The steam turbine activities at Finspong are now linked to the industrial steam turbine division with headquarters in Görlitz, Germany. At the end of 2003 the transfers were complete and Alstom had also started to market the GT24 and GT26 again. A first order from the Spanish utility Gaz Natural for a combined-cycle plant with three blocks of GT26 at the final rating was confirmed in December 2004. A consequence of the development of these large gas turbines has been the application of their technology to the previous generation of units as performance upgrades, and the production, by scaling down, of a machine of about 60 MW, capable of running on either 50 or 60 Hz networks and addressed to the larger combined heat and power schemes and medium-sized combined cycles in a 2+2+1 configuration. GE were the first with the Frame 6FA, at 70 MW, in 1994. It had a pressure ratio of 15.7:1 and ran at 5254 rev/min. Siemens, meanwhile had developed the equivalent model as SGT-1000F (V64.3A) which was released in 1996 as one of three scaled F-class machines. This had a 15.8:1 pressure ratio and an annular combustor and ran at 5400 rev/min. The third member of the group was independently developed as the ABB Type GT8 at 46.4 MW in January 1985. Successive upgrades and replacement of the original silo combustor by an annular combuster with EV low-emission burners, and application of computer-profiled blading as on Alstom’s large sequential combustion machines, have resulted in the GT8C2 rated 56.3 MW. It has the highest pressure ratio of the three at 17.6:1 and runs at 6219 rev/min. All three of these intermediate-sized F-class gas turbines have found application in industrial combined heat and power schemes. A large market has been in the former East Germany where Siemens, in particular, has sold a number of combined-cycle plants each with two gas turbines and a steam turbine as a rebuild of district heating stations in Dresden, Leipzig, Chemnitz and Halle. In addition to these, a number of the advanced technology features have been built into upgrade kits for the E-class gas turbines. Computer-profiled blade design has led to higher blade efficiency with fewer losses. Better base materials and coatings have led to modest temperature increases in power turbines with more efficient cooling. Changes are mainly improved compressor blades to increase mass flow, and changed turbine blades and the associated vane carriers with superior cooling arrangements. Generally upgrades are concentrated in the turbine section where more power can be achieved by the combination of more efficient blades at a marginally higher working temperature with improved cooling. About a 10% increase in power output is possible on a 100 MW gas turbine. However, larger gas turbines are on the way. The European manufacturers by moving to an annular combustion system for their F-class units gained the extra
WPNL2204
80
Generating power at high efficiency
combustion air which enabled them to hold down emission levels to those of the previous generation of gas turbines. The American manufacturers with their can– annular combustion system did not have an obvious design feature that could be changed and in any case could wait for the next development at even higher firing temperatures before they needed to address the issue of redistributing airflow. The first model to be introduced with steam cooling of the hot-gas path was the Westinghouse Model W501G announced in 1995. This was basically the Model W501F with an increased pressure ratio from 17.4:1 to 20:1 and steam cooling applied to the transition ducts connecting individual combustor cans to the turbine inlet. In fact, compared with the W501F, the exhaust conditions give a 22.4% higher mass flow for an output of 266 MW and an increase of exhaust temperature from 576 to 597 °C. Effectively steam cooling has raised the output almost to that of the equivalent 50 Hz model of the F-class air-cooled gas turbine. The prototype W501G was installed at the Lakeland power plant in Florida, in 1998, and for 2 years operated in simple-cycle mode for testing and validation of the basic design. The gas turbine has a can–annular combustion system with 16 cans and a turbine inlet temperature of 1400 °C. Steam cooling is applied to the transition pieces, giving 16 cooling paths through the gas turbine between the inlet and outlet manifolds of the steam circuit. Initially, cooling steam was supplied by a small once-through heat recovery boiler using a portion of the exhaust gas flow. It was later converted to a combined cycle with a new three-pressure drum-type heat recovery boiler, and a steam turbine and generator. It went back into commercial operation in April 2001. The temporary once-through boiler was shut down. In any steam-cooled gas turbine the steam pressure must be higher than the working gas pressure of the machine. Since the gas turbine pressure ratio is 20:1, intermediate-pressure steam at 30 bar is used. If there were to be any leakage in the steam path, moisture would go into the gas turbine where it could be easily detected, and not gas into the steam cycle. In a normal three-pressure reheat steam cycle the intermediate-pressure output of the heat recovery boiler joins the returning cold reheat line from the steam turbine and the combined flow goes through the reheater. At low loads, below 20%, there is no steam flow through the transition pieces and all of the intermediate-pressure output goes to the cold reheater inlet as in a conventional three-pressure heat recovery boiler. As the load builds up, the intermediate-pressure flow to the cold reheater is gradually reduced as steam is diverted to the transition pieces. By the time that the gas turbine reaches full load, most of the intermediate-pressure steam is going through the transition pieces, where it enters at 275 °C and leaves at 485 °C. Development of these gas turbines started when Westinghouse was still linked to Mitsubishi, who because of their dual-frequency domestic market also developed a 50 Hz version as the M701G. Only two have been built and are installed in
WPNL2204
Gas turbine developments
81
a further combined-cycle extension of Tohoku Electric’s Higashi Niigata power station where they have been running since 1999. Fiat, the third member of the group, did not build a steam-cooled unit. They only served the 50 Hz market and there was no demand for an even larger gas turbine than the 701F at 252 MW. Steam-cooled gas turbines are very much intended for base-loaded plants since the cooling steam flow is integrated with the steam cycle to improve the efficiency. Because they have to utilize steam cooling as they run up, they take longer to start than an air-cooled unit. Mitsubishi uses an auxiliary boiler to provide cooling steam for the gas turbine start-up and there is therefore no change from air to steam cooling as the gas turbine runs up. The company has also experimented with steam-cooled rotor components and has tested rotors on their Takasago test plant, but the general view is that it is not worth pursuing for the small power gain that results and the added complexity needed to achieve it. Meanwhile Mitsubishi has supplied four M501G for the 1200 MW Ilijan combined-cycle project in the Philippines and has supplied several units to combined-cycle projects in the USA. One other development which was brought to completion at the end of 2003 was the Baglan Bay combined cycle near Swansea in South Wales, which was the first commercial installation of the steam-cooled GE Frame 9H gas turbine. Where this differed from the Mitsubishi and Westinghouse units is in having steam cooling of the rotating turbine blades. The gas turbine has been promoted as the entry model for 60% combined-cycle efficiency but, as a first unit, GE have paid more attention to testing the gas turbine and Baglan itself will not reach 60%, which will require a different steam turbine. It was less than 10 years since the 9F problems, magnified by the number of units ordered off the drawing board, and they were taking no chances. The Frame 9H is probably the most extensively tested gas turbine ever. Even before it arrived in the UK, tests of individual components and subassemblies preceded actual assembly to be followed by factory tests at no load, as it is a 50 Hz machine, and an extended period of testing on the British grid was undertaken before the unit was handed over to the customer at the end of 2003. The Frame 9H gains 25% more power with 8% higher mass flow as compared with the air-cooled Frame 9F. It has an 18-stage compressor with a pressure ratio of 23.2:1. The steam-cooled components are the transition ducts and the first two rows of vanes and blades of the four-stage power turbine. The third stage is conventionally air cooled, but the air bled from the compressor is cooled and the surplus heat goes to the fuel-gas preheater. In other respects Baglan Bay is a conventional single-shaft block with a three-pressure steam cycle, but using a drum-type boiler at 152 bar and 565 °C. The Baglan gas turbine has the performance that would achieve 60% with an optimised steam cycle. That will come with the first three production units which are destined for Tokyo Electric Power’s Futtsu extension which is expected to start
WPNL2204
82
Generating power at high efficiency
up in 2008. The first of the three gas turbines for this project was shipped in the summer of 2006. Development of the steam-cooled gas turbines spanned the period of the last major changes in the industry. In the summer of 1998, Siemens took over the non-nuclear power business of Westinghouse at a time when there appeared to be a growing American demand for combined cycles. Siemens had already acquired the Turbocare gas turbine maintenance group and would go on to take over Demag Delaval to create an industrial power division. With the Westinghouse merger, they acquired the gas turbine production plant at Hamilton, Ontario, which they have since integrated with their Berlin operation. Gas turbine research and development was centred on Germany with specific contributions from the former Westinghouse design centre in Orlando. The water brake in Berlin has been uprated so as to be able to test design improvements to the W501F. For a while, before the American market collapsed at the end of 2001, they produced a number of 501F gas turbines in a new workshop in Berlin to relieve pressure on the Hamilton factory and to familiarise their German workers with the American design. With the development of these new large gas turbines and the reshaping of the industry supplying them there has been a redesign of the combined cycle itself. In part this is an initiative of the gas turbine industry and in part also of some of their customers. However, it was not until the 250 MW class gas turbines appeared that the first single-shaft designs appeared in Europe. Since the gas turbine companies were the successors to the great power engineering companies of the early twentieth century, they also built steam turbines, generators, switchgear and control systems. It was an easy move from here to design a combined cycle on the basis of the energy output of the gas turbine expressed as so many tons per hour of steam at a particular temperature and pressure and to design a steam turbine to handle it, then you have the beginnings of a standard power train with the gas turbine and steam turbine with the generator in the middle of the line. The power system in the USA differs from that in most other countries in having installed a large number of heavy-frame gas turbines which operate in simplecycle mode as peaking units. Many combined cycles have been created by adding two or more heat recovery boilers and a steam turbine to gas turbines on the same site. The only single-shaft combined-cycle blocks there are those which have been installed by European contractors. The other American development is the IGCC which has been applied commercially with a three-shaft combined-cycle arrangement using two GE Frame 7FB gas turbines (Fig. 4.9). This is the largest of the 60 Hz GE F-class machines with an ISO rating on natural gas of 184.4 MW mainly from an improved compressor design. As the S207 combined cycle, it has an output of 562.5 MW at an efficiency of 57.5%. In its IGCC application with the additional mass flow of the nitrogen returned from
WPNL2204
Gas turbine developments
83
4.9 A GE Frame 7FB awaiting shipment from the Greenville, South Carolina, factory. A version of this with a modified combustor is being offered to the first IGCC schemes. (Photograph courtesy of GE.)
the air separation plant the combined-cycle output rises to 630 MW, but efficiency from coal to electricity will be at best only 40%. For most of the twentieth century the efficiency of steam power plants was gradually improved by the development of larger steam turbines with higher steam conditions so that by 1970 a large coal-fired power station with three 660 MW reheat steam sets and input steam conditions of 160 bar and 550 °C would have an efficiency of about 37%. Introduction of mild supercritical steam cycles with high pressures but the same temperatures, in the 1980s raised the efficiency of pulverised coal-fired plants to about 41%. The largest gas turbines operating alone with natural gas have efficiencies of about 38%, which is the main contribution to the combined-cycle efficiency of 58% in the case of a single-shaft system on the 50 Hz network. With some of the largest gas turbines, steam cooling has supplied a further energy input to the steam cycle. For the Alstom GT24 and GT26 the high compression ratio of 32:1 in the latest versions means that the air bled off from the compressor is too hot for effective cooling of the power turbine blades and vanes. For these gas turbines, which are basically air-cooled machines, there are two cooling air bleeds from the compressor; the air is passed through two once-through coolers which divert high-pressure feedwater from the economiser exit and recombine it with the main steam flow at the superheater output. The notable aspect of this sytem is that the cooling circuits do not impinge on the gas turbine operation. The compressor is running at synchronous speed at all times and it is only the setting of the inlet guide vanes and the fuel supply to the
WPNL2204
84
Generating power at high efficiency
4.10 A rotor of the prototype SGT5-8000H gas turbine at the Siemens Berlin works. The gas turbine left the factory in April 2007 for Irsching, for testing which began in December 2007. (Photograph courtesy of Siemens.)
combustor stages which determines the output of the gas turbine, so that at all levels of load there is a cooling requirement for the cooling-air supply to the turbine stages. At the end of 2005, Siemens quietly announced that they would build a new gas turbine with a 21% increase in power output as compared with the SGT5-4000F, currently their largest 50 Hz gas turbine model. Very little has been revealed except that it is the first new gas turbine from the integrated Siemens and Westinghouse design teams and that it is designed specifically for combined-cycle application. It is an air-cooled design which suggests that most of the power gain has come from higher mass flow with a modest increase in firing temperature. Designated SGT58000H, it is rated 340 MW at an efficiency of 40% (Fig. 4.10). Unusually the announcement of the new gas turbines was couched in rather philosophical terms. A more powerful and efficient gas turbine is required to meet the demands of a growing world population and an expanding rate of growth of electricity demand, but most of this will occur in the newly developing industrial countries who are expected to account for 45% of demand in 2020 compared with 29% in 2000. New construction relates to growth in demand for electricity; it does not consider the hidden costs of replacing old power stations or upgrading some of
WPNL2204
Gas turbine developments
85
them to take advantage of new technologies and gain output. Two 530 MW singleshaft blocks of the new gas turbine would replace a 1000 MW coal-fired power station with four 250 MW generating sets dating from around 1960 and would take half as long as the original station to build. Specific design issues have been tested in Berlin, but the prototype has been shipped to a site of E.ON Kraftwerke, at Irsching, Bavaria. There it will undergo proof tests in simple-cycle operation, and only when the performance has been evaluated and confirmed for commercial application will it be converted to a combined cycle. The prototype was completed in March 2007 and shipped out of the Berlin works in mid-April. It was dismantled into major sections for transport through Berlin to the canal dock where it was reassembled for shipment and, although Irsching is only about 5 hours by car from Berlin, at 17 m long and 5 m in diameter, and of mass 400 t, it would take at least 3 days by canal to reach the site on the Danube. In many ways, Siemens’ decision to develop the gas turbine is more interesting. It comes at a time of growing world population, the rapid industrial development of China and India, and the growing concerns of global warming. So the emphasis is on higher power and higher efficiency for lower fuel consumption and consequently lower emissions, but it has also come at a time when there is mounting concern at improving the flexibility of operation of the combined cycle. The definitive combined cycle for SGT5 8000H is rated at 530 MW and 60% efficiency, which points to lower costs of operation and maintenance. As an aircooled machine it is aiming for high flexibility of operation which is reinforced by the standard combined-cycle design which will only use a Benson boiler. Testing of the SGT5-8000H started in Irsching in December 2007. When these tests are complete and the design validated, the decision will be taken to add the heat recovery boiler and steam turbine. At the same time the scaled 60 Hz version rated at about 240 MW will be developed. However, the main concern underlying the development of the H-class machines is reliability. The problems with the F-class machines when these first went into commercial operation are still fresh in the memory. GE subjected components of Frame 9H to extensive testing before they were assembled into the prototype. It was then tested at no load in the Greenville, South Carolina, assembly plant before being shipped to the site in south Wales where it had further simple-cycle tests before the combined cycle was completed. Baglan Bay will have been running for 5 years and completed one full maintenance cycle, before the first unit goes into service in 2008 at Tokyo Electric Power’s Futtsu site. The H-class gas turbines are aiming at economy of scale, but as a combined cycle. Both gas turbines have been announced specifically for combined-cycle application. So who will provide the peak load? The oldest combined cycles have already fallen into this role in Europe and, provided that the F-class units have the required flexibility of operation, they also will handle peaks but the great demand for a base-load combined cycle will be in
WPNL2204
86
Generating power at high efficiency
places with a large hydro output but no more that can be economically developed; alternatively countries with large coal reserves may follow the IGCC route. The development of gas turbines which began after 1960 has taken output from 25 MW to over 300 MW, and the higher mass flows and exhaust temperatures that have accompanied this have opened the way to a wide range of applications and demonstrated not only high efficiency of generation but also a considerable reduction in emissions. The E-class gas turbines raised combined-cycle efficiency from 47% to 52%; F-class further raised efficiency from 54% to over 58% . H-class promises over 60%. Of the many fuels that have been used, the most difficult is coal. However, coalfired gas turbines have seen limited application, and coal-derived gas is on the point of application. An IGCC will produce a clean fuel, principally hydrogen, and may also have an economic benefit in reducing the import of fuel and also in the recovery of trace elements such as sulphur and mercury for which there might also be an import trade that could be reduced or stopped altogether. At present, one gasifier per F-class gas turbine seems to be the optimum arrangement. While this may be the cleanest and most efficient coal-fired power system the challenge is to improve efficiency by maximising process energy recovery to give it a real advantage over the pulverised coal steam plant and not just an emissions advantage. This will undoubtedly require a larger and more efficient gas turbine than the current F-class machines. In fact GE have studied their 60 Hz Frame 7H and suggested that it could offer significant improvement in efficiency up to 50% if applied to an IGCC. Meanwhile, what will become of the present concept of natural-gas-fired combined cycle? Will it continue to be the system of choice for capacity addition or will the price of gas force application into the mid-load strategy that was the normal operating mode for many of the early combined cycles? If the gas turbine defines the combined-cycle output, it is the flexibility of the heat recovery boiler that determines how best it can be used. Since the end of 2005 a number of combined cycles have been ordered in Europe with once-through boilers to achieve faster start-up in mid-load duty, with more than 200 starts/year. This would suggest that operators are starting to ask for combined cycles that are designed to take greater account of future applications over the whole of the plant’s lifetime.
WPNL2204
5 Steam generator concepts
There are two basic designs of heat recovery steam generator: drum-type and oncethrough designs. The vast majority of heat recovery boilers on combined cycles today are of the drum type, which can be in a horizontal or a vertical format. The horizontal boiler is a specifically American concept, and the vertical boiler exclusively a European and Japanese design. Both designs have spread around the world as developers have taken their technology with them. The once-through boiler was developed more than 80 years ago and has been used with many large coal-fired steam sets. In the move to higher performance with supercritical steam conditions, an increasing number of large steam plants around the world have once-through boilers, but it was only in 1996 that the first highpressure once-through boiler was applied to a combined cycle. This was in a repowering scheme at Badenwerke’s Rheinhafen power station in Karlsruhe, Germany. Since then, 36 gas turbines have been installed in 15 power plants with once-through boilers. Another 15 in nine plants, all in Europe, are under construction and six in a single project in Japan. By contrast there are almost 2000 large gas turbines installed in combined-cycle power plants around the world; so the once-through boiler is very much in its infancy of combined-cycle application. However, of the 51 gas turbines listed, 33 have boilers with a high-pressure output of 160 bar. The highest-pressure output on a drum-type boiler is about 135 bar on a vertical boiler with assisted circulation. In the last 10 years, more combined cycles have been built specifically for baseload duty and the constructors have in some cases acquired or licensed boiler manufacturers to produce their boiler designs (Table 5.1). As a result the majority of projects have the American-designed horizontal natural-circulation boiler installed behind the largest gas turbines. The vertical boiler is generally chosen if there is a particular requirement of the customer or the circumstances of the site require it, and usually when the developer is a European electric utility, either acting alone or leading an international consortium. With the development of the combined cycle with larger, more efficient gas turbines, which can support higher-temperature steam cycles, the drum-type boiler is reaching the performance limit. There are vertical boilers in operation with high87 WPNL2204
88
Generating power at high efficiency
Table 5.1 Combined cycles with once-through boilers: March 2008 Project
Owner/operator
Country
Gas turbines
Service date
Rheinhafen Badenwerke
Germany
1 × GT26
1997
Cottam
E.ON (UK)
UK
1 × SGT5-4000F 1999
Agawam
Berkshire Power
USA
1 × GT24
2000
Rosarito
CFE
Mexico
1 × GT24
2001
Monterrey
CFE
Mexico
3 × GT24
2002
Midlothian
American National Power
USA
6 × GT24
2002
Hays County
American National Power
USA
4 × GT24
2002
Blackstone
American National Power
USA
2 × GT24
2002
Lake Road
Lake Road Generation
USA
3 × GT24
2002
Bellingham American National Power
USA
2 × GT24
2003
Meriden
USA
2 × GT24
2003
Berkshire Power
Milford
Berkshire Power
USA
2 × GT24
2003
Monterrey
Iberdrola
Mexico
4 × GT24
2003
Hermosillo
Union Fenosa
Mexico
1 × GT24
2003
Herdecke
Stadtkraft/E-Mark
Germany
1 × SGT5-4000F 2007
HammUentrop
Trianel Power
Germany
2 × SGT5-4000F 2007
Irsching 5
E.ON Kraftwerke
Germany
2 × SGT5-4000F 2008
Langage
Centrica plc
UK
2 × GT26
2009
Sloecentrale Delta NV/EDF
Netherlands 2 × SGT5-4000F 2009
Lingen
RWE
Germany
2 × GT26
Uskmouth
Severn Power
UK
2 × SGT5-4000F 2010
Pego
EDP
Portugal
2 × SGT5-4000F 2010
Gönyü
E.ON Erömüvek
Hungary
1 × SGT5-4000F 2010
Malzenice
Slovensk Elektrarne
Slovakia
1 × SGT5-4000F 2010
Irsching 4
E.ON Kraftwerke
Germany
1 × SGT5-8000H 2011
Johetsu
Chubu Electric
Japan
6 × Frame 7FA
2009
2011
pressure outputs at about 135 bar, which have been designed specifically for loadfollowing duty. This is becoming a critical issue in combined-cycle operation since there is an increasing need for operators to cover peak demand periods. How this is achieved varies: some of the largest plants run down to about 50% load on weekday nights and shut down completely at weekends; smaller, more flexible plants may only operate no more than 14 h/day. Although the thermodynamic principles are the same for both the horizontal and vertical drum types, there are basic differences between the two designs which dictate how they can operate and, although the vertical design is now in the
WPNL2204
Steam generator concepts
89
minority of new applications, it has the advantage in terms of what it can do for the operator in power generation, load following and frequency control. Operation for 30 years in Europe has shown that the combined cycle with vertical heat recovery boilers is an inherently flexible power plant with a potentially fast response. Whether or not this can continue depends on the type of boiler fitted to the plants that eventually replace them. Combined cycle design has until recently focused on high power and efficiency, but operational flexibility is of increasing importance. The catalyst for this was Siemens’ magnanimous gesture in 2005 in offering the licence for their Benson heat recovery boiler to all the companies around the world who are designing and building heat recovery boilers. However, the traditional drum-type heat recovery boilers are still the preferred choice. If there should be a requirement for flexible performance on a single-shaft block with a large gas turbine, then the industry has the option of being able to offer either a drum-type or a once-through boiler design if the customer wants it. There might today be only four main suppliers of large gas turbines to the combined-cycle market, but there are many times that number of companies that can manufacture all or part of the heat recovery boiler. In any case, it accounts for about 30% of the total contract and, although it is the key to the operation of the combined cycle, it is generally the gas turbine manufacturer who, as the builder of the plant, has to procure the heat recovery boiler under the terms of a turnkey contract. Of the four gas turbine companies, only two have their own boiler divisions, but these are not used for all their projects. Mitsubishi’s boiler operation at Nagasaki produces mainly vertical boilers and supplies to projects in Japan and other Asian markets. Alstom own the former Combustion Engineering in Windsor, Connecticut, but again use other suppliers in specific markets. Engineering any sort of boiler is a job that can be performed by many companies around the world. First of all there may be a term in the turnkey contract for a combined cycle which requires a high degree of local content. Generally this means local firms for site preparation and erection of basic structures of power house and auxiliary buildings. There may be a pump manufacturer working as a licensee of a European or American producer, which might result in the use of a particular manufacturer’s pumps. Where there is a boiler company, it may have no experience of building a large heat recovery boiler but may have worked on large fired boilers for steam power plants previously installed in that country and therefore has many of the basic skills. There are many examples where these companies have worked on combined cycles with the main contractor to build some of the low-pressure drums and heat exchangers and to perform erection under supervision of the boiler contractor. Compared with 10 years ago there are now a number of boiler alliances, particularly in Europe, where the main boiler contractor can call on some of the other companies to build parts for each of the boilers in a large combined-cycle
WPNL2204
90
Generating power at high efficiency
5.1 Rio Bravo, Mexico: two of six heat recovery boilers on the site. The high-pressure output of 133 bar at 566 °C is near the limit of performance of the traditional drum-type unit.
contract. Technology transfer will have given these companies the same tools and equipment, and the only difference between one country and another is the productivity of the factory and the rates of pay for the workers. The first combined cycles in Europe all had vertical boilers. It was the natural direction of flow of hot gas, and they were being built on existing power station sites where space was limited, either to add capacity or to repower an old steam plant. AEE designed and built the first units at Korneuburg, Austria and, in Belgium, CMI supplied the boiler at Angleur near Liège, and later at Drogenbos. These two companies have the most knowledge and experience of combined-cycle development, although not necessarily the greatest number of installations. Both companies have retained the vertical design and, because of this, there is in Europe a huge experience of utility operation in load-following duty which is hardly known or understood in North America. There, all but a few combined cycles have horizontal natural-circulation boilers, the exceptions being the small combined cycles and industrial combined heat and power schemes which have the vertical once-through boiler from the Canadian firm, Innovative Steam Technology (IST). Three combined-cycle blocks at Rio Bravo, Mexico, have a total of six vertical drum-type boilers (Fig. 5.1). EdF International, who had entered Mexico as an independent power project developer, had taken the site for three 500 MW combined-cycle blocks on a 25 year build–own–transfer deal. Located about
WPNL2204
Steam generator concepts
91
60 km south of Harlingen, Texas, the surrounding communities are developing and have a large air-conditioning load in the summer, and a much lower load for the rest of the year. EdF ordered the boilers from CMI because they had experience of them in Europe and saw the need to run at lower output at night and to shut down at weekends in the off-peak season. The Brighton Beach combined cycle in Canada, near Windsor, Ontario, which went into service in 2003 similarly has two vertical drum-type boilers from AEE which were specified because the owners wanted the plant primarily for loadfollowing operation and frequency control. A large power system with predominantly thermal capacity will carry a component of spinning reserve which will cover the loss of the largest generating set on the system. What this means in practice is that the power plants will run at reduced output so that, if one of them loses a set for whatever reason, the others can increase output quickly to restore the lost capacity. Even in normal operation the removal or addition of load will be expressed as a change in frequency which must be held between very fine limits, a frequency of 50 Hz may in practice mean anything between 49.9 and 50.1 Hz and, if it goes outside these limits, then either the plant output must be increased or load must be shed to compensate. The traditional way in a utility system with mainly steam plants would be to set up a merit order of performance under which those with the highest efficiency and lowest production costs would be base loaded with, below them, a progression in order of operation down to the least efficient and most expensive. The exception to this rule would be the nuclear plants which are limited in their load-following capability and generally have the lowest operating costs and therefore carry the base load, and hydro stations which are highly flexible in operation and can be assigned to peaks and frequency control where they exist. The early combined cycles in Europe were in predominantly thermal power systems in Austria, Belgium, Germany and Ireland and were designed for flexible mid-load operation. They would have to start once if not twice per day and would therefore require a rapid-start capability. Many of these early plants had been created by repowering small steam turbines. As more combined-cycle capacity has been introduced, so there has appeared a gradation of performance based on the type of the gas turbine and the steam cycle that could be supported on its exhaust conditions. The first plants had relatively small gas turbines and a single-pressure steam cycle. The second combined cycle to be built at Angleur, Belgium, which first went into operation in 1978, started life as a base-load unit but in nearly 30 years, as more efficient combined cycles have come into service, it has gradually declined until today it runs for about 2000 h/year, which on average is still more than 5 h/day. Belgium is an interesting country with seven nuclear reactors generating over 50% of the total electricity supply and supported by a number of combined cycles built at different times and with different steam cycles. Indeed the nuclear and gas-
WPNL2204
92
Generating power at high efficiency
5.2 Brugg Herdersbrug, Belgium: a typical example of a combined cycle with E-class gas turbines in a 2 + 2 + 1 arrangement, with a twopressure steam cycle and air condenser.
fired plants provide most of the electricity supply backed up with entitlements to the output of jointly owned nuclear and combined-cycle plants on the French frontier and the Coo-Trois-Ponts pumped storage scheme in the Ardennes region. After the completion of the second plant at Angleur a number of industrial combined heat and power schemes were built, but the next combined cycles were three similar 450 MW blocks based on the Siemens Model V94.2 in a 2+2+1 arrangement with a two-pressure steam cycle; efficiency was about 52%. The first two plants in service were Drogenbos, alongside the original repowered set from 1976, in the southern suburbs of Brussels, and Seraing, some 20 km west of Liège in the Meuse valley; both went into operation in the summer of 1993. The third plant, Brugg Herdersbrug, went into service in February 1998 (Fig. 5.2). Before this last plant came into service the first F-class combined cycle was installed at Gent Ringvaart as a GE Frame 9FA in a single-shaft block rated at 380 MW. The steam cycle here is a three-pressure system with reheat and the base-load efficiency is 57%. For the first 2 years it ran in a base-load regime and then moved to a mid-load regime, dropping to 50% load on weekday nights with a 36 h shutdown at weekends. Effectively in Belgium there are three generations of combined cycles operating in a merit order in support of a large nuclear base-load capacity. All the combined cycles have vertical heat recovery boilers and all are operating in load-following mode up to 6000 h with around 150 starts/year. The oldest plants still work on strategic reserve, which means that they must be able to start quickly to respond to a sudden increase in demand, e.g. a television peak.
WPNL2204
Steam generator concepts
93
Studies carried out on the later plants during the 10 years that they have been operating have shown that there is no problem with the boilers and that, if there is a weak point in the system, calculations have shown it to be the pipe from the superheater outlet to the steam turbine. This is a remarkable testimony to the vertical boiler in peaking operation, and all it shows is that, if the steam pipe will show fatigue, it will do so before the boiler does. Furthermore, with a daily start regime, the gas turbine is adding equivalent operating hours, which in turn shortens the maintenance intervals. However, there are in Belgium a number of combined cycles of different ages which are running in cyclic mode with various numbers of starts per year and no discernible problem of fatigue failures in welds to drums or headers in their heat recovery boilers. The thermal design of the heat recovery boiler aims to remove as much of the exhaust energy of the gas turbine as possible. It depends on the mass flow and temperature of the exhaust gases which determine how many pressures can be used and what will be the temperature at the top of the stack. Thermal inertia is defined as resistance to application of heat. The contents of a tube with narrow wall thickness will heat up more quickly than in a tube with thicker walls, and therein is the difference between the horizontal natural-circulation and the vertical assisted-circulation designs. For the first combined cycles, single-pressure boilers were used with an outlet pressure of around 30 bar. The E-class gas turbines which started to appear in about 1975 operated with higher exhaust temperatures over 500 °C but, with more gas at higher temperature, a greater surface area would be required for heat transfer. The critical boiler parameter is the pinch point, which is the local temperature difference between the saturated steam in the evaporator and the cooled gas leaving it. Reducing the pinch temperature means that more heat must be taken from the gas flow, which means a higher surface area in the evaporator. This can only be taken so far before it becomes uneconomical to manufacture and assemble. To overcome this limitation and to produce more steam, a second pressure level was introduced for the larger gas turbines in combined cycles as distinct from repowering schemes when the original steam conditions determined the boiler output. In a purpose-built combined cycle, using a second lower pressure allows more steam production from two small evaporators rather than from one very large evaporator (Fig. 5.3). This requires a change in the design of the steam turbine, to introduce a lowpressure steam input. This is usually placed at the cross-over from the high-pressure to the low-pressure cylinder. The turbine is then said to be operating in slidingpressure mode with the low-pressure input following the changes in the high-pressure output as the load varies. The first two-pressure combined cycles were supplied by Brown Boveri at Korneuburg, Austria, and at Donge, The Netherlands, in about 1980 with the type GT13D gas turbine, then at a rating of 81 MW. The high pressure was 33 bar and the low pressure 4 bar.
WPNL2204
94
Generating power at high efficiency
5.3 A simplified heat balance diagram from GTPro for a two-pressure steam cycle with a GE Frame 6FA in a single-shaft block. (Picture courtesy of Thermoflow Inc.)
Then 4 years later with the gas turbine uprated to 97 MW the company received the first of two contracts from the Turkish utility TEK at Hamitabad about 100 km north of Istanbul. With the greater gas turbine power and 510 °C exhaust temperature the high-pressure output was at 52 bar at 480 °C with a low pressure of 5.2 bar at 200 °C. Further development saw high pressures at about 90 bar with some of the larger E-class gas turbines having exhaust gas temperatures up to 550 °C. Introduction of the F-class gas turbines with exhaust temperatures of around 600 °C introduced the possibility of a three-pressure steam cycle with reheat. Again the largest output is the high pressure with steam pressures now at 110–125 bar. With this the intermediate pressure is set at the same value as that of the returning cold flow to the reheater. With a hotter exhaust, and therefore higher operating temperatures, the steam cycle has become more complex. With a higher compression ratio this means that the air entering the combustor could be hotter than the gas flow; so, if a part of the intermediate-pressure steam production is taken to a fuel gas preheater and thence to the condenser, the fuel gas is heated and therefore less is required to heat the air to its final temperature going into the power turbine. For this the intermediate pressure at least has to be used because, at typically about 30 bar in a three-pressure steam cycle, it is higher than the gas pressure in the combustor. This is for safety
WPNL2204
Steam generator concepts
95
reasons since it ensures that, in the event of a leakage, moisture would enter the combustor and not gas into the steam path. The other energy trade is in the air bled from the compressor for blade cooling. If because of the high-pressure ratio it is too hot, then its temperature must be reduced for effective cooling in the turbine inlet blades and vanes. The Alstom GT24 and GT26 with 32:1 pressure have once-through coolers for the bled air which on the steam side are coupled in parallel with the high-pressure superheater. Heat recovery in particular now with the single-shaft blocks contributes to their higher efficiency. The other cooling measure is the steam cooling of certain gas turbine models. This is due to the higher firing temperatures and to the need for more air dilution for emissions control in a can–annular combustion system. Here the gas turbine cooling stream is an intermediate-pressure flow ultimately feeding the recovered energy into the reheater. These flows are irrelevant to the layout of the boiler either horizontal or vertical, but the speed of start-up is very much dependent on the design of the boiler and has revealed specific problems now that high-pressure outputs are over 120 bar. This is particularly true of the large horizontal natural-circulation boilers with the largest gas turbines. The horizontal heat recovery boiler was developed in the USA and has been adopted by all the major boiler companies there. The argument was that it could be built in easily transportable factory assemblies which on arrival at site could be stood on end and bolted together. The drums would be mounted on top of the structure. Furthermore, with the strict emissions policies in some states it would be easy to place a selective catalytic reduction unit at the appropriate position in the line of tube modules. The gas flow is horizontal but the exhaust gas has to fan out from the diameter of the gas turbine exhaust to the tall rectangular cross-section of the boiler. In a combined heat and power unit this transition duct can also house burners for supplementary firing, which can lead to considerable turbulence unless baffle plates are strategically placed to even out the flow in the duct connecting the gas turbine to the boiler inlet and the first tubes which carry the superheater outlet. Within the boiler the heat transfer tubes hang vertically from the drum and other headers in a structure known as a harp. Water circulation to and from the drum depends on the fact that there is a temperature gradient between the downcomer and riser. The riser is the first tube row of the evaporator met by the incoming gas and the downcomer is the second row which is colder; so the denser water pushes the evaporating water up to the drum where separated steam is passed to the inlet header of the superheater, and the process is repeated in the superheater with steam at the design pressure going from the outlet header to the steam turbine (Fig. 5.4). It all sounds elegantly simple and the horizontal boiler really became successful in the 1980s with the PURPA legislation which promoted combined heat and power as a way of improving energy efficiency. These issues apart, one of the
WPNL2204
96
Generating power at high efficiency
5.4 Vilvoorde, Belgium: a plant with a high-pressure–low-pressure preheater module assembly with the first of three low-pressure economiser–evaporator sections in place. It is a repowering scheme with a Siemens SGT5-4000F gas turbine.
reasons why the horizontal design has succeeded was undoubtedly the small size of the 60 Hz gas turbine models. A typical boiler with one or two output pressures would be a series of single modules, behind a gas turbine of less than 100 MW capacity. Until the 150 MW Frame 7F was announced in 1988, the largest gas turbine produced in the USA for 60 Hz networks was the 105 MW Westinghouse W501D, but the majority of gas turbines at the time were rated 80 MW or less and many installations were with smaller gas turbines of 25–40 MW and supplying process pressures of 40 bar and less. Furthermore these installations were tied to processs industries with long operating runs and were required to shut down only twice or three times per year. As gas turbines became larger and with rising steam pressures, the first changes appeared in the design of the boiler. Not only was the cross-section increased to accommodate the larger gas flow, but so also were the tube dimensions. Any device hanging vertically is carrying its own weight; so tubes in the horizontal boiler have alway been marginally thicker to acommodate this. However, a higher pressure means even thicker tubes, which in turn means a lower rate of conductivity of heat. Therefore the rate of evaporation is reduced and the boiler takes longer to heat up to its full steam temperature. The advantages of the horizontal design held for the small gas turbines of the PURPA industrial combined heat and power schemes and throughout the USA market 20 years ago but, as soon as the F-class gas turbines arrived, the dimensions of the gas path increased, and it was recognized that the fully assembled heat transfer module to go behind a 150 MW gas turbine would be too large for road or rail transport.
WPNL2204
Steam generator concepts
97
Two smaller parallel modules would have to be fabricated, shipped separately and welded together at site. The completed modules are then assembled in line and scaffolding erected to enable the drums to be fitted and the connections made to them, with a large number of welds performed some 20 m, or more, above ground. These problems are not so acute with the vertical-boiler types because, although thicker tubes must be used at higher pressures, they do not support their own weight, but are threaded through vertical tube plates which are incorporated in the modules and hang from the top of the boiler frame. Parallel modules must still be installed with the larger gas turbines, but their assembly can be performed at ground level before the completed section is lifted into position. The erection of the vertical heat recovery boiler is now less complicated with the larger gas turbines and it has a number of advantages in service. First a frame is erected and a series of jacks are mounted on the top of it. Structurally the frame is stabilised by floor beams at three or four levels and with stairways linking them, and these floors will become the maintenance galleries in the operating boiler. The drums are also mounted on top of the frame, since with natural circulation this arrangement creates the largest static head for the evaporators. The inclusion in the first boilers of assisted-circulation pumps in the evaporator not only directed the flow around it and prevented steaming in the economiser but also speeded up the flow as compared with a natural-circulation system which depended on a temperature difference to establish it. Consequently in a vertical boiler the combination of forced flow through thin-walled tubes means that it had a lower thermal inertia than a horizontal unit and could start up much more quickly: within an hour from a warm start, as would be the case after a weekend shutdown. One of the largest contracts to be awarded for vertical heat recovery boilers was awarded in April 1996 to CMI, by Saudi Consolidated Electric Company (Central Region). This was for 16 units for Riyadh Power Plant 9, to be installed in four 320 MW blocks each having four GE Frame 7EA gas turbines site rated at 56 MW and a 100 MW steam turbine. In fact, it was quite a simple steam cycle with a single live pressure output and a low-pressure section supplying steam to a common deaerator in order to achieve a high inlet temperature to the economisers. The challenge of this contract was the number of units, with the first block to be ready by December 1997 and the other blocks following at intervals of 12 months. In effect the contract required four boilers to be installed in each of four consecutive years. Looking at the boiler design it was possible to divide it into three sections: lowpressure preheater; high-pressure economiser and evaporator; high-pressure superheater. Dividing the boiler in this way, the tubes of each section could be assembled in an insulated box frame in the factory in Belgium and welded to their headers to form a module. Low-temperature modules had internal insulation but the highpressure superheater had external insulation which still had to be fitted on site. The modules were designed so that the sides could interlock with the unit above and
WPNL2204
98
Generating power at high efficiency
below to form a continuous gas duct. Each module was completely assembled and inspected under factory conditions before shipment. The boilers at Riyadh were relatively small. For a 250 MW gas turbine with a three-pressure reheat steam cycle the modules would be assembled as two or three parallel sections for ease of transport and joined together on site, but the benefits of modular construction were the same; better quality control through complete factory assembly; ease of erection on site. The tube bundles are made up from a series of parallel serpentine paths between two headers. The path is built up by welding end pieces between adjacent tubes, so that in a matrix of 100 tubes there will be ten parallel paths each made up from ten tubes one above the other, with nine end pieces joining each to the tube above it, and with the free ends of the top and bottom tubes welded to a header. The advantage of this construction with a large gas turbine is that it is now much easier to erect than a horizontal type. The individual modules are wheeled under the boiler frame and, where there are two or three parallel modules, there is one large weld at each end between straight tubes to join the headers before they can be lifted as one. On a large boiler with three parallel tube modules there would be about 100 large-diameter welds to be completed on site to join the modules and to link them to drums, feed pumps, output headers and blowdown tank, and all accessible from the boiler frame. No scaffolding is needed to access welds on the top of the unit and the complete boiler for a 280 MW gas turbine can be erected in less than a month. The accessibility of the vertical boiler means that it can be repaired easily. When a weld fails or a tube cracks, it can be located, the tube replaced and new end pieces welded to restore the path. The pressure tubes are supported horizontally in tube plates hanging in the frame and they are reachable from the maintenance galleries. Damaged sections of tube can be withdrawn simply by cutting out the end pieces and pulling it out with a crane. By being able to repair accessible sections of tube in this way the full heat transfer capability of the bundle can be restored. Welding can be performed acurately from a stable position on the maintenance gallery. In any case, if there is any stress cracking, it is more likely to be in the curved end pieces and the connections to the module headers. With the largest gas turbines there might be two or even three parallel stacks for which the headers have to be welded together before the row is lifted. On a greenfield site there could be only two parallel stacks whereas on an existing site where there may be space restrictions the gas path has the same area but it might be in a more square format and so has three shorter parallel stacks although in each case the overall cross-sectional area of the vertical gas path would be the same. Once the heat transfer tube modules have been erected, there are generally only a small number of welds required to connect the module headers to drums, steam turbines and feed pumps. Much of this work can be carried out from the floors built into the frame so that there is no requirement to erect scaffolding to perform welding above ground.
WPNL2204
Steam generator concepts
99
The modern vertical boiler with prefabricated factory-assembled heat exchange modules and minimal on-site welding can be erected quickly and to an extent tailored to the dimensions of the site. It has lost none of the flexibility that was inherent in the original single-pressure designs of the early 1980s. What has differed is the customer. The first vertical boilers were built for utility customers who would be operating the power plant for the whole of its life. They knew that the technology would be overtaken by later additions to the network and wanted flexibility of operation to be built in. These boilers were designed for assisted circulation with two small circulating pumps of a few kilowatts each of which one is always running and the other is on standby. These were usually mounted on the ground and these boilers were characterised by the large expansion loops in the connecting pipes to and from the evaporators. In the modern high-pressure designs the pump is suspended from the pipes and driven by a fixed electric motor through a cardan shaft to accommodate movement of the pump for pipe expansion. With the arrival of larger gas turbines and higher steam pressures, natural circulation has become possible in a vertical boiler. The first vertical naturalcirculation boiler was developed by AEE in 1987 and installed at the Leopoldau district heating plant in Vienna. It works in the same way as the horizontal design except that the hot gas is rising and the circulating water is falling from the drum on to the boiler frame into a higher-temperature region until it comes to the bottom header which turns it back up to the drum. Vertical natural-circulation boilers are now firmly established in the combinedcycle market, but in one respect they share a problem with horizontal boilers as pressures increase. The rate of heating with thicker tubes is decreased but not so seriously. Gravity is supporting the circulation (Fig. 5.5). On the other hand, the return to assisted circulation would reduce the water volume in the boiler and further increase the rate of heating. There is clearly still a demand for vertical boilers with either natural or assisted circulation. The question has to be asked as to whether opinion is moving back towards the vertical system. First is the fact that the combined cycles built 10–20 years ago with vertical assisted-circulation boilers are still operating as mid-load plants with up to 150 starts/year or more, and some of the oldest units are retained as strategic reserve. There have been no instances of fatigue failure in any of the boilers. Further, there is an advantage for the vertical boiler in mid-load operation. The starting sequence of any gas-fired combined cycle begins with the gas turbine being turned, unfired, on the starter to blow cold air through the system and to purge it. The plant is on a daily load cycle so that the cold air blows on tubes containing steam which has been cooling gradually since the shutdown on the previous evening, some of which condenses in the superheater and has to be drained into a blowdown tank.
WPNL2204
100
Generating power at high efficiency
5.5 Schematic diagram of a vertical natural-circulation boiler showing the position of the blowdown tank which can be drained by gravity.
In a large vertical boiler the high-pressure superheater at the bottom of the heat transfer stack is at least 8 m off the ground, leaving ample room underneath it for the blowdown tank which, being above ground, can be easily drained and there is never any risk that this purge condensate floods back into the superheater. In a horizontal boiler the tubes are vertical and the bottom headers are close to the ground. The only place for a blowdown tank to receive this condensate is below the bottom headers so that they drain naturally into it. This means digging a pit under the evaporator section to hold the tank, which then itself has to be emptied if the purge condensate is not to flood back into the headers. The water can only be pumped out, which is an engineered solution with a specific maintenance burden. However, whether it has a vertical or a horizontal boiler the combined cycle must be designed to function over its entire service live with the same reliability and availability. Also, the type of boiler that will be required for the even more powerful gas turbines which are on the brink of application must be considered. Already greater flexibility of design is being sought with the problem of fatigue cracking that has been observed on some boilers designed for base load which are attempting load following in a merchant environment. Some engineered solutions are possible to reduce this since it stems from thermal shock with frequent restarts. To be able to run a combined cycle with a high-pressure boiler in a mid-load duty requires an auxiliary boiler to keep the steam turbine casings, drums and connecting pipework warm overnight. As the gas turbines start up, they start to generate steam which is fed through pipes to the turbine, all of which have been held closer to the operating temperature with the turbine slowly rotating on its turning gear. Effectively, the steam turbine can work more quickly, but the high pressure still means slower heating of the boiler on gas turbine exhaust to avoid overstressing it. A unit designed for base-load duty with perhaps no more than 3 starts/year is trying
WPNL2204
Steam generator concepts
101
to fit into an operating regime with 150 starts/year or more. Further improvements could be made to the gas turbine control system to allow it to load more quickly. Without these measures a hot start for a large combined cycle with horizontal boilers with a high-pressure output of 120 bar or more could be at least 3 h. These are engineered systems for existing power plants. For new plants the Benson boiler is now widely available and the first units are being installed with combined cycles in Europe and Japan. Of the new gas turbines, the new Siemens 330 MW SGT5-8000H which was announced in September 2005 has been specifically designed for fast start-up with air rather than with steam cooling and is to be offered only in combined cycle with a Benson boiler operating at 160 bar. The Benson heat recovery boiler is the first major new development in the steam cycle since the first combined cycles appeared more than 40 years ago. It is a highpressure once-through design, that has no drum and thus has a much lower thermal inertia, which makes it ideal for plants operating in mid-load duty with 1 or 2 starts/ day. Siemens have had a boiler research facility since they first took a licence from Mark Benson in 1924. As a builder of generators and steam turbines, the company had ideas of adding boilers to their production so that they would be able to design and build the complete power station. Benson was a German engineer who had emigrated to the USA before the First World War. He became concerned about the problems of the early boilers which had drums made from riveted plates, and which were frequently exploding with often disastrous consequences. His idea was to discard the drum and to have a continuous tube for the economiser and evaporator which would be filled with water when cold, and heated at supercritical pressure so that dry steam would be produced at the outlet of a valve at the far end. Having failed to get an American patent, Benson applied for a patent in Germany, which was awarded in 1922. Then, 2 years later, Siemens acquired the patent rights.They built their first boiler with an output of 30 t/h in 1926 for the Berlin Gartenfeld power station, but they only built three Benson boilers before they decided, in 1933, to license the design to boiler firms in Europe and North America. They continued research to support the industry and retained the name Benson as a trademark. All Benson boilers are once-through boilers, but not all once-through boilers are Benson boilers. These boilers became fully recognized with the introduction of high-pressure subcritical steam cycles with reheat in the 1950s. A power plant designed for base-load duty would have a drum-type boiler and perhaps shut down once a year for planned maintenance. A plant designed for mid-load duty with daily or weekly start-and-stop operation would have a once-through boiler. Already there are a number of combined cycles operating with once-through boilers at a high-pressure output of 160 bar. The standard boiler for the Alstom GT24