THE GAMES OF THE XVII OLYMPIAD ROME 1960
The Official Report of the Organizing Committee
Copyright — 1960 by the Orga...
19 downloads
5853 Views
24MB Size
Report
This content was uploaded by our users and we assume good faith they have the permission to share this book. If you own the copyright to this book and it is wrongfully on our website, we offer a simple DMCA procedure to remove your content from our site. Start by pressing the button below!
Report copyright / DMCA form
THE GAMES OF THE XVII OLYMPIAD ROME 1960
The Official Report of the Organizing Committee
Copyright — 1960 by the Organizing Committee of the Games of the XVII Olympiad
THE OFFICIAL REPORT EDITED BY THE ORGANIZING COMMITTEE FOR THE GAMES OF THE XVII OLYMPIAD AND PRINTED BY THE COLOMBO PRINTING ESTABLISHMENT AND THE ROTOGRAFICA ROMANA. IT WAS PREPARED BY ROMOLO GIACOMINI, UNDER THE DIRECTION OF MARCELLO GARRONI, TOGETHER WITH THE COLLABORATION OF ENRICO VIGNOLINI AND ARTISTIC ADVICE BY ELENA BAGGIO. ENGLISH TRANSLATION BY EDWIN BYATT.
NEWS AND TECHNICAL DATA WAS SUPPLIED BY THE HEADS OF SECTIONS OF THE ORGANIZATION AND BY VARIOUS INSTITUTIONS WHICH GRACIOUSLY CO-OPERATED WITH IT DURING THE QUADRIENNIAL PREPARATION OF THE GAMES OF THE XVII OLYMPIAD.
THE SIX AGENCIES FORMING THE OLYMPIA PHOTOGRAPHIC POOL AND THE PHOTOGRAPHERS ANGELO GOZZI, MARIO DE BIASI AND SERGIO DEL GRANDE OF EPOCA MAGAZINE KINDLY OFFERED PART OF THE PHOTOGRAPHIC MATERIAL.
THE GAMES OF THE XVII OLYMPIAD ROME 1960
VOLUME
ONE
PREFACE Well aware of the responsibilities imposed by a work of extreme accuracy such as the preparation of the Official Report, and in an effort to attain a clear, comprehensive, and precise documentation, we have not failed to refer to all possible sources of technical and statistical information. The overall pattern of the Games of the XVII Olympiad, as described in the various reports and commentaries, will be shown by the collection of data and details, figures and graphs which record and analyse works and results and will serve to give us an unforgetable memory of the protagonists as well as to provide evidence of the efforts undertaken in organizing the Rome Olympic Games. This documentation attempts to illustrate events and general aspects of the work undertaken during the four-year period of preparation. In this way, the description of the organization in all its technical and human aspects, offers a clear and comprehensive picture of the ability of the organizers and shows, once more, that sport has now reached the extreme limits of human achievement. It must be remembered that one of the aims of the Official Report is that of re-evoking the epic atmosphere of the Games in all their spectacular grandeur; it is also intended to recall the keen competitive spirit among countless protagonists who have now become historic figures in the life of the Olympiads. It is no easy task to indicate the amount of patient work and alternating hopes that the solution of the thousand and one problems in connection with so vast an undertaking cost the organizers, a task which was not only of a technical and organizational nature. However, with an ever-present consciousness of the responsibilities assumed, we have attempted to complete a work which justifies the effort of the organizers. It is under this aspect, therefore, that we have faithfully reproduced data, documents, and the experiences lived by all in all fields. It is here that our completed work is produced in a condensed form and the material we have collected, selected, and checked is registered with the comforting support of figures. 7
The Report consists of two volumes: the first contains a documentation of the organizational sector whilst the second contains the results of the competitions. The photographic documentation, carefully, and appropriately selected illustrates facts and protagonists in picturesque and realistic form such as an historical work of this nature calls for. The compiling of the two volumes required twenty-four months of patient work. Should there be cause anywhere for complaint, it should be pointed out that data in respect of the athletes from the eighty-four countries did not always reach the Organization in a clear manner both as regards writing as well as to correctness of information. We are, however, comforted by the certainty that this work will render good service in the spreading of the Olympic ideal and to those who are now endeavouring to face the difficult task of organizing the Olympic Games to come.
THE EDITING COMMITTEE
8
SUMMARY 7
PREFACE
9
SUMMARY
13
INTERNATIONAL OLYMPIC COMMITTEE
17
ORGANIZING COMMITTEE
23
THE ACCOMPLISHMENT OF THE TASK
28 30 32 37 42 43 48
Organizational problems Expense budgets Allotment of tasks Artistic programme Nomination of Organizing Committee City problems The organization effort THE OLYMPIC VENUES Overall organization of the work Tenders for the work The Olympic stadium The Flaminio stadium The Palazzetto dello Sport The Swimming stadium The Stadio dei Marmi The Acqua Acetosa sports zone The Shooting ranges The E. U. R. Olympic centre The Palazzo dello Sport The Olympic Velodrome The Piscina delle Rose The Tre Fontane sports zone The Basilica of Maxentius and Caracalla Baths The route of the Marathon Venues for the Equestrian Sports Lake Albano for the Rowing events Routes of the Cycling events The subsidiary venues Stadia for the Football tournament Works in the Bay of Naples Indicator boards The Olympic Village
51 54 55 56 58 60 62 64
65 66 67 68 72
75 76 76 80 81 82 84 84 85 86 86 89
MANAGEMENT OF OLYMPIC VENUES 100 Maintenance of the venues 105 Sports equipment 95
125
TECHNICAL SERVICES
134 136 137
The Sports Programme The « minimum » standards table The technical regulations
9
144 158 163 164 164 168 169 171 174 183 191 193
The entry forms Competition officials Accompanying officials The training of horses for the Modern Pentathlon Training grounds and their allocation The Mechanographic centre Flag assembly centre Timekeeping service The registration of times The Yachting regattas The Naval Command of Naples Gauging operations
195
THE JOURNEY OF THE OLYMPIC TORCH
199 201 204 205 206 208 212
The choice of the course Reconnaissance of the course The new model of the torch The itineraries From Olympia to Rome On board the « Vespucci » Torchbearers in the relay of the Olympic torch
223
THE OLYMPIC VILLAGE
236 237 242 246 251 267 272 273 275 277 285 287 293 294
The preparation of lodgings The feeding of the guests Reception centre The Information office Lodging sector The assignment of duties The provisioning sector The menu list The restaurant services 45,495 work days Items consumed in the restaurants Hygienic and sanitary precautions Services sector Administration Displacements
297
ART AND HISTORICAL SPORTS EVENTS
299 300 304 306 308 310 313 315 316 322 325
Competition for the poster 212 competitors and 249 designs The Olympic Hymn The medals for winners Historical sports events The exhibition of sports photography Sport in History and Art The plan of the exhibition Arrangement of the works Fete at the Pincio Original works displayed in the exhibition
337
THE PRESS SERVICES
341 343 345 354 355
The official bulletin A committee of experts The diffusion of the poster Course for announcers Olympic press cards
256
10
356 Solutions to the benefit of the press 359 The operations for accreditation 364 The Press Centre and News Centre 370 The problems in connection with information 372 Accommodation assistance 373 The photographic pool 378 Daily programmes 380 The Press Service for Yachting 382 Radio and Television 384 The problem of links 387 The Television service 390 The technical apparatus 391 The production of filmed services 395 93 hours and 40 minutes of transmission 398 Television transmissions 400 Special transmissions 405
TRAFFIC TRANSPORT AND PARKING
408 409 410 412 414 416 420 422
Olympic traffic The routes chosen Regular lines Main links Special number-plates and discs Olympic parking Category badges Insurance and accidents
425
SECRETARIAT AND GENERAL AFFAIRS
428 433 438 439 441 445
Relations with the I. O. C. Decorative improvements to Rome The accredited tourist agencies Special provisions for athletes Badges and uniforms The Insurance policy The Olympic Identity Card Customs formalities problems The Philatelists Assistance office The "First Day of Issue" Religious assistance The Papal audiences
450 451 454 456 464 465
473 ADMINISTRATION 476 Supervisory office 480 Personnel office 483 Demobilization of personnel 484 Banking and Treasury services 486 Liaison abroad 491 Special current account cheques 495 The mobile agency 497 499 502 503 508 510 511 513 516
TICKETS AND CONTROL MEASURES The technical section The commercial section The distribution section Distribution and booking of tickets Sales abroad Sales in Italy Control service The tickets sold
11
543
PROTOCOL AND CEREMONIAL
547 548 550 552 553 557 559 560 562 563 565 568
Official invitations Reception and Departure offices Ceremonial at the Olympic Village Precedencies and protocol The 57th Session of the I. O. C. The International Congresses Opening and Closing of the Games The bands The release of pigeons Ceremonies and prizegivings The official receptions Diplomas
569
THE CONTRIBUTION OF THE ARMED FORCES
Staff establishment 577 The executive phases 580 In the information field 584 Services rendered in competition arenas
574
585
POSTS AND TELECOMMUNICATIONS
590 591 601 603 604
The telegraph services The telephone services Services in concession The Italcable installations The Radiostampa service
607
OLYMPIC TOURISM AND RECEPTION CAPACITY IN ROME
The appeal by the Mayor The control of prices Accommodation in institutes The methods for reservation 615 Relations with Officially Accredited Agencies 616 Statistical results
610 611 612 613
621
MEDICAL AND HYGIENE SERVICES
Scientific research Medical assistance First aid 635 Specialist services 637 The health hygiene problem 639 Medical and Surgical intervention
627 630 632
647
THE OLYMPIC FILM
650 Synopsis and script 652 Night shooting 656 80,000 metres of film 657 Musical scoring
12
659
DONATIONS AND FACILITIES
665
THE ACCREDITED JOURNALISTS
681
LIST OF ATHLETES
INTERNATIONAL OLYMPIC COMMITTEE Founder BARON PIERRE DE COUBERTIN
PRESIDENT Mr. Avery Brundage (U.S.A.)
VICE-PRESIDENTS The Marquess of Exeter, K.C.M.G.
Mr. Armand Massard
EXECUTIVE BOARD Sir Arthur Porritt (Great Britain) Mr. Bo Ekelund (Sweden) Dr. Karl Ritter von Halt (Germany) H.E. Mohammed Taher, Member Assistant to President
Mr. Avery Brundage (U.S.A.) Mr. Armand Massard (France) The Marquess of Exeter (Great Britain) Count Paolo Thaon di Revel (Italy) Gen. Col. Vladimir Stoïtchev (Bulgaria)
MEMBERS Mr. Mario L. Negri Mr. Hugh Weir Mr. Lewis Luxton Dr. h.c. Manfred Mautner Hitter von Markhof Austria H.R.H. Prince Albert of Liege Belgium Mr. Arnaldo Guinle Brazil Dr. J. Ferreira Santos Gen. Col. Vladimir Stoïtchev Bulgaria Mr. A. Sidney Dawes Canada Dr. Alejandro Rivera Bascur Chile Mr. Julio Gerlein Comelin Colombia Dr. Miguel A. Moenck Cuba Czechoslovakia Prof. Dr. Joseph G. A. Gruss Mr. Ivar Emil Vind Denmark Mr. J. W. Rangell Finland Mr. Eric von Frenckell France Mr. François Piétri Mr. Armand Massard Count de Beaumont Germany Dr. Karl Ritter von Halt Mr. Willi Daume Great Britain The Marquess of Exeter, K.C.M.G. Sir Arthur Porritt Lord Luke Mr. Angelo Bolanaki Greece Mr. Jean Ketseas Gen. C. F. Pahud de Mortanges Holland Dr. Ferenc Mezö Hungary Iceland Mr. Benedikt-G. Waage Mr G D Sondhi India Maj. Raja Bhalindra Singh Iran H.I.H. Prince Gholam Reza Pahlavi Lord Killanin Ireland Count Paolo Thaon di Revel Italy Dr. Giorgio de Stefani Argentine Australia
Japan Kenya Lebanon Liechtenstein Luxembourg Mexico Monaco Norway Pakistan Panama Peru Poland Portugal Philippines Rumania Spain South Africa Sweden Switzerland Turkey U.A.R. U.S.A. U.S.S.R. Venezuela Yugoslavia
Dr. Sh. Takaishi Dr. Ryotaro Azuma Mr. Reginald Stanley Alexander Sheikh Gabriel Gemayel H.H. Prince François-Joseph of Liechtenstein H.R.H. Prince Jean of Luxembourg Mr. Marte R. Gomez General José de J. Clark F. H.S.H. Prince Pierre of Monaco Mr. O. Ditlev-Simonsen Jr. Mr. Syed Wajid Ali Dr. Agustin Sosa Mr. Eduardo Dibos Prof Dr. Jerzy Loth Mr. Saul Cristovao Ferreira Pires Hon. Jorge B. Vargas Mr. Alexandru Siperco Baron de Güell Mr. Reginald Honey Mr. Bo Ekelund General Gustav Dyrssen Major Albert Mayer Mr. Suat Erler Mr. A. D. Touny Mr. Avery Brundage Mr. John Jewett Garland Mr. Douglas F. Roby Mr. Mr. Dr. Mr.
Constantin Andrianow Aleksi Romanov Julio Bustamente B. Boris Bakrac
–– H. E. Mohammed Taher
CHANCELLOR Mr. Otto Mayer
13
The President of the Italian Republic, the Hon. Giovanni Gronchi Patron of the Games of the XVII Olympiad
Avery
Brundage President of the International Olympic Committee
ORGANISING COMMITTEE ON AUGUST 1st 1960
PATRON
PRESIDENT
ORGANISING COMMITTEE
PROVINCIAL TOURIST BOARD
ROME MUNICIPALITY
PRESIDENT
EXECUTIVE COMMITTEE
OLYMPIC MILITARY DETACHMENT
SECRETARY GENERAL
Tommaso Calise
TECHNICAL DIRECTOR
Mario Saini
O. C.
V. M.
SEC. 1
SEC. 2
SEC. 3
DUTIES
OLYMPIC CONSTRUCTIONS Luciano Berti
SECTION
1
AND
SECTION
SEC.
HEADS 2
SEC. 7
6
OF
SEC. 8
SEC.
SEC.
9
10
SECTIONS
SECTION
3
SECTION
4
SECTION
5
TECHNICAL
OLYMPIC TORCH
OLYMPIC VILLAGE
ART
PRESS SERVICES
Virgilio Tommasi
Alfredo Langellotti
Giuseppe Fabre
Roberto Vighi
G. Sabelli - Fioretti
SECTION
6
OLYMPIC VENUES MANAGEMENT
TRANSPORT
Giovanni Poli
Sergio Taviani
2.
SEC. 5
SEC. 4
SECTION
7
SECTION
8
SECTION
9
SECTION
10
SECRETARIAT
ADMINISTRATION
TICKETS AND CONTROL
CEREMONIAL
Gino Del Neri
Tommaso Folinea
Carlo della Vida
Luigi Magliari
GAMES OF THE XVII OLYMPIAD - ROME 1960 PATRON
THE HON. GIOVANNI GRONCHI – PRESIDENT OF THE ITALIAN REPUBLIC
* * * MINISTERS FOR PUBLIC WORKS
MINISTERS FOR TOURISM & ENTERTAINMENT
The Hon. Giuseppe Togni The Hon. Benigno Zaccagnini
Sen. Umberto Tupini The Hon. Alberto Folchi
* * * ORGANISING COMMITTEE PRESIDENT The Hon. Giulio Andreotti VICE - PRESIDENTS Avv. Urbano Cioccetti — Avv. Giulio Onesti — Count Paolo Thaon di Revel MEMBERS Dott. Umberto Agnelli Rag. Emanuele Bianchi Dott. Alfredo Boccalatte Comm. Leone Boccali Marquess Antonio Brivio Sforza Dott. Giuseppe Bruno Dott. Alfredo Correra Dott. Marcello Costa Dott. Beppe Croce Dott. Guglielmo De Angelis D' Ossat Dott. Alighiero De Micheli Dott. Giorgio de Stefani Count Francesco di Campello Count Lando Ferretti di Val d'Era Gen. Francesco Formigli Marquess Cristoforo Fracassi di Torre Rossano Dott. Marcello Garroni Gen. Giovanni Gatta Prof. Luigi Gedda
Comm. Guido Ginanni Gen. Antonio Gualano Dott. Antonio Le Pera Dott. Alberto Liuti Comm.Aldo Mairano Count Ermelino Matarazzo di Licosa Ing. Renzo Nostini Rag. Piero Oneglio Ing. Vincenzo Percuoco Ing. Enrico Reggiani Prof. Luigi Rio Comm. Adriano Rodoni Dott. Mario Saini Prof. Decio Scuri Gen. Gaetano Simoni Marquess Raffaele Travaglini del Vergante di S. Rita Dott. Giovanni Valente Dott. Bruno Zauli
EXECUTIVE COMMITTEE Avv. Giulio Onesti (President) — Dott. Bruno Zauli (Vice-President) — Dott. Francesco Costantino — Dott. Marcello Garroni (Secretary-General) — Avv. Nicola Graziano — Dott. Mario Saini (Technical Director) — Rag. Virgilio Tommasi
18
The Hon. GIUSEPPE TOGNI Minister for Public Works during the preparation of the Rome Games
Sen. UMBERTO TUPINI Minister for Tourism & Entertainment during the preparation of the Rome Games
The Hon. BENIGNO ZACCAGNINI Minister for Public Works
The Hon. ALBERTO FOLCHI Minister for Tourism & Entertainment
19
I
t gives me great pleasure to present the Official Report of the Games of the XVII Olympiad which not only summarises and relates the various stages of the complex work of organisation, but also strives to make a worthy contribution to that message of friendship and peace which the Rome Olympic Games represented. This Report was realised by an editing committee which did all in its power to seek out all the official sources before incorporating them into the text in its organic form. It seems to me personally the most difficult task was that of selecting and checking the enormous quantity of available material; whilst the selection of those aspects considered to be the most significant from the copious documentation available constituted another difficult task. Nevertheless, the editing staff has succeeded in admirably portraying the successive general phases of the period of preparation for the Games and the organising effort of the Italian National Olympic Committee. By this last official act, the Organising Committee of the Rome Games has set a final seal on all relations with the C. O. N. I. which, for the complex organisation of the Games, constantly strove with all its force to overcome problems which tested its resistance and involved it in tasks difficult of solution. The Olympic experiment of Rome proved highly successful thanks to the solidarity and ability of the organisational bodies and of the various Italian and foreign Committees, and thanks to the spirit of sacrifice and enthusiasm for sport of all those who, at every level and in all sectors, were called upon to collaborate with the Organising Committee. To all collaborators, referees, journalists and technicians from here in Rome I now renew my sincerest thanks. And I address a special message of greeting to the 5,915 athletes of the 84 Countries who gathered in Rome on the occasion of the XVII Olympiad to exalt the spirit of universal sports fraternity. GIULIO ANDREOTTI
20
The Hon. GIULIO ANDREOTTI MINISTER FOR DEFENCE – PRESIDENT OF THE ORGANISING COMMITTEE
FOR
THE
GAMES
OF
XVII
OLYMPIAD
THE ACCOMPLISHMENT OF THE TASK
H aving waited in the past did
long years and overcome adverse circumstances which not allow Rome's ambitions to be satisfied, finally on 15th June 1955 in the 50th Session at Paris, the International Olympic Committee, thanks above all to the careful preparation submitted by the Italian Olympic Committee, awarded the celebration of the Games of the XVII Olympiad to the Italian capital. It should be remembered that on that occasion Avv. Giulio Onesti, Dr. Bruno Zauli, respectively President and Secretary-General of the Italian National Olympic Committee and Ing. Salvatore Rebecchini, Mayor of Rome, with the intention of disposing the I. O. C.'s decision in Rome's favour, succeeded in creating an atmosphere of cordial understanding in the halls of the ancient Parisian palace of Faubourg Saint-Honore taking infinite pains to produce copious documentation, photographs, designs, graphs and plans, all collected in clear order and illustrated with a wealth of details and the supporting proof of figures. At that time, the City only disposed of a single sports installation in line with Olympic requirements:— the Olympic Stadium of Foro Italico inaugurated in 1953 and, in fact, this fine sports stadium with its modern and functional characteristics, already constituted an effective starting point. Besides the difficulties which had to be faced in the construction of stadiums, swimming pools, venues for the events themselves and for training, other problems arose—economical, technical and connected with town-planning—which were then faced and resolved in the course of the four years of preparation. On 22nd September 1955, the Italian National Olympic Committee worked out an overall plan and appointed a planning Committee (Francesco Bartolotta, Nello Ciampi, Marcello Garroni, Pietro Petroselli, Mario 25
URBANO CIOCCETTI Mayor of Rome Vice-President of the Organising Committee
GIULIO ONESTI President of the C.O.N.I. Vice-President of the Organising Committee President of the Executive Committee
PAOLO THAON DI REVEL Member of the Executive Board of the I.O.C. Vice-President of the Organising Committee
26
UMBERTO AGNELLI President of the Italian Football Federation
EMANUELE BIANCHI Member of the Executive Board of the C.O.N.I. - President of the F.M.I.
ALFREDO BOCCALATTE President of the Rowing Federation
Saini, Paolo Thaon di Revel, Giorgio de Stefani), which was to have the task of studying the details of the plan of organisation. On the occasion, Avv. Giulio Onesti illustrated the various tasks and worked out a programme as a result of contacts with the interested National Sports Federations. On 31st March 1956, the Committee was able to present a detailed report to the Executive Board of the Italian National Olympic Committee, taking the opportunity of suggesting that it might be appropriate, in view of the thousands of years of Rome's history, to hold some events included in the programme of the Olympic Games in the Basilica of Maxentius, in the Caracalla Baths and along the Appian Way, etc. The report provided for the tasks of the Organising Committee, the aid necessary for the equipment of camping grounds, the assistance required for the improvement to urban services, the necessity of new roads and, naturally, the construction of sports venues. A detailed examination was called for by the problem regarding the limits of the sphere of action of the future Organising Committee and the main tasks were therefore established as being:— (a) to assure board and lodging to the participants in possession of an Olympic Card, i.e. to the athletes and reserves as established by the regulations, to the Heads of Delegations, to the national and foreign Judges, to journalists and radio reporters, to the members of the Organising Committee, to the Officials of International Federations, to guests of honour such as members of the I. O. C; (b) to ensure transport and parking facilities for the above categories; (c) to arrange for the organisation of eventual sports congresses; 27
(d) to arrange services for the press and other sources of information; (e) to arrange for the constitution and smooth running of all technical sports sectors. The Committee made an exhaustive study of the period most suitable for the holding of the Olympic Games, basing their conclusions on the following elements: temperature and rainfall; hours of daylight; winds for the sailing events; and reception possibilities in relation to the expected tourist traffic.
Organisation problems. The Committee made a point of examining the historical precedents of the sports included in the Olympic Games of Berlin, London, Helsinki and of those included in the technical programme of the XVI Olympic Games of Melbourne. This examination showed that, practically speaking, from 1936 to 1956 no variations had taken place in compulsory and optional sports but only a number of variations on account of increases in the categories of weightlifting and boxing, of classes in yachting, of specialities in target shooting and swimming and other minor variations. In this connection, the Committee examined a number of possibilities of changes in the programme and especially the substitution of an optional sport with another optional sport; however, on the whole it decided that the ideal would be to maintain the standard programme of Helsinki and Melbourne, with the eventual elimination of the " running deer " shooting event, little practised in the various countries. However, the Committee considered it useful to suggest a reduction in the number of the events included in the programme of the two preceding Olympic Games. Having given careful consideration to the number of appointed athletes and reserves present at the Olympic Games of London and Helsinki, the Committee advised the limitation of 28
LEONE BOCCALI President of the Italian Sports Press Union
ANTONIO BRIVIO SFORZA Member of the Executive Board of the C.O.N.I.
GIUSEPPE BRUNO President of the Provincial Administration of Rome
the number of teams, the reduction of reserves, the increase in the number of female participants, the decrease in the number of officials, the possible elimination of team awards when these were equivalent to the total number of events already valid for the individual classifications. In this way, the Committee foresaw that entries would not exceed 6,000 for men and 1,000 for women (making a total maximum of 7,000 entries). The proportion of officials to the total of athletes present was calculated at 25 %, that is 1,800, while accompanying or service personnel was estimated at a total of 1,000. As far as the other categories were concerned, that is, competition officials, journalists and international officials, the Committee suggested an eventual reduction in their numbers, as already foreseen in part by the I.O.C. Regulations, with the blocking of the number of accredited journalists. The plan regarding the personnel of the Organising Committee and for the functioning of the Olympic Village provided for approximately 4,000 persons. Theoretically it seemed advisable that the Olympic Village should be placed in a position to the West of Rome, in a zone equidistant between the two principal centres of Foro Italico and the EUR; but preliminary investigations showed that such a zone did not contain a piece of land of approximately 50 hectares except at such a distance away as to render nil the possible benefit of a relative equidistance between the two principal centres of events. As for the subdivision of the Olympic Villages, the Committee, having examined the precedents, recognised that an evolution had taken place in the previous four year periods and that, in consequence, the sector of the Village reserved for the men should be rendered more functional by linking it to the women's sector. A very similar problem was that of the lodging of other categories, i.e. (1) Officials and
ALFREDO CORRERA Special Commissary for the Municipality of Naples
MARCELLO COSTA Mayor of Castelgandolfo
ANDREA BEPPE CROCE President of the U.S.V.I. Member of the Executive Board of the C.O.N.I.
29
accompanying personnel not lodging in the Olympic Village; (2) Journalists; (3) Judges; (4) Officials of International Federations; (5) Members of the I.O.C. The Committee considered that persons under (1) should be accommodated in hotels or in private houses; the journalists at the Domus Mariae and the Domus Pacis; the Judges in Institutions and only exceptionally in hotels; while persons coming under (4) and (5) could find lodging in high class hotels. On the 28th September 1955, the Italian National Olympic Committee requested the Italian National Sports Federations to inform the Committee, at least by giving a rough idea, of the minimum technical requirements of each sport presumably to be included in the programme of the 1960 Olympic Games, the preparation of the necessary venues, and the eventual storage space for material. Consequently the Committee examined the various requirements and preferences with the representatives of the interested Federations. The Committee considered it appropriate to indicate in a general way,
GUGLIELMO DE ANGELIS D' OSSAT Dir. Gen. Antiquities & Fine Arts – President of the Arts Committee
ALIGHIERO DE MICHELI President of the Italian Confederation of General Industry
GIORGIO DE STEFANI Member of the I.O.C. President of the Italian Tennis Federation
in the case of sports venues, the seating capacity in normal circumstances and requirements for the period of the Games and therefore expressed the conviction that for certain Olympic events, i.e. those scheduled for the peak days (event finals and Opening and Closing Ceremonies) the seating capacity would have to be considerably increased; however, it considered that the average attendance would presumably be less than the maximum capacity provided for.
Expense budgets. The formulation by the Committee of an estimate of expenses was the object of long and detailed examination. It was however recognised that the Committee could not draw up an estimate of expenses in the technical sense 30
of the expression. In fact, even when proceeding with the utmost caution, a serious estimate of expenses could not be prepared on a programme of events still not finalised and on an organising plan still in the course of study. Having thus explained that it was not possible to make a financial estimate of the various requirements of the individual Federations, the Committee still planned to furnish the Executive Board of the C.O.N.I. with all such elements as could, however, have contributed to the working out of the financial plan. But before proceeding to details, the Committee wished to draw the attention of the C.O.N.I. to the advantage of keeping quite separate the sums destined for the construction of venues and those directly invested by the organising Administration of the Olympic Games. In fact, the Committee thought fit to disprove the widespread opinion that the projected venues in Rome were being constructed solely to meet the requirements of the Olympic Games; obviously the construction of certain venues indispensable for the Olympic events would
FRANCESCO DI CAMPELLO President of the Italian Boxing Federation
LANDO FERRETTI DI VAL D'ERA Former President of the C.O.N.I.
FRANCESCO FORMIGLI President of the Italian Equestrian Sports Federation
be necessary, but these would add to the sports requirements of the Capital, as the lack had been widely felt for some years. Thus, ended the Committee, it would be more exact to say that the above-mentioned venues, useful in that they meet an obvious lack at Rome, were to be constructed in occasion of the Olympic Games but not because of these. Consequently, while confirming the opinion that expenses for the organising administration of the Olympic Games should be kept quite separate from expenses for the sports venues, the Committee considered that a brief and also, in this case, indicative outline should be given of the presumable financial requirements for the realisation of the above-mentioned venues. Due account having been taken of the works already constructed (Olympic Stadium and certain training venues), the financial plan was worked out for the construction of the following: Palazzo dello Sport, 31
CRISTOFORO FRACASSI DI TORRE ROSSANO President of the Ceremonial Committee
MARCELLO GARRONI Secretary-General for the Games
GIOVANNI GATTA President of the Italian Target Shooting Union
Palazzetto dello Sport, Velodrome, Swimming Stadium, Castelgandolfo regatta course, Football Stadium, Shooting ranges, training venues. The Committee unanimously made a strong recommendation to the Board of the C.O.N.I, to do their utmost to complete construction of the principal venues by the end of 1959 so that the Organising Committee should thus be able to put them in good time to the necessary test, thereby avoiding possible stress and worry at the last moment.
Allotment of tasks. While the Planning Committee was carrying out its work, the Board of the Italian National Olympic Committee, on 15th May 1956, made a first allotment of tasks, setting up a technical body, namely the C.O.R. (Rome Olympic
LUIGI GEDDA President of the Medical Scientific Committee
32
GUIDO GINANNI President of the Gymnastics Federation of Italy
ANTONIO GUALANO Commander of the Central Military Region
ANTONIO LE PERA President of the Italian Clay Pigeon Shooting Federation
ALBERTO LIUTI Prefect of Rome
ALDO MAIRANO President of the Olympic Torch Committee
Constructions), under Dr. Mario Saini, Vice Secretary-General of the Italian National Olympic Committee, with the responsibility of providing for the construction and equipping of the sports venues. On 1st June following, the Board of the C.O.N.I. established the building in Via Crescenzio No. 14 as temporary headquarters of the Organisation, empowering Dr. Marcello Garroni, Vice Secretary-General of the C.O.N.I., to provide for the setting up and arrangement of the necessary technical offices. The organising plan provided for the provisional constitution of ten Sections each of which was entrusted with specified tasks. Thus the study of the various problems regarding the respective organising sectors immediately got under way. On 12th July 1956, the Italian National Olympic Committee gave precise instructions to the Italian National Sports Federations, engaging their activities
ERMELINO MATARAZZO DI LICOSA C.O.N.I. Delegate for the Province of Naples
RENZO NOSTINI President of the Italian Fencing Federation
PIERO ONEGLIO Vice-President of the C.O.N.I. - President of the F.I.S.I.
33 3.
in technical organisation and, among other things, decided to send a number of experts as observers to the Games of the XVI Olympiad. In the course of the meeting of 3rd October 1956, the Executive Board of the C.O.N.I. examined a detailed report presented by the Rome Olympic Constructions on the lines as laid out, even down to the details concerning the construction and equipping of the sports venues and of the subsidiary venues. The report was approved by the Board which then also proceeded to consider the continuation of negotiations with the Istituto Nazionale Case Impiegati Statali (National Housing Institute for State Employees) for the detailed study and consequent construction of the Olympic Village. At the same time the Board decided to propose to the Presidency of the Council of Ministers the constitution of an Interministerial Committee to conciliate the requirements of complete, profitable and effective collaboration as regards organisation.
VlNCENZO PERCUOCO President of the Italian Swimming Federation
ENRICO REGGIANI Supervisor of Lazio Region Public Works
LUIGI RIO Member of the Executive Board of the C.O.N.I. President of the F.I.H.P.
In February 1957, the President of the Italian National Olympic Committee addressed the following message to the Presidents of the National Olympic Committees: " My dear Colleagues, The Italian National Olympic Committee which has been awarded the privilege of organising the Games of the XVII Olympiad of Rome by the International Olympic Committee today, with the publication of the first number of the Official Bulletin, takes the first official step in the work of organisation. This organisation will be continued daily, with diligence and conviction, with zeal and optimism, until the solemn official opening of the Games and until the solemn and moving closing of the Games of Rome. 34
As President of the Italian Olympic Committee, I have the honour of sending you all my best and most sincere greetings in the name of sport. It is a cause of great pride for the Italian Olympic Committee to prepare an enterprise defined by all as extremely arduous and which will prove even more difficult in this Rome which, in the 2,700 years of its history, has seen so many projects, friends, enemies and so many people pass through it. The holding of the Olympic Games is indeed one of the greatest honours for a nation which wishes to illustrate its considerable advance in sport and to documentate its aspirations through such an aesthetic and moral ideal as is sport. These same purposes of a moral nature will guide the Italian Olympic Committee and its efforts operating during the cycle of preparation and implementation of the exceptionally arduous technical works destined to welcome the youth of the whole world who, in a warm atmosphere worthy of the best traditions of Rome, will celebrate in the XVII Olympic Games the human function of chivalrous liaison between the peoples.
ADRIANO RODONI Vice-President of the C.O.N.I. - President of the Italian Cycling Union
MARIO SAINI Technical Director for the Games
DECIO SCURI Member of the Executive Board of the C . O . N . I . – President of the Italian Basketball Federation
Rome is not yet ready to welcome the Olympic Games of 1960. Much still remains to be done in certain directions, little in others. Much, in the field of the sports venues which the Italian Olympic Committee has in part constructed and in part is preparing to construct with the strong consistent help of the Authorities of the Italian State and of the Rome Municipality. Little remains for the formation of that welcoming well-disposed affectionate spirit towards the officials and athletes and the foreign public in general which Rome will adopt during the period of the Games of the XVII Olympiad. Besides the technical organising factor which the Italian Olympic Committee has assumed in accordance with the strict rules laid down by the International Olympic Committee, other factors — reception, welcoming, well-being of the spectators — contribute to the success of Olympic Games. These other factors will be 35
GAETANO SIMONI President of the Italian Athletics Federation
RAFFAELE TRAVAGLINI DEL VERGANTE DI SANTA RITA President of the E.P.T. of Rome
GIOVANNI VALENTE President of the Italian Wrestling & Weightlifting Federation
attended to principally by the Rome Municipality and the Italian State Tourist Board who have already got to work to prepare facilities for the arrival, the stay in Rome and the departure of all the Olympic visitors. Dear friends and Colleagues, I wish at this moment to assure you that, as in all previous Olympic Games, you will also be welcome guests of honour in the Rome Olympic Games ".
On 2nd May 1957, the Interministerial Committee was constituted and its Presidency was assumed by the President of the Council of Ministers. The Committee was composed of representatives from the following Ministries: Foreign Affairs, Interior, Budget, Finances, Treasury, Defence, Education, Public Works, Transport, Post and Telecomunications, Foreign Commerce, as well as by the Mayor of Rome, the Commissioner for Tourism, the President of Provincial Administration and the President of the Italian National Olympic Committee. In the first meeting held within the framework of the Presidency of the Council of Ministers, the President of the Council, the Hon. Zoli, showed the need for a clear distinction in functions and responsibility in order to avoid any interference between the organisation of the Games undertaken by the Italian National Olympic Committee and the work of coordination by the State Administrations. The President of the Council likewise invited the Committee to make an immediate start on its own work and to make such provisions as were necessary for the better success of the Games. Avv. Giulio Onesti, in his report, referred to the programme pre-established by the Italian National Olympic Committee to provide the city of Rome with the indispensable sports venues giving some indication of the relative financial requirements and drawing attention to the problems of the individual State Administrations. 36
Artistic programme. Meanwhile, in the course of meetings held in the first six months of 1957, the Executive Committee for the Games dealt with many matters and, amongst other things, gave their approval for a competition to be held for the designing of an official poster, whilst they also approved the artistic programme to be presented by the Academy of St. Cecilia. They also dealt with the setting up of new technical offices, the historic itinerary of the relay for the Olympic Torch, the accommodation BRUNO ZAULI of journalists in the new buildings of Domus Secretary-General of the C.O.N.I. – VicePresident of the Executive Committee Mariae and Domus Pacis and a final study on the for the Games enlargement of the small harbours in Naples. During the same period, in a series of hard-working meetings, the Executive Board of the Italian National Olympic Committee (C.O.N.I.) examined and approved the instruments selected for the time-keeping services; authorised the furthering of negotiations with the Italian company of Wagons-Lits for the handling of catering and room services in the Olympic Village; approved the project setting up the Organising Committee and the formation of advisory sub-committees for the Press Section, the Olympic Village section and the Arts section. On the 30th August 1957, the Interministerial Committee met once again under the chairmanship of the Undersecretary to the Presidency of the Council of Ministers, Senator Spallino. During the opening discussion, Senator Spallino drew the attention of the members of the Committee to two very important
FRANCESCO COSTANTINO Councillor of State Member of the Executive Committee
NICOLA GRAZIANO Substitute Attorney - General of State Member of the Executive Committee
VIRGILIO TOMMASI Member of the Executive Committee
37
aspects of the Olympic Games:— (a) the financial problem and (b) the problem of responsibilities. On this occasion, the Committee considered it necessary to establish a programme outlining the responsibilities of each State Administration as well as the assignments of the Italian National Olympic Committee. In November 1957 the Executive Board of the C.O.N.I., pending the nomination of responsible bodies, approved the formation of a select Committee with executive powers and composed of the following members: Marcello Garroni, Secretary-General for the Games; Mario Saini, Technical Director; Francesco Costantino, Secretary-General of the Interministerial Committee; Nicola Graziano and Virgilio Tommasi, Secretaries. The Committee was known as Provisional Committee for the Management of Olympic Affairs (C.O.G.A.O.) From this date onwards, the new Provisional Committee held weekly meetings with a view to examining and facing all problems in connection with the Organisation. Up to the end of the Games, this executive body held 88 official meetings as well as a number of advisory meetings. Amongst the solutions to more important and complex aspects of certain problems were those in connection with a differentiation in the Olympic Card for Judges, the football tournament held on the system of 4 groups of four teams each and the project for the sale of entrance tickets to the stadia and competition grounds. Matters of basic importance were faced by the Provisional Committee in particular during the meeting of 21st January 1958 when a motion was passed to present the selected Poster to the Executive Board of the C.O.N.I. with a
38
The Hon. Andreotti, having become President of the Organising Committee, pays tribute to the work undertaken and expresses the wish that Rome will witness the consolidation of friendly relations between men of all races, civilisations and different traditions in the ancient spirit of Olympia
39
The signing of the official invitations.
40
The poster which announced the assignation of the Games of the XVII Olympiad to Rome on 16th June 1955.
proposal that it be produced in eleven languages, namely:— Italian, English, French, German, Spanish, Greek, Russian, Chinese, Japanese, Indian and Arabic. During this same meeting, the Committee devoted particular attention to the Artistic events, deciding in this connection to hold certain competitions in the picturesque surroundings of monuments and archeological works. Relations with the Provincial Tourist Board were also attended to. In point of fact, the meetings held by the Committee during the first four months of 1958 brought about major decisions such as that of approving the supply of eight thousand pigeons, approving the course of the Olympic Torch, the drafting of a plan for the contribution to be made by the Armed Forces, the elaboration of a project for the setting up of the Photographic Exhibition as well as working out the budget for the technical equipment required in the stadia and competition arenas. In its meeting of June 4th 1958, the Provisional Committee submitted its completed plan of work for the approval of the Executive Board of the C.O.N.I. with a view to illustrating certain aspects of the vast work of organisation, at the same time proposing that certain remedies and more suitable solutions be worked out. The Board agreed to the financing of this special requirement; it approved the proposal for an Exhibition of works of contemporary art, the financial and technical plan for the production of the Olympic film and, lastly, approved the lay-out of the competitions and the respective competition arenas. 41
In a meeting on 18th October 1958, the Executive Board of the C.O.N.I. ratified the project presented by the Provisional Committee in regard to the availability of horses required for the riding test of the Modern Pentathlon. During this same meeting, it gave full powers to the Provisional Committee to start the distribution of entrance tickets to the stadia, to study problems concerning Television and to attend to the furnishing of the Olympic Village. The Board also, after a very careful study, approved the programme and timetable of the Rome Olympic Games.
Nomination of the Organising Committee. At the general meeting of the National Council of the C.O.N.I. held in Rome on November 20th 1958, Minister Giulio Andreotti was unanimously acclaimed as President of the Organising Committee. The acclamation was preceded by a detailed report made by Dr. Bruno Zauli, Secretary-General of the C.O.N.I., to those present at this major national sports assembly. Opening the meeting, the President of the C.O.N.I. read the following declaration: " By previous kind consent of the President of the Italian Republic, Patron of the Games, and kind consent also of the Prime Minister, I have the honour to propose, in the name of the Executive Board, that the Hon. Giulio Andreotti be named by this Council of the C.O.N.I. President of the Organising Committee for the Games of XVII Olympiad ".
Having established the responsible bodies, the Executive Board of the C.O.N.I., in a meeting held on February 25th 1959, established the composition of the Organising Committee and the Executive Committee. The same President of the C.O.N.I., Avv. Giulio Onesti, became President of the Executive Committee whilst, a few months later, the Secretary-General of the C.O.N.I., Dr. Bruno Zauli became Vice-President. As a result of this, all powers and functions previously entrusted to the Provisional Committee were now transferred to the Executive Committee. On 26th March 1959, once the Organising Committee was set up, the Hon. Andreotti, having expressed his gratitude to the President of the Republic, pointed out the duties of the Committee and concluded with the words: " Insofar as the sports facilities are concerned, we are sure today that all our plans have been completed and put into effect and that everything will be ready for use when the Games are due to open. We want to make sure of preserving the specifically sporting nature of the Olympic celebration. Naturally in order to do this, there are many other problems to be solved in connection with the city's reception capacity, accommodational facilities and so on, but none of these will ever cause us to lose sight of that essential factor, the Olympic character which will distinguish our celebration ". 42
Mr. Andreotti then went on to stress that the Olympic Games would " constitute an event of such exceptional importance as to be perhaps without equal in the history of the country. When the work is done in the knowledge that this Olympic celebration will be held in strict conformity with the rules, we are giving a silent response, perhaps more efficacious than any conveyed with grandiloquent phrases, to the anguish we sometimes feel when the storm clouds darken the international horizon ".
Immediately after this, Mr. Andreotti appended his signature to the first six invitations to the Games, beginning symbolically with the invitation to Greece, followed by those to the five countries, each belonging to one of the five continents, situated geographically the furthest away from Rome, that is:— Finland, Japan, South Africa, Peru and New Zealand. During a number of meetings called for this purpose during the month of April 1959, the Executive Board of the C.O.N.I. approved all the plans made for the meeting of the Executive Board of the International Olympic Committee with representatives from National Olympic Committees, which was held on May 19th in the premises of the Foro Italico. Unfortunately it sometimes happens that works already initiated or even completed have to be completely redrafted. This was the case when it was originally intended only to outline the plan or regulations which seemed best to suit the situation or when the Executive Committee examined the programme prepared for the Opening and Closing Ceremonies and the Art celebrations. Towards the end of May 1959, the Executive Committee ratified contracts with the Wagons-Lits and contracts for the ceding of television rights to North America. It also decided definitively on the various types of entrance tickets to the stadia and competition arenas.
City problems. On 13th June 1959, Mr. Andreotti presided over one of the most important meetings of the Organising Committee at which the Mayor of Rome, Mr. Urbano Cioccetti, was present. Particular attention was paid to the following during that meeting: problems concerning the responsibilities of the city administration and, in this connection, the Mayor took it upon himself to ensure that the Municipality would improve the road network, street lighting and illumination of monuments, devote attention to public gardens, the cleanliness of the city, and improvement to parking lots and public transport. The Mayor furthermore gave his assurance that he would appeal to the financial institutions of the city for help in providing suitable decorations, improvement to buildings, etc. He would also attend to the question of reception capacity by appealing to the traditional hospitality of the citizens of Rome, 43
as a result of the shortage in normal accommodation, and would also give his personal attention to the various festivities that were being planned by setting up a Committee which he would entrust to the Provincial Tourist Board. During meetings which were held in the second half of 1959, the main problems of organisation were in nearly all cases solved. The work can be said to have been divided up into three special sectors:— (a) the technical organisation with a Secretariat, protocol, the sports programmes, Olympic cards, ticket office, interpreters, etc; (b) the progressive construction of sports venues; (c) liaison with the responsible bodies for hotel accommodation, traffic, tourism, etc. In the vast plan of organisation, the Committee did not omit to consider the problem of the various religions of the athletes from the different countries. This task was undertaken by the Catholic Church which, in its traditional spirit of comprehension, provided the necessary means of putting it into effect. Again, during the last six months of 1959, the Executive Committee for the Games agreed over all questions in connection with the sailing craft required for the yachting events in Naples; it approved the prototype of the Torch produced by Prof. Mauri and the regulations governing the Sports Photography Exhibition; it gave its agreement to the printing of the official poster in eleven languages for a total of 290,000 copies to measure 70 × 100 cms. During this same period, final agreements were drawn up with INCIS (National Institute for the Housing of State Employees) over the road network in the Olympic Village and the construction of temporary buildings as restaurants and made the necessary engagements with the Ministry of Post and Telecommunications for the installation of telephone networks. In November 1959, decisions were made over the technical solutions required for the use of the Basilica of Maxentius and the Caracalla Baths as venues for the Wrestling and Gymnastics competitions. Further engagements were also made by the Executive Committee for the supply and purchase of furniture for the Olympic Village and the setting up of a photographic pool. During a meeting of the Executive Committee held on November 23rd 1959, all matters appertaining to all the sectors of the organisation were considered. These matters had already been put forward during a preceding meeting of the Organising Committee held on November 22nd under the Chairmanship of the Hon. Andreotti. The Executive Committee approved all decisions taken in respect of:— (A) Sports:— (1) Olympic venues; (2) Technical organisation; (3) Tenders from public and private organisations. 44
On July 25th 1960, the members of the Organising Committee attend the ceremony for the official opening of the Olympic Village now completed and furnished. On the following 28th July, the first athletes (five Indonesian cyclists and six Ghana boxers) took possession of their respective quarters and thus started the long series of arrivals which were to take place at all hours of the day and night in complete Olympic surroundings.
45
(B) Provincial Tourist Board:— (1) Accommodation; (2) Reception and festivities; be held by the Tourist Industry.
(3) Events to
(C) Municipality Works:— (1) Decoration and improvements of the city; (2) Public works. In the course of this same meeting, the Executive Committee authorised the Italian Radio and TV company to transmit the events of the Games free of charge within the territory of the Italian Republic but limited to certain hours of the day on unscheduled programmes. In this way the sports-loving Italian public who were unable to attend the Games would have the opportunity of following at least the most spectacular episodes and the more important events. At a meeting held on December 15th 1959, the Executive Committee examined the following matters:— (a) plan of operation for the Olympic Film; (b) negotiations with the European Television; (c) prices of hotels and pensions; (d) prices of entrance tickets to the stadia; (e) reduction of railway fares for the protagonists in the Games. It furthermore decided on the opportunity of reaching an agreement with the Telephone Company over the telephone network in the Olympic Village, the Press Centre and in the various venues. The Executive Committee lastly took note of the publication of the 17 Technical Regulations. The beginning of 1960 registered the 61st meeting of the Executive Committee which was held on January 4th and during which nominations were made of Technical Executives in substitution of those transferred to other appointments, approval given over the layout of the Olympic card and a further examination made of the plan for the Olympic film, the decision being taken to produce it in colour on a 35mm scale. Definite approval was given to the plan for the Closing Ceremony and that concerning medical arrangements in the Olympic Village. The meeting held on January 18th 1960 served the purpose of deciding on the plan for the requirements of small, medium and large transport; the printing of daily programmes and the formation of the photographic pool which was to comprise the following agencies: Associated Press, United Press, Keystone, E.P.U., Agenzia Italia and A.N.S.A. Mr. Elvezio Bianchi of United Press was nominated Director of the pool. During the first six months of 1960, meetings became ever more frequent so as to provide constant assistance and control on the rapidly increasing organisation. Noteworthy problems were debated and decisions given. One of the trickiest problems was that of the Olympic Village. The buildings and appartments were by this time ready and were allocated to the various delegations taking part in the Games, whilst the necessary furniture for the premises was collected. The material which had come from private industry was gradually 46
placed in the various appartments whilst arrangements were made to apportion the vast amount of material coming in from the Armed Forces on temporary loan. In the mean time the kitchen equipment was installed, cooking equipment ordered and contracts made for the supply of foodstuffs, agreements entered into with the Italian Federation of Agricultural Consortiums and the Gondrand Transport Company, etc. On 25th July 1960 at 10.00 hrs., the Hon. Andreotti, as President of the Organising Committee, was present at a ceremony which took place to proclaim the official opening of the Olympic Village. He made a significant speech in which he outlined the importance of the great international sports event and the effect it could have on the policy of friendship and solidarity between the nations of the world. The Ceremony, which started with the playing of the " Olympic Anthem " (the musical score which starts Mascagni's Hymn of the Sun) repeated three times, was concluded by the hoisting of the 84 flags of the countries participating in the Rome Games whilst a military band played the Olympic Hymn. During the ceremony, Mr. Andreotti declared in the course of his official speech: " We are now exactly one month away from the official Opening of the Rome Games and today activity starts in this Village where, for a number of weeks, the protagonists in the great world sports event will live together in the daily excitement of these Games which Italy has tried to prepare with that sense of duty and generous hospitality which are essential characteristics of our people. When a few moments ago we saw the flags of the 84 countries participating in the Games being raised, our hearts were in some way moved as, in these times of mechanisation—to which, in a certain way, the Olympiads form a contrast— some profoundly romantic note still lingers on. Here the great human aspirations in loyal tussle, the objective recognition of virtue and capacity, the overcoming of all nationalistic differences and racial discriminations and the particular attention paid to youth assume a concrete as distinguished from a rhetorical significance. It is the ideal of every sports competition. In this respect, no city more then Rome—and this we may say without committing the sin of pride—is fitted to give the Olympic Games that background of universality which is the ambition they try to achieve. Now that we have all paid just honour to the national flag of each country, we bid a welcome to all the athletes and accompanying personnel who will be living in the Village. If no one of these feels a stranger within it and if, returning to their country, they all carry with them a pleasant memory of Rome and the Village, the Organising Committee will have been amply repaid for their toils on the eve of the Olympic Games ".
As the period of the Games drew near, the work of organisation reached a feverish pitch and, in many cases, was rendered even more difficult by the 47
fact that certain works had to be completed or weak spots in certain sectors strengthened. However, the organisation as a whole could be considered complete, only minor details remaining to be settled and these only in specific sectors. The Protocol section drew up its plans for the arrival and departure of Officials, athletes and journalists (" reception offices "). For this purpose, arrangements for the setting up of these offices were made with the Headquarters of Ciampino Airport and with the Italian State Railways; the lady guide-interpreters were allocated to their posts; final touches were made to the rules and executive formalities governing the Opening and Closing Ceremonies and prizegiving ceremonies; the last of the national flags were reproduced, whilst the music score sheets of all the national anthems and the Olympic Hymn were prepared and also registered on tape. It should be remembered that during this same period, the Executive Committee examined and approved a series of other matters such as the selection of the diplomas to be printed, the number of medals required for the athletes and the commemorative medal; the working out of a timetable for the Congresses of the I.O.C. and International Sports Federations; the programme of receptions and the transport to Rome of the Olympic Torch. In the course of further meetings with various bodies, final arrangements were made with the Tourist department of the Rome Municipality, the Provincial Tourist Board, the National Tourist Industry, the Italian Automobile Club and the Italian Touring Club for all that concerned finalising artistic-sports events, reception, tourism, etc. Where the necessity arose for intervention or financial aid in the artistic field, the Executive Committee rose to the occasion immediately with very broad outlooks. This proved particularly useful in connection with the setting up of the Sport in History and in Art Exhibition which was organised in the Palace of Sciences at the EUR. It is also considered opportune to mention the equally valuable work undertaken by the Executive Committee as and when Olympic constructions and training grounds became ready. These venues were immediately opened and special events organised to test the efficiency of the grounds and equipment as well as to train the personnel allocated to them. The opportunity was also taken to classify and select equipment and material for the events in each sport in strict collaboration with the Italian and International Sports Federations.
The organisation effort. During this final period, meetings of the Organising Committee and Executive Committee were in continuous alternation. Approvals and decisions were multiplied in each sector of the organisation. Even the daily training 48
of the arriving teams became a serious problem. In fact, many teams arrived in Rome well ahead of schedule; they requested and were granted permission to use the swimming pools, grounds and gymnasiums. The organising effort in these cases served a double, but nevertheless uniform, purpose namely:— (a) that of ensuring optimum conditions for training and (b) organising all the complementary venues for the various sports. These were all very essential venues, most of which were already in operation, equipped in detail, and placed at the disposal of the athletes for their daily training. During the final phase of the technical organisation, many other problems which were not a direct responsibility of the Organising Committee, such as the city accommodation, tourism, traffic and others, were also dealt with. The special meeting of the National Council of the C.O.N.I. held on June 16th 1960, during which the activity of the Organising Committee received high praise, dealt with all the situations and necessities which by this time required an immediate decision. During the meetings of the Executive Committee which followed, all the details arising from this debate of the National Council were apportioned, with solutions, to the various sectors. During the first ten days of July 1960, the Executive Committee in one of its final meetings, took note of all matters which had finally been cleared and regularised (based on the various requirements) with the cooperating parties. It also gave out final instructions to all Sections so that the technical and organisational programmes could be put into effect. With these final instructions, the duty of the Organising Committee may be considered as having been completed insofar as the preparation of the Games of the XVII Olympiad was concerned. It should be remembered that the total number of meetings held during the four years of preparation amounted to 344 in number, namely:— National Council of the C.O.N.I Executive Board of the C.O.N.I Organising Committee C.O.N.I. Presidency Provisional Committee and Executive Committee Olympic Military Detachment Technical Sections Various Organisations (RAI-TV, Cinema, EPT, BNL, etc.)
5 29 5 22 89 28 94 72
It may be concluded from this schematic and general survey that the results achieved, both from an organisational and technical point of view, fully conformed with the efforts made and responded to the schedule. In other words, the vast and complex organisation, although at times having put the C.O.N.I. to a severe test, often requiring brusque efforts which were sometimes risky and a trial to resistance and capacity, achieved overall results which should be considered decisively positive. This must not only be at49
tributed to the generous and capable collective efforts of all collaborators but also to the well-estimated period of preparation as well as to the increasing enthusiasm for the Olympic ideal. Merit also goes to all the Authorities who responded with generous courtesy to all appeals made for the Olympic organisation. His Holiness Pope John XXIII wished to hold a special audience for all participating teams on the afternoon of August 24th in St. Peter's Square. The Head of State, who kindly consented to act as Patron of the Games, continually offered his close and zealous support to the Organisation, particularly during the preparatory phase. The President of the Organising Committee, the Hon. Giulio Andreotti, understood and performed admirably all the duties involved with enthusiasm and efficiency. On the 28th November 1960, the Organising Committee met for the last time in the presence of the National Council of the C.O.N.I. Mr. Andreotti gave a detailed illustration of the work that had been fulfilled and immediately afterwards dissolved the Organising Committee whose responsibilities were then passed on to the C.O.N.I., this body receiving the same powers previously exercised by the Organising Committee and Executive Committee. On this occasion, the National Council of the C.O.N.I, associated themselves with the praise rendered by Mr. Andreotti to the Presidents of the Olympic Federations, to the organisers and to all the collaborators who had offered their valuable services to the achievement of the organisational results. On the conclusion of the Games of the XVII Olympiad of Rome, the International Olympic Committee addressed a letter of congratulation to Mr. Andreotti, President of the Organising Committee, the text of which is as follows:— " We feel it our duty to express our most sincere congratulations for the admirable organisation of the Games which you so ably presided over. All the services under your direction functioned magnificently to the utmost satisfaction of the International Olympic Committee and we therefore consider it our obligation to proffer our most sincere and profound thanks. The Rome Games will remain alive in the history of Olympism as the most brilliant that have been organised to date. We owe this principally to you who have directed the greatest world sports organisation whose success was outstanding. We are delighted at the fact that the Press in its entirety recognised this perfect success. The faith placed in Rome when we allocated the organisation of the Games to this city was not in vain—and of this we never had any doubt—because you fully reached the scope we had hoped for, indeed surpassing all that we could have wished. ".
As always happens in everyday life, when things are anxiously awaited and quickly pass, so the Games of the XVII Olympiad, which appeared as a thing of the past in that meeting of the National Council of the C.O.N.I., passed definitively into the history of sport, with all the lessons that may be learnt from them for the future of Olympic sport. 50
THE OLYMPIC VENUES
L ong before the Games of the XVII Olympiad were assigned to Rome, the C. O. N. I. had already made a careful study of the sports venues that would be required for the great event. In this respect, on 20th October 1954 the Executive Board of the C.O.N.I. decided to set up an appropriate Technical Committee known as " Rome Olympic Constructions " (C.O.R.). The C.O.R. first of all attended to, in agreement and in close co-operation with the Rome Municipality and the Ministry for Public Works, finding suitable areas for both venues and the Olympic Village and rapidly set out various plans and technical elaborations in this respect. At that time, there only existed the Olympic Stadium which had been inaugurated two years previously and which came into being under the auspices of the Secretary-General of the C.O.N.I., Mr. Bruno Zauli. The C.O.R. was placed in the charge of Mr. Mario Saini, Vice SecretaryGeneral of the C.O.N.I. who was also Technical Director of the Games; Secretary of the C.O.R. was Ing. Luciano Berti, recently deceased, who dedicated the greater part of his life to the various problems connected with sports venues. The C.O.R. made use of the services of Prof. Ing. Cesare Valle of the Ministry for Public Works and Ing. Francesco Allegra, Secretary-General of the National Institute for the Housing of State Employees (I.N.C.I.S.) as technical consultants and also consulted the finest Italian technicians on the various problems as and when they arose. Above all, the C.O.R. received considerable help from the Minister for Public Works at that time, Mr. Giuseppe Togni, who succeeding in overcoming the tremendous difficulties of that period with enthusiasm, competence and dedication. Besides the problem of the sports venues and the Olympic Village, which will be illustrated later, the C.O.R., in co-operation with the Ministry of Posts and Telegraphs and the Tirrena Telephone Company, planned and executed the whole of the communication network as well as telephone, telegraph and radio communications. It also set up the various Press Centres, an extremely 53
complicated work which took over two years to complete, which proved extremely satisfactory as, during the Games, they were a means of keeping the Press informed with a speed such as has never been reached up to now. Another sector which the C.O.R. managed to put into operation in time in each venue, was that of the visual and acoustic communication service for the public, a service which enabled spectators to receive results of the various events with extreme rapidity and clearness immediately after the various Juries had compiled them. But perhaps the greatest satisfaction afforded those responsible for the sports venues was that, once the Games were over, the venues that had been prepared for the event today become an ever-increasing attraction to Roman youth which frequents them with great enthusiasm, filled with the memories of the success of the Rome Olympiad.
Overall organisation of the work. The general criterion followed by the C.O.R. (Rome Olympic Constructions) in the organisation for the construction of venues necessitated dividing up the work into three sectors, that is, the venues under construction were classified under three categories:— (a) competition venues; (b) subsidiary venues; (c) Olympic villages. Venues where the Olympic competitions were held and where training took place fell under the first two categories. Also classified under these two categories was the work of improvement, re-laying and adaptation of venues already in existance. The third category included lodgings for athletes and competition officials, accompanying personnel, etc. The C.O.R. enforced certain directives for all venues, both for those to be newly built as well as those requiring improvements, and therefore stipulated that:— (a) improvements of luxury or of high cost were to be avoided and that the aim was to create functional venues to be run at a minimum cost. One exception was made, i.e. for the Palazzo dello Sport because of the type of events to be held there and the particular area where it was to be built; (b) the construction of venues on privately owned land was to be avoided, preference being given to land of municipal or State property which could be subject to negotiation between the C.O.N.I. and interested authorities; (c) the subsidiary venues to be used should be those, as far as possible, already in existence and which could be easily adapted or improved upon; (d) account should be taken of the capacity for the public in occasion of the Olympic Games and future use of the venue once the Games were over. 54
A detailed estimate of expense was prepared for each and every project and all estimates were carefully examined and approved by the Executive Board of the C.O.N.I. Again, particularly for the bigger venues, plans were examined by the Inter-ministerial Committee for Sports Venues (in accordance with Law 739 dated 2/6/1939), the Rome Municipality Building Committee, the Superintendent's Office for Rome Monuments and Fine Arts and also by the Superior Council of the Ministry for Public Works.
Tenders for the work. Contracts for the work were made by tender between reputable firms registered with the office of the Supervisor of Public Works and selected by an appropriate Committee established periodically and in accordance with the practice adopted by the Ministry for Public Works. Insofar as the Olympic Villages was concerned, the C.O.N.I., having obtained approval from the Ministry of Public Works, made special arrangements with the National Institute for the Housing of State Employees, this latter Institute being a parastatal organisation which provides housing. In fact, once the Olympic period was over, the village became an ideal residential quarter inhabited principally by State employees. The work of construction was carried out in accordance with the regulations governing public works and a control was established by inspectors nominated and chosen, for their proven capacity, by the Ministry for Public Works. From a town-planning point of view, the Venues were planned and built in two separate areas known as:— (a) The North Olympic Centre, including the Foro Italico, which was situated in one of the most characteristic areas of Rome lying between the green slopes of Monte Mario and the Farnesina hills; (b) The South Olympic Centre which was created in the area selected for the Universal Exhibition of 1942 (E.U.R.). This area was developing rapidly and had become a new suburb of Rome. The Ministry for Public Works undertook to provide a road network linking these two centres and called the Olympic Way. In 1928, works were started to develop the slopes of Monte Mario and surrounding areas which were soon to witness a series of modern constructions built for the holding of sports events. Later, because of the Olympic Games which were to have taken place in Rome in 1944, work was started on the building of a stadium, known as Stadio dei Cipressi, which was to be oval in shape. Unfortunately, because of the war, the Games were never held, and all work on the area was suspended. However, in December 1950 work was started by C.O.N.I. to create the new Olympic Stadium on the same site as the former one and to improve the existing venues such as the Stadio dei Marmi, the fencing gymnasium, the tennis courts and the covered swimming pool, etc. 55
The Olympic Stadium. The Olympic Stadium was built on the same basis as that of the Stadio dei Cipressi which was planned by architect Mario Moretti. The new project was planned by Prof. Carlo Roccatelli and architect Annibale Vitellozzi. The Stadium is situated on an area of land measuring 90,000 sq. m. and covers 33,500 sq. m. of this. The external perimeter has a length of 1,200 metres. The public has access to the Stadium through 10 external gates and reach their places through 59 corridors. The stadium can be emptied in a maximum of 11 minutes. The field and track are separated from the public by a pit 2 m. wide and 1.90 m. deep. Its total length is 507 metres. The grass field, the track and the other installations for athletics possess a special arrangement for drainage which also functions, during the hot season, View of the North Olympic Centre at Foro Italico. The work of construction on the Swimming Stadium can be seen.
to provide the degree of humidity required. There is also a modern and efficient installation which permits watering in a short period of time. The seating tiers run for a total length of approx. 30 kms. They are 0.80 m. wide and 0.40 m. high, with intervening corridors planned so as to permit excellent visibility for the public in any section. At the Monte Mario end, the Stadium has an iron construction 80 m. long with 40 cabins built in aluminium and glass, for telecommentators. Arrangements for the Press include a workroom, various waiting-rooms and premises with 54 telephone booths for local and international calls. Available also is a room with teleprinters, telephoto premises and a telegraph office. During the Olympic Games, the 572 seats normally reserved for journalists (of which 294 under cover) were increased to 1,126 seats and the various services such as telephones, telegraph and radio facilities were also amplified accordingly. On the ground floor, in direct communication with the 4 entrances to the field, are located 4 groups of dressing-rooms all provided with showers and hygienic services. During the Games, these were used by competition officials. A special system of loudspeaker equipment, installed in the pit which encircles the field, informs the public of news and results, sound being directed upwards. A thermic centre with five boilers, capable of producing up to 1,200,000 calories, supples heating for the premises as well as hot water. The power plant for lighting and motive power produces up to 375,000 watts and consists of a main generating station with 11 sub-units. In case of emergency, the Stadium also possesses an autonomous lighting plant. Apart from the electrical centre, there is also a telephone exchange and a radio centre which are situated below the Monte Mario stands. The four towers for night lighting provide illumination amounting to 250 lux units centred on the field for evening competitions. The Olympic Stadium was built for a total cost of 3,400,000,000 lire. Summary of main characteristics:— -
total capacity, if necessary, for up to 90,000 spectators; symmetrically oval in shape in respect to both axes; main axis measures 319 metres externally and 205.80 internally; minor axis measures 186 metres externally and 94.40 internally; field level is 4.50 metres below road level; maximum height of the tiers in respect to the field is 20.50 metres. 57
The Flaminio Stadium. The new Flaminio Stadium stands on the site of the former " Torino " Stadium, formerly noted for its severe architectural style and Grecian line. Built in 1911 and reconstructed in 1927, this latter stadium was considered out-of-date from a technical point of view and unfit for use due to the ravages of time, and the dangerous cracks which had appeared induced the authorities to restrict its use for reasons of safety. This old stadium, having served its purpose, was therefore replaced by an ultramodern stadium. The old stadium now only exists in the pages of sports history lived within its walls but it may also be remembered as the former headquarters of the C.O.N.I. With its modern installations and its services for both public and press, the new Flaminio Stadium fulfills all the requirements of an up-to-date venue. It was constructed immediately after the old stadium was demolished in July 1957. The Flaminio Stadium was officially inaugurated on 12th March 1959 and the following day witnessed the football match between the amateur teams of Italy and Holland. The new stadium, designed by the architects Pierluigi and Antonio Nervi and built by the firm of Nervi and Bartoli under the direction of Engineer Bruno Magrelli, covers the same area as the former one. It was, however, possible to increase the number of seats as the seating tiers were projected to a height of 6 metres. In fact, the stadium has a capacity for 42,000 persons of which 8,000 under cover. Exterior entrances regulate the entry and exit of the public. All sectors are provided with bar and other services. There are spacious dressing-rooms under the stands for football teams, all provided with showers, bathrooms, massage rooms and a medical consultation infirmary. Athletes reach the field through an underground passage. Even though the stadium is reserved for football matches, there are a number of training venues located below the stands and which can be reached through different entrances to those used by the public during the Olympic Games. These include:— a covered and heated swimming pool measuring 25 × 10 metres, a fencing hall and two smaller halls for instruction purposes, a group of two gymnasiums for wrestling and weightlifting, a boxing room and a gymnasium for gymnastics. The Stadium disposes of 114 seats for journalists and 12 cabins for radiocommentators which project out from under the roof of the covered stand. There is also a press room with telephone booths and a room with teleprinters. During the Games both the seats for the Press and facilities were substantially increased. The lighting installations used during evening competitions are among the most modern. There are 240 projectors placed on four steel towers; each tower is fitted with 60 projectors placed in rows of 15 each and at a height 58
State of work on the Palazzetto dello Sport as at 15th October 1956.
The original modern line of the spherical dome of the Palazzetto dello Sport.
varying from 42 to 46.50 metres. The installation has a lighting power of 425 kilowatts and illumination of the field can be graduated to exceed 300 lux units for each sq. metre of field. The Flaminio Stadium took 80,000 work days (men × days) to construct and did not exceed the estimated cost of 900 million lire. Summary of technical data:— — — — — —
total area covered:— 21,650 sq. metres approx.; measurements of field:— 105 × 70 metres; major axis:— 181 metres; minor axis:— 131 metres; dimensions of covered swimming pool:— 25 × 10 metres with a minimum depth of 1.60 metres and a maximum depth of 1.80 m. It is air-conditioned with room temperature of 26° and water temperature of 24°
The Palazzetto dello Sport. The Palazzetto dello Sport was the first venue to be completed under the construction plans for the Games of the XVII Olympiad and may be considered as the prototype of a sports venue of medium size built at low cost. It was with this idea in mind that the technical installations and equipment were reduced to an absolute minimum, whilst internal and external finishing touches were practical and economical. In this way a venue was created which could be used extensively for purposes of sports propaganda. Built in accordance with a general plan by architect Annibale Vitellozzi and a project for the reinforced concrete portion by Engineer Pierluigi Nervi— under the direction of Engineer Giacomo Maccagno— this venue can be used for every kind of indoor sport. Within its precincts, apart from services for the public which include amenities, bars and a first-aid centre, there are four groups of dressing-rooms with independent entrances capable of accommodating 100 athletes, a dressingroom for competition officials, a medical sports centre, an office for the management and a press room with 12 telephone booths. There are also two large store rooms and other smaller premises. Heating and air-conditioning installations are situated in the basement. The hall is illuminated by indirect lighting consisting of an arrangement of incandescent bulbs set in 18 metallic globes held in place by steel wiring, whilst the illumination of the arena is provided by two rows of projectors situated in the dome and which can be regulated according to the event taking place. 60
State of work on the Swimming Stadium in November 1958.
Olympic Swimming Stadium: the complex of springboards and the diving pool.
The dome also houses the aspirator equipment for purification of the air as well as loudspeaker equipment. Other loudspeakers to call athletes forward are situated in the dressing-rooms. Electric scoreboards with chronometers synchronised with those of the referees have been installed for basketball competitions. These same scoreboards, after slight modifications, can also be used for indoor tennis and other sports. During boxing tournaments and wrestling matches, a special chronometer situated immediately above the ring or stage indicating the timing of each bout is clearly visible to all spectators. Seating accommodation for boxing, basketball, tennis and wrestling has been the subject of careful study. In fact, the venue can seat 3,500 persons for basketball and some 5,600 for boxing, wrestling, etc. Outside the building, the areas in between the supporting pillars are arranged as gardens, whilst a road of 78 metres in diameter runs right the way round the venue, thus ensuring the rapid exit of the public. The building is surmounted by a round vault of 1,620 prefabricated parts in concrete and which required 1,300 quintals of iron, 550 of which were required for the dome alone, and 9,600 quintals of cement. It covers an area of 4,776 sq. metres with a cubic capacity of 40,200 cub. m. Construction of the Palazzetto was undertaken by the firm of Nervi & Bartoli and was started on 26th July 1956 and completed on 15th September 1957. It required 28,750 work days (men × days) and cost a total of 263,000,000 lire including furnishing and sports equipment. Summary of technical data:— -
Area covered:— 4,776 sq. metres; External diameter:— 78 metres; Internal diameter:— 58.50 metres; Height from arena level to top of dome:— 21 metres; Seating tiers are of crescent shape, i.e. they follow the oval shape of the arena which is situated 3 metres below ground level.
The Swimming Stadium. The Swimming Stadium is situated in the North Olympic Centre in the immediate vicinity of the covered swimming pool. It was planned by architect Annibale Vitellozzi and Prof. Enrico del Debbio. Works were directed by Prof. Cherubino Malpeli. The complex is divided into two separate zones; the first including the competition pool and respective services with seating tiers for the public whilst the second contains venues for swimming instruction and a pool for children and non-swimmers. 62
The Olympic pools and swimming school pool contain a gallery running around the perimeter with glass observation panels and underwater lighting. Special technical equipment permits the water to be maintained at a temperature varying between 22° and 24° C. The seating tiers can normally accommodate 8,000 spectators but during the period of the Games the capacity was increased to 20,000 by means of additional temporary fixtures. The starting blocks at the ends of the pool are fitted with special plugs for the electric chronometers and a special plug for a watch mechanism which registers the lengths swum in long-distance races. The Stadium has been equipped with comfortable dressing-rooms which include, in addition to the ordinary services, rest booths for the athletes. On the side of the pools are located press rooms, telephone and telegraph services, special installations for radio-commentators and equipment for the transmission of telephotos and television recordings, offices for timekeepers, directors and competition officials. In a building lying between the Olympic pools and the swimming school pools are to be found 2 snack-bars, one with an ample open-air space for the swimmers and the other, completely separated from the first, reserved for the public which can also make use of a large terrace. The Stadium possesses a large solarium and 150 dressing-rooms. The Stadium is open to the public except during days when competitions are held or when training takes place. The Stadium can accommodate some 3,000 swimmers per day. An underground passage connects the Stadium to the covered swimming pool which, during the Games, was reserved for the athletes for warming-up before their races. This latter pool, designed by architect Enrico del Debbio, is located in a vast hall measuring 62 × 36 metres. One side is completely open to day-light by means of windows which extend from the floor to the ceiling. On the opposite side there are 6 seating tiers for the public. There is also a balcony with access to a large room where refreshments are available. The pool, which measures 50 × 20 metres, is lined with marble, whilst the space around the pool is paved with black-and-white marble decorated with acquatic mosaic designs. The wall at the end of the pool is also of marble mosaic designed with mythological scenes depicted in coloured mosaic. The constructions of the Swimming Stadium required considerable quantities of material which included:— 41,000 quintals of cement, 10,000 quintals of iron, 17,000 sq. metres of travertine marble slabs, 2,000 sq. metres of glass and 20,000 sq. metres of water-proofing material. 100,000 cub. m. of earth had to be removed. The work of construction, undertaken by the firm of Eng. Loy Dona and Brancaccio, was started in the autumn of 1957 and the Stadium was inaugurated in the spring of 1960 with an International Swimming Meeting between Italy, Great Britain and Finland. 63
Summary of technical data:— - Olympic pool:— 25 × 50 metres with depth ranging from 1.80 to 2 m. - Diving pool:— 18 × 20 metres with depth from 4.50 to 5 metres. There are four springboards, two 3-metre and two 1-metre; diving platforms of 1, 3, 5, 7.50 and 10 metres. The 10-metre platform can be reached by a lift. - Swimming school pools:— one measuring 25 × 12.50 metres, depth ranging from 1.20 to 1.40 metres, another of 4 × 12.50 metres with depth from 0.90 to 1 metre and a third of 20 × 10 metres with depth of 1.20 metres.
The Stadio dei Marmi. The Stadio dei Marmi (Marble Stadium), built in 1936 on a project by architect Prof. Enrico del Debbio, somewhat resembles a Greek stadium. Its main characteristic is the superb series of 60 statues which crown the glacis. Each statue is 4 metres high and is set on a cylindrical block of two metres in diameter and 1.20 metres high. The seating tiers which form a series of steps, except for two breaks, measure a total of 5,000 sq. metres and can accommodate about 15,000 spectators. The blocks of marble forming the tiers provide the stadium with its special character, hence its name of Marble Stadium. A number of technical modifications were necessary on this stadium in occasion of the Games of the XVII Olympiad. The sports arena was completely re-laid so as to make it completely efficient. The throwing areas and the 400-metre track with six lanes were completely renewed so as to make them suitable for the various uses required by the various types of athletic sports. The traditional types of throwing areas and tracks were transformed into large spaces made out of " tennisolite " mixture and thus permitted more rational use of the venue. During the Olympic Games, the grass field of the stadium was used for the elimination rounds of the Hockey Tournament as well as an area where the athletes could warm up prior to taking part in the various competitions in the Olympic Stadium. The Stadio dei Marmi is, in fact, connected to the Olympic Stadium by means of a large underground passage, whilst a series of electric links and telephones were installed to call athletes forward. The services, dressing-rooms, and stores were installed in two pavilions on each side of the entrance. Under the stands, 18 dressing-rooms were built, all containing showers and amenities, which were used, during the various competitions, by all the participants in the Athletics events of the Olympic Games. 64
Summary of technical data:— - Sports ground:— covers an area of 14,000 sq. m. and measures 63 × 103 metres. - Track:— 400 metres overall length with 6 lanes.
The Acqua Acetosa sports zone. The necessity of providing Rome with a centre adequate to meet the everincreasing sports requirements of the capital decided the Italian National Olympic Committee to set up a complex of works in the Acqua Acetosa area. This area extends to the North-East of Rome on the left bank of the Tiber some 2 kms. from the Foro Italico Olympic centre, 1 km. from the Olympic Village, Palazzetto dello Sport and some 4 kms. from the centre of the city. The " Acqua Acetosa " sports zone, the main training centre, situated to the north-east of Rome.
The idea which prompted the building of this Venue was to encourage the formation of young persons wishing to undergo specialised training. The project by architect Annibale Vitellozzi was realised over an area of 220,000 sq. metres and the necessary work was undertaken by the Engineering firm of Magrelli, Lombardi and Androsoni. The Venue which was perfect from a technical point of view was extremely useful to the Olympic Games as the athletes used it for their daily training. Some 2,000 athletes were present there daily. The Acqua Acetosa sports area is also one of great natural beauty with more than 30,000 trees. It contains nine fields for football, rugby and hockey as well as four other fields for collective games. There is also a swimming pool measuring 50 × 20 metres and a large gymnasium for indoor sports. The various Venues are equipped with all modern services, dressing-rooms, massage rooms, saunas, offices, stores, premises for equipment, etc. In the centre of the area is a large building which will become the headquarters of the centre for medical sports studies. Summary of technical data:— - Total area covered:— 220,000 sq. metres; - Swimming pool:— 50 × 20 metres, depth 2 metres and equipped with a perfect water-purifying installation; - 3 football fields, 3 rugby fields, 2 hockey fields, 1 baseball field and other minor grounds; - 1 covered gymnasium, 40 × 20 metres, for gymnastics and four other gymnasiums for boxing, wrestling, etc., all equipped with saunas and dressing-rooms; - a complex of 4 other gymnasiums for theoretical and practical teaching and training; - one accommodation building for athletes consisting of 2 groups of bedrooms for a total of 100 beds and a group of kitchen premises, restaurant, bar, and rest-room; - 1 building destined to the headquarters of the Sports Medecine Institute; - 1 headquarters building for the Grounds Manager; 2 houses for the custodians; - Area reserved as a nursery garden for flowers and plants.
The shooting ranges. The Olympic Shooting Range is located in the same area as that of the former Umberto I Shooting Range in Viale Lazio. Of this former range, there only remains the building reserved for services which was naturally re-moder66
nized. It was built in accordance with most modern technical principles and was designed by architect Maurizio Clerici (with Eng. Giulio Palmonella in charge of the work). The range includes 2 separate installations each measuring 88 × 56 metres. One of these is reserved for 50-metre shooting competitions and is covered by a 10-metre wide transparent roof running the total length of 88 metres. It has a total of 40 shooting lanes. 3 large walls in concrete covered with wood and a back wall, 6.50 metres high and 1.50 metres wide, provide the necessary safety precautions. A special target control system was devised which operated from the shooters position. It consisted of a series of pulleys driven by an electric motor to which the targets were fixed. The system whereby the target could be brought back mechanically to the shooter was extremely useful during training, as each shooter was able to check each shot. During the competitions proper, this permitted rapid execution of firing and saved a considerable amount of time and target personnel. The 25-metre range was constructed behind the first bullet-protection wall and comprised 2 areas, one for free pistol and one for the pistol shooting test of the Pentathlon. The targets in this range were also operated by an electric machine. For the 300-metre rifle shooting competition, a shooting range was built at Cesano, some 25 kms. from the Foro Italico Sports Centre which is reached by a road off the Via Cassia. The Cesano Shooting Range, the property of the Italian Infantry School, had to undergo special improvements which included the setting up of a roof over 58 shooting lanes as well as a bunker for the mobile targets. The venue was equipped with all services useful to the competition and essential to both athletes and public. A communication link system was also installed. The Clay-Pigeon Shooting Competition took place at the shooting range belonging to the Lazio Club, situated in Via Eugenio Vejana 21, immediately adjacent to the Piazzale delle Muse Square and 1 km. distant from the Olympic Village. This venue, completely renewed and equipped with the most modern launching machines, covers an area of some 5,500 sq. metres which comprises space reserved for the public to the extent of some 2,000 persons. Use can also be made of a large terrace situated on top of the Clubhouse.
The E. U. R. Olympic centre. The modern garden city of the E.U.R. became an ideal centre for a group of sports venues which had been constructed not only because of the XVII Olympiad but also to meet the ever-increasing sports requirements of the capital. The project for these buildings was originally drawn up in 1935 for the Universal Exhibition of Rome (E. U. R.), a gathering which was to be called 67
the " Olympiad of Civilisation ", and more commonly known by the abbreviation of " E. 42 ". The plans for " E. 42 " were based on maps of ancient Roman towns which even today are a guide to all good town-planning. At the time it was decided to create a large new quarter which would be both classical and modern in style as well as to achieve two objectives:— to organise an exceptional exhibition and, secondly, once the event was over, to use the buildings as premises for cultural, artistic and recreational Institutes. It was thus that a really important quarter came into being, comprising magnificent buildings such as:— the Palazzo dei Congressi (Congress Palace), the Palazzo delle Scienze (Palace of Sciences), the Palazzo delle Arti Antiche (Palace of Antique Arts) and the Palazzo della Civilizzazione Italiana e delle Tradizioni Popolari (Palace of Italian Civilisation and Popular Traditions). All these are at present the headquarters of important Associations, cultural Institutes and Museums. The outbreak of War prevented final touches being made to the preparation for the exhibition and brought to a standstill the building of this new quarter. However, the work accomplished was not in vain. Immediately after the War, the greater part of the original programme was carried out by the E.U.R. Directorate represented by its Commissioner, Prof. Virgilio Testa, in accordance with the plans for the new town centre, one of the important factors behind the planning being the importance of extending Rome towards the sea. Buildings, villas, trees, stairways, ornamental work, porticoes, terraces, parks and artistic fountains completed the modern quarter of the E.U.R. which, having been created for the " Olympiad of Civilisation " was soon to offer the magnificent resources of its artistic decor to the Games of the XVII Olympiad.
Palazzo dello Sport. The Palazzo dello Sport rises on the hill overlooking the artificial lake and dominates the whole of the E.U.R. zone. The Viale Cristoforo Colombo, which crosses the lake in two arms, encompasses an area where besides the sports venue are included spacious parking lots and gardens. The Management of the E.U.R. completed and embellished this new construction by creating, beneath the building, a characteristic fountain which, with a series of waterfalls, set in a harmonious setting of green, goes to swell the waters of the artificial lake of some 900 metres in length. The Palazzo dello Sport which rises behind the fountain, was planned by Prof. engineer Pierluigi Nervi and architect Marcello Piacentini, with the collaboration of architects Ezio Cosolo and Annibale Vitellozzi. The firm of engineers Nervi and Bartoli were responsible for the construction in concrete, whilst the firm Vincenzo Angrisani undertook the mural works and final touches. 68
The Palazzo dello Sport under construction. State of work on 15th March 1958.
State of work on 29th February 1959.
The direction of works was entrusted to engineer Gustavo Baracchi, while Prof. Nervi was in charge of the study and realisation of the reinforced concrete structures which, besides carrying out their static functions, also serve to confer on the building its special bold and elegant line which is its main characteristic. The major part of the reinforced concrete structures were produced beforehand by means of a carefully planned prefabrication process. All the sections of the dome, composed of 144 evenly prefabricated fenestrated ribs, produce the effect of a considerable reduction in weight and, in addition, the possibility of introducing through the fenestrations the air required for the conditioning of the vast hall. These sections also house 1,800 fluorescent lamps which provide the lighting for the arena. The lamps are set on the inner side of the ribs and remain carefully hidden from the direct view of the public. The lighting of the dome undoubtedly represents one of the most impressive aspects of the huge hall. The same process of prefabrication was used for all the elements composing the tiers of seats as well as the outer support shafts of the façade, some 10 metres high, which support the vast glass walls running all round the outer gallery of the hall. The acoustics of the hall have been carefully studied and are so good as to render possible the organisation of musical concerts. From the outside, the building appears to be encircled by a glass surface interrupted only by the shafts in reinforced concrete supporting the perimetral covering and the ribs of a graceful structure in natural anodysed aluminium. The covering of the dome consists of sheets of light green anodysed aluminium with the interposition of light thermo-absorbent panels for the purpose of protecting the structure against termites. The competition arena, 45 metres in diameter, is suitable for all indoor sports and is covered with a wooden parquet floor. The Palazzo dello Sport is surrounded by an entrance enclosure with gates corresponding with the main external flights of steps. The public is regulated at the entrances and reaches the first sector of tiered seats having crossed the gallery or proceeds to the second sector by way of indoor staircases which lead to a vast circular terrace. In the case of both the first and the second sectors, seats are reached from the top, thus enabling the public to note what seating is unoccupied. A special sector, which is reached from one of the exterior staircases, is reserved for Authorities and the Tribune of Honour with a total capacity of 420 seats, in addition to 196 seats reserved for the Press. The Press stands are directly linked with a large room on the ground floor 500 sq. metres in area and equipped with telephones, telegraph office, telephoto installation, teleprinters, bar, etc. Telecommentators have a series of 12 glass cabins reserved in the room raised above the seats for the Press. 70
The vast interior of the Palazzo dello Sport permits the holding of every kind of indoor sports meetings.
A sector of the gallery which runs right the way round the Palazzo dello Sport.
71
The total capacity of the Palazzo dello Sport is as much as 15,000 places, all seated, in the case of boxing events, to which access is had through broad galleries furnished with cloakrooms, bar and hygienic services. The Palazzo dello Sport is provided with modern systems of signalling synchronised with the referees' chronometers and with those of the timekeepers, besides all the other general information and control devices required by a modern venue of this type. The athletes are accommodated beneath the stands in 20 large dressingrooms, all complete with showers, massage rooms and first-aid premises, whilst the competition referees are provided with meeting rooms, offices and everything else necessary for the most efficient fulfilment of their duties. The Palazzo dello Sport is equipped with one of the largest air conditioning installations so far constructed in a public hall. The air conditioning of the hall is realised by means of 11 conditioners placed in the dome with a capacity of 600,000 cub. metres per hour. These draw conditioned air into the hall through the roof, whilst air is sucked out from under the tiers of seats, with ventilators placed in the heating plant. The Press Room possesses an independent conditioning plant. Work involved a total expense of approx. 1,900,000,000 lire. Summary of Technical data:— -
Area covered 11,680 sq. metres; Cubic capacity 300,000 cub. metres; External diameter 122 metres; Internal diameter of dome 100 metres; Maximum height from competition arena to dome 34.50 metres; Heating capacity of conditioning plant 2,600,000 cal/hr.; Cooling capacity of conditioning plant 1,100,000 fr/hr.
The Olympic Velodrome. The Olympic Velodrome at the E.U.R. was planned by architects Cesare Ligini, Dagoberto Ortensi and Silvano Ricci, winners of the competition organised by the C.O.N.I. between Italian engineers and architects. The precious collaboration of the Management of the E.U.R. facilitated the task of the choice of site. Thus the building took shape in the zone of the Viale dell'Oceano Pacifico, on a total area of 65,000 sq. metres. The work was directed by engineer Francesco Guidi. The executive plan was studied on the basis of the following special features:— a) perfect visibility from any part of the stands surrounding the 72
The Olympic Velodrome being constructed in June 1959.
An aspect of the projecting roof in the central sector of the stands.
course of the track (a problem difficult of solution, as the track varies at each different point of the slope reaching considerable gradients especially in the curves); b) capacity for approx. 20,000 persons divided into four types of places with services and corresponding to the course of the track. In other words, the choice of the Committee was not only governed by aesthetic considerations but, even more important, also by the functional aspect which was immediately evident, especially with regard to the detailed study of visibility at the curves. The group of dressing-rooms is located in an external area for functional reasons and is equipped in the most modern and complete manner with special booths for the stayers and linked either to the quarters of the racers, situated in one bend of the course, by means of two underground passages, or to the track through a broad connecting passage. The Velodrome is also provided with collective dressing-rooms for competition officials, for juries and for those making use of the gymnasium for physical education and for the cyclist athletes in training on rollers. The group of services comprises 20 collective dressing-rooms and single cabins for a total capacity of 300 racers. This group is completed with first-aid facilities, massage rooms and repair workshops, etc. The track, planned by architects Clemens and Herbert Schurmann, is characterised by the track level with gradients increasing from its minor to its major axis on the curve and more particularly by special devices applied at the entrance and the exit of the curves for the purpose of avoiding variations of effort in these points by both stayers and sprinters. The collaboration of the Wood Experimental Institute at Florence, directed by Prof. Guglielmo Giordano, was instrumental in arriving at a choice of the wood to be used for the track, the choice falling on Doussiè from the Cameroons, a compact fibre wood resistant to the elements and to the attacks of fungus. After careful consideration of the various offers of specialised firms, the construction of the track was awarded to Bonfiglio Woodwork Firm of Milan which had already constructed the tracks of the Vigorelli Stadium and the Palazzo dello Sport at Milan. The elevation of the track from the straight is initially 9° 59', reaching its maximum on the curves with 37° 27' and has a straight measuring 64.70 metres. A special curve is placed at the point where the racers come into the track after completing their course on the road. They enter the Velodrome by means of an underground passage situated beneath the East stands. The sports complex has an external length of 970 metres containing nine entrances. Nearby the entrances function four groups of ticket offices with 15 ticket-windows each. Under the stands certain sections have been reserved for all the services and bars in addition to 12 cabins for radio commentators, speakers and the 74
competition manager, whilst the cabin for the photo-finish and timekeeping is situated at the highest point on a level with the finishing line. The space reserved to the journalists comprises a Press Room, a small waiting-room, 24 local and long-distance telephone booths, a teleprinter room, offices for incoming telephone calls, telegraph office, post office and telephoto office. These services are completed by 14 long-distance lines, by 6 local lines and 40 local lines on the Press tables. Particular attention has been paid to the illumination of the inside of the course of the track, so that lighting is uniform with an average of 300 lux units except at the finishing line, where it is almost double. The Stadium is equipped with an indicator board, a photocell signalling device, with clocks, pneumatic and photo-finish equipment, etc. Work undertaken by the Firm of engineer Alarico Palmieri was begun on the 10th August 1957 and the Velodrome was ready for use in the Spring of 1960. The cost of the entire work amounted to 1,050,000,000 lire. Summary of technical data:—
-
capacity:— 20,000 spectators, of whom 5,000 standing; 600 trestles supporting track; total length of inner perimeter of track:— 400 m.; uniform width of track:— 7.50 m.; length of straight:— 64.70 m.; rest lane:— 0.75 m.; elevation of curves:— 37.27'; maximum elevation of straight:—9.55'; total length of external enclosure:— 950 m. with 7 entrance gates.
The Piscina delle Rose. Close to the Palazzo dello Sport lies the " Roses Swimming Pool " which during the Rome Games was used for training and for the elimination rounds of the Waterpolo Tournament. This venue was also planned by the Italian National Olympic Committee not only because of the Olympic Games, but especially for the future sports requirements of the Capital. The Roses Swimming Pool, devised and directed by engineer Mario Biuso, measures 50 m. in length and 25 m. in width and its depth varies from 1.80 to 2 m. in the portion where waterpolo events take place. The venue, constructed in reinforced concrete, is equipped with dressing-rooms (63 cabins) for both men and women, thus allowing the public also to make use of the pool in periods when the venue is not being used for competitions. 75
The swimming pool is equipped with an ultra-modern plant for purification of the water and with 4 towers for illumination during evening events. A special pavilion houses further dressing-rooms reserved for the personnel, premises for members of the management and judges of events in addition to public services, such as cloakroom, bar, etc. The two thousand existing seats in the stands were supplemented during the period of the Olympic Games by provisional stands accounting for a further 1,850 seats. Outside is a large solarium entirely decorated with flowers, foremost among which are roses, giving a particular character to the venue, from which its name is derived. The cost of the work was 90 million lire.
Tre Fontane Sports Zone. To meet the need for creating training areas especially for the Games of the XVII Olympiad, the sports zone of Tre Fontane, similar to that at Acquacetosa, was set up in the area intended for the parking of motor vehicles reserved to E.U.R. The area covering 170,000 sq. metres and its peculiar shape led to a solution planned by architect Maurizio Clerici (with engineers Pagani and Lombardi directing the work) whereby two separate areas were exploited, one becoming a venue for athletics and tennis and the other a series of fields for football, hockey, basketball and volleyball, in addition to a stadium for roller skating competitions. The two venues are intersected by the Via Cristoforo Colombo and are called respectively " West Zone " and " East Zone ". The first comprises a hockey pitch, a rugby ground and a football pitch with stands seating 5,000 persons; three basketball grounds, two volleyball courts and 8 pitches for bowls. A special zone is reserved for roller-skating training and competitions and disposes of a stand capable of seating 5,000 persons. Each of these is equipped with services for athletes and public, dressing-rooms with showers, etc. In the second zone, that is, the " East Zone ", there are thirteen tennis courts including a central court for minor competitions with seating arrangements for 600 persons. In addition, a 400-metre track with 6 lanes and a covered straight, 130 metres long with 6 lanes (for training during bad weather), have been constructed whilst an area has been set up with jumping pits and areas for throwing events. All the venues are equipped with dressing-rooms and normal services as well as with spacious grass lawns for rest and relaxation.
The Basilica of Maxentius and Caracalla Baths. In addition to the series of Olympic venues, certain monuments were also used for the purpose of giving the Rome Games a more particular Roman character. Among these monuments selected in the neighbourhood of the sports centres were the Basilica of Maxentius and the Caracalla Baths. 76
Tre Fontane Sports Zone.
The large modern covered gymnasium in the " Tre Fontane " sports zone...
...and a 130-metre straight with six lanes permits training during bad weather.
The Basilica of Maxentius constitutes a monumental complex among the more imposing in the archeological zone of Rome. The construction, begun by Maxentius in 303 A. D., was interrupted by his death in 312, in the course of the Battle " ad Saxa Rubra ", at the hands of Constantine who emerged victor. In 313, this latter completed the Basilica of which there remains today only one entire side and the main apse of the shorter side, with part of the bold vaults rising more than 35 metres from the ground. Under these vaults three matressed platforms were placed together with all the competition services for the Greco-Roman and Free-style Wrestling competitions. In front of the platforms, stands were erected for the public and press; (the journalists were provided with 20 telephone booths); the dressing-rooms and services for the athletes (400 sq. metres with 8 showers, 7 W. C.s and 5 washstands) were situated in a zone immediately behind the platforms, whilst the amenities for the public were located under the various stands. The whole venue was equipped with a special system of lighting for the evening events, thus rendering the spectacle even more impressive. Gymnastics were held in an incomparable and universally famous setting, the Caracalla Baths, an extraordinary monument representing the grandeur, perfection and functionality achieved by Roman architecture. Inaugurated in 217 by Antonino Caracalla, these were considered the most impressive of their age, with their organic complex of swimming baths, both hot and cold, covered and uncovered gymnasiums, rooms for gymnastics, wrestling, relaxation, etc. This venue for the Games of the XVII Olympiad was achieved with temporary fixtures placed in the left-hand gymnasium facing the stage of the presentday opera theatre. The whole of the competition arena remained clearly visible to all the spectators as a result of beams (for a total of 40 metres in length) fitted with reflectors resting on four pylons with lateral supports. These supports detached the pylons from the old walls which could in no way be used in observance of a ruling given by the Superintendence of Monuments and Fine Arts. The competition arena measuring 36 × 18 m. was carefully studied so as to render the moving of the athletes from one apparatus to another and the position of the judges as convenient as possible. The dressing-rooms covering a total area of 350 sq. metres, the rooms for the jury and all the services including bar and first-aid, were set up within the precincts of the ancient walls, as was also the case for the Press services. About 5,300 persons were able to be accommodated in the special stands, whilst 102 seats were reserved for the Press. The adaptations and sports installations were planned by architect Maurizio Clerici and put into effect by engineer Pasquale Androsoni. 79
The route of the Marathon. For the first time since the modern Olympiads were revived, the Marathon neither started nor finished in the main stadium. Rome prepared for this spectacular event a route rich in classical evocations which finished at the Arch of Constantine. At the starting point of the race, at the foot of the great staircase of the Capitol, a large shed was set up containing couches and communal dressing-rooms. Along the route refreshment points were established which, in practice, turned out to be more than the athletes required. The route passed along the Via dei Fori Imperiali – Via dei Trionfi – Via delle Terme di Caracalla – Viale Cristoforo Colombo up to 2.5 Kms. beyond the Grande Raccordo Anulare – return to the G. R. A. — Raccordo Anulare – Via Appia Antica – Piazzale Numa Pompilio — Viale delle Terme di Caracalla – Via dei Trionfi – Arch of Constantine (finish), for a total distance of 42.192 Kms. Along the spacious finishing straight road in Via dei Trionfi, stands were set up for 12,000 places, and at the finishing line, special Press stands with 20
The building at the Pratoni del Vivaro where the various technical services for the 3-day Event were concentrated.
80
Lake Albano for the rowing regattas.
telephone booths, teleprinter room and Radio and Television points. Two large first-aid tents, a mobile bath, emergency hygienic amenities and sundry services completed the arrangements. The entire area at the Arch of Constantine was barricaded-off and subject to control.
Venues for the equestrian sports. The Dressage Grand Prix and the Grand Prix Individual Jumping events were held in the incomparable setting of Piazza di Siena, in the heart of Villa Borghese, the traditional theatre of Equestrian Events. This marvellous amphitheatre was the ideal site and did not present any special problems even from the point of view of accommodation in view of its vicinity to the Olympic Village. Temporary stands were set up and a similar system was adopted for the providing of services for events and services reserved to the public. By these provisions, the capacity of Piazza di Siena was a total of 15,000 places. The Press had 10 telephone booths at its disposal, of which 6 for long-distance calls. Pratoni del Vivaro was the site of the 3-day riding events. The zone is situated in a valley near Rocca di Papa between Via dei Laghi and Via Latina for a total length of about 10 kms. and covers an area of some 133 hectares, between a frame of mountains. The locality, which is some 35 kms. from Rome, was chosen for the special variety of the ground, which was considered highly suitable for the requirements of the competition, and for the large stretches of grassy meadows and natural obstacles. Pratoni del Vivaro, situated at an average height of 500 metres above sea-level, also guaranteed, even in the periods of greatest heat, an ideal temperature which never rose above 25—26°C. At Pratoni del Vivaro a number of services of a permanent nature were realised, developed and completed on the occasion of the Games with structures of a temporary nature. More particularly, a building was set up to contain all the competition services, a series of stables to accommodate 120 horses, of which 40 in a permanent structure and 80 distributed throughout three blocks of stables made out of prefabricated reinforced concrete. As annexes to the services for horses, a complex was set up for use as storehouses, materials, forage, veterinary infirmary, kitchen and rest premises for the personnel on duty. Participants in the Olympic event of Modern Pentathlon carried out the riding event on a 5 km. course at Passo Corese. This site, 35 kms. from Rome, assured the perfect staging of the event as the route followed already disposed of arrangements that had been made for international events of this nature. 81 6.
Lake Albano for the rowing events. Lake Albano, which is overlooked by Castelgandolfo, was chosen by the Executive Committee of the C.O.N.I. and approved by the Ministry for Public Works, for the holding of the rowing and canoeing events. Already since as far back as 1903 numerous important rowing competitions, from the Italian Championships to European Championships, had been disputed on this characteristic stretch of water, situated in the crater of an ancient volcano. The lake lies at 293 metres above sea level and has a circumference of 10 kms. and a maximum depth of 170 metres. It is especially remarkable in that it is shaped like an amphitheatre which allows thousands of spectators to watch each phase of the events. Work began under the aegis of the Ministry for Public Works in the summer of 1959. Various problems had to be faced such as that of connecting internal roads with the main highways, the construction of a road between the starting and finishing posts, installations for stands, juries, timekeeping, etc. In view of the considerable depth close inshore of the lake, the problem of marking off the lanes created noteworthy difficulties. Having rejected the idea of floating elements bearing the signals indicating the lanes, a plan was devised by engineer Mario Peccia for the realisation of one of the finest regatta courses in existance.
Control and signalling tower in the finishing area of the rowing and canoeing events at Lake Albano.
On the visit of inspection by the Technical Commissions of the F.I.S.A. (on 4th October 1959) and of the I.C.F. (on 11th October 1959), the competition course was judged to be the equivalent of a swimming pool two thousand metres in length with six lanes of 18 metres wide marked out with buoys for the rowing and with 9 lanes 9 metres wide for canoeing. The cables to which the buoys are attached extend over 2,000 metres and are tightened by winches placed on piles of reinforced concrete at 1.50 metres below the level of the water whilst the small buoys, consisting of spheres 25 cms. in diameter, in polystyrol, of various colours, were placed at distances of 12.50 metres. A further three steel cables hold taut perpendicularly the whole system of cables. Installations on land planned by architect Maurizio Clerici were divided into three sectors, namely:— a) at the starting line:— cabin projecting over the lake but in contact with the water lanes; b) boathouse sector:— consisting of a permanent arrangement to be also used after the Olympic Games plus a temporary arrangement for such needs as might arise. The permanent group includes a boathouse for rowing boats (820 sq. metres) and one for canoes (288 sq. metres), dressing-rooms, first aid, offices, bar. In addition to this nucleus were also added 19 sheds measuring 105 sq. m. each with 3 hot water showers and hygienic services; c) finishing line:— fixed stands were erected for 2,000 seats reserved for the Press, TV, authorities and public. In addition, temporary stands were set up for a further 8,000 seats together with a temporary Press Room with 20 telephone booths. A high tower in steel equipped with the most modern control and signalling equipment was erected for the services regarding teleprinter, stencilling, jury, photo-finish, results, photographs, etc. In this same finishing line sector were constructed an assembly room, a small stand for judges and referees, a small harbour to house the motorboats in use for the events, a landing-stage for prizegiving ceremonies and all the services for the public from post office to first aid, information office, bar, etc. Of particular interest was the method adopted to provide stands for the public without breaking up the harmony of the landscape around the lake. Finally two car parks were set up, of which one within the venue for service vehicles. The works were directed by engineer Giuseppe Zanon. Summary of technical data:— - supporting cables - small buoys - large buoys - small rafts for canoeing starter - small rafts for rowing starter - small rafts for disembarkation - landing-stage for prizegiving
26,500 metres 1,500 » 10 » 24 » 6 » 8 » 1 » 83
Routes of the Cycling events. Road races:— The team road cycling event was organised along the Viale Cristoforo Colombo, with start and finish opposite the Olympic Velodrome, and the individual road event on the Grotta-rossa Circuit, this being an almost perfect triangle formed from the beginning of Via Flaminia and the end section of the Via Cassia. For the team race, large stands were set up in the immediate vicinity of the Velodrome with a capacity of 7,500 places. In the area opposite the Velodrome, as the Stadium was used for the technical and organisational requirements of the event, places were provided for the public. The organisation in connection with the road events was far more complex as it was a question of providing for all the internal and external requirements on a much larger scale but nevertheless similar to those called for by an ordinary stadium. Large stands were prepared disposing of 8,000 places reserved to the public whilst the Press had the possibility of using 20 telephone booths, 10 of which were for long-distance calls. The athletes' quarters were situated in line with the starting and finishing posts where the boxes for each nation participating were installed with their various supply and spare part services. As is known, the circuit is just under 15 kms. in length and was repeated 12 times to total 175 kms. At the finishing line a platform in two tiers was set up to contain all news services (photo-finish, television, photographers, etc.). The most dangerous stretches, on account of the fastness of the going, were carefully barricaded off, and the zones organised for refreshment and supply services were also set behind barricades.
The subsidiary Venues. A considerable number of subsidiary venues were prepared and used for the training of athletes. Terme Stadium:— close by the Caracalla Baths in a wooded zone of the Passeggiata Archeologica. It was constructed in the years 1938-9, and disposes of a track 400 metres long with six lanes, two pits for long jump and hop-stepand-jump, a pit for high jump, a pit for pole vault, one javelin lane, two circles for throwing the discus and hammer and, finally, three circles for putting the shot. Farnesina Stadium:— located in the area of Foro Italico at about one km. from the Olympic Village. It is well equipped with services for athletes and public and is destined exclusively to training for running and jumping. Facilities include:— a 400-metre track with 6 lanes; two pits for long jump 84
and hop-step-and-jump; a pit for pole vault; a pit for high jump; two circles for discus and hammer; two for putting the shot; two lanes for throwing the javelin and a course for the 3,000 metres steeplechase. Eucalyptus Stadium:— constructed near the Basilica of San Paolo, at about 9.5 kms. from the Olympic Village, includes besides a football pitch, venues for running and jumping:— a 400-metre track with 6 lanes; two pits for long jump and hop-step-and-jump, two for high jump, one for pole vault, two for discus and hammer, two for putting the shot, two for throwing the javelin. The venue can accommodate some 5,000 spectators. " Silvano Abba " Military Stadium:— set up at the Cecchignola, at some 14 kms. from the Olympic Village. It includes, besides the regulation football pitch, necessary facilities for training in running and jumping and a 400-metre track with 6 lanes. Fire Brigade Ground:— situated in the area of the School of the National Antincendiary Corps, near the Hippodrome of the Capannelle on the Via Appia Nuova. The ground is completely equipped for running and jumping, with a 6-laned track of 400 metres. Stella Polare Stadium:— is situated at the Lido of Rome in the Castelfusano pinewoods, at about 30 kms. from the Olympic Village and 500 metres from the sea. The technical facilities include a football pitch, a 400-metre track, with six lanes, a pit for long jump and hop-step-and-jump and one for pole vault, two for high jump, two for discus and hammer, three circles for putting the shot. The services for athletes are located in the pinewood and are surrounded by large green spaces for rest and relaxation. The stadium has a total maximum capacity of 10,000 persons. Tor di Quinto Fields:— at two kilometres from the Olympic Village are the venues of Tor di Quinto, which include two football fields, complete with dressing-rooms, storehouses and independent offices for each field. In addition, a further group of sports venues were used for the training of the athletes, such as gymnasiums, basketball pitches and rooms for wrestling and boxing located in various parts of the city.
Stadiums for the Football Tournament. For the Olympic Football Tournament, the stadiums at Florence, Grosseto, L'Aquila, Leghorn, Pescara and Naples were used as well as the Flaminio Stadium in Rome. In the above-mentioned stadiums, the elimination round was disputed for a total of 24 matches. The semi-finals took place at Naples and at Rome. The finals for 1st and 2nd places and the prize-giving ceremony were held at the Flaminio Stadium. 85
Here follows a list of the capacity and distance from Rome of the stadiums chosen for the elimination round:— Florence, Communal Stadium:— capacity 60,000 spectators; Cassia State Highway 300 kms., distance by rail 316 kms. Grosseto, Communal Stadium:— capacity 18,000 spectators; Aurelia State Highway 183 kms.; distance by rail 188 kms. L'Aquila, Communal Stadium:— capacity 20,000; total distance from Rome 144 kms., of which 86 kms. along the Salaria State Highway to Rieti and 58 kms. along the Sabina State Highway; distance by rail 216 kms. with direct linking service by the " Freccia del Gran Sasso " express train. Leghorn, Ardenza Stadium:— capacity 25,000; Aurelia State Highway 316 kms.; distance by rail 316 kms. Pescara, Adriatico Stadium:— capacity 21,000; Tiburtina Valeria State Highway 236 kms.; distance by rail 240 kms. Naples, Fuorigrotta Stadium:— capacity 90,000; total distance from Rome 232 kms., of which 158 kms. on the Appia State Highway to the Minturno Crossroads and 74 kms. along the Domiziana State Highway; distance by rail 214 kms.
Works in the bay of Naples. The yachting events took place in the waters of the Bay of Naples and, more exactly, in the zone overlooking Santa Lucia. In order to meet the needs for anchorage and shelter of the boats taking part in the Olympic Games and those of tourists, various technical economic solutions were effected by the Ministry of Public Works, once again well aware of the problems of the Games, all of them intended to enforce the receptive capacity of the small ports around Naples. The Ministry of Public Works, with the financial aid of the C.O.N.I., developed and rendered more efficient the four ports of Molosiglio, Santa Lucia, Mergellina and Posillipo. In the case of Molosiglio, the project approved and passed by the High Council of Public Works provided for the reinforcing of the existing reef; for the construction of the high-tide rock-wall nearby the reef, constructed in two sections for a total length of 225 metres; the construction of a small quay of 45 metres parallel to the reef of San Vincenzo Quay and, lastly, the construction of an open landing-stage 175 metres long behind the quay which assured safe anchorage to the Olympic boats centred at Molosiglio.
Indicator boards. The important problem of the diffusion of results was resolved with the construction of special indicator apparatus, under the direction of specialised Firms. This apparatus, electrically controlled at a distance, allowed the public 86
to obtain the results of the events more rapidly than was ever the case in preceding Olympic Games. Of special interest are the electric indicator boards already existing in three competition areas, i. e. Olympic Stadium, Swimming Stadium and the Regatta Course on Lake Albano. The Olympic Stadium disposes of two indicator boards installed at the top ends of the main axis of the stadium. Each board, measuring 15.70 m. × 7, is composed of a luminous panel of 12.97 m. × 6.50. The controls, one per panel, are installed in a special position beneath the panel. Each panel consists of a metallic frame containing 243 luminous units set on 9 horizontal lines of 27 units per line and a clock connected with the electric equipment for measuring the times of events. Each luminous unit, measuring 35 × 49 cms. is composed of 35 cells containing a total of 35 bulbs of 125 V/60 W. The letter using the greatest number of bulbs is the letter " B ". The full lighting of all units would account for 3,000 bulbs with a total absorption of 180 Kw. The controls are composed of the following:— - an electronic decodifying device which transforms the telegraphic code into a static code of 35 elements for the control of each unit; - rotating selectors for the selection of lines and units; - relays for the control and checking of rotating selectors; - manoeuvring units (insertion, checking, safety, signalling) to guarantee the utmost efficiency of the installation and the prompt intervention in case of breakdown; - current divided into two sectors:— current for bulbs amounting to 200 Kw.; maintenance of continuous current of 60 W/14 Kw to the controls. It is possible to vary the intensity of the light by means of special transformers, to guarantee the best visibility on the panels in relation to the illumination of the whole stadium from midday sunshine to night-time darkness. The control centre is composed of a metallic table containing a teleprinter and the control and manoeuvring panels. The writing on the board is obtained either by using the keyboard by hand or by means of the perforation system. Whilst with writing by hand the speed varies according to the operator, in the case of the perforation system, a speed of 400 letters per minute is obtained, which means that the complete writing of all 243 units would require approx. 40 seconds. The text transmitted can appear on the board at the same time as it is being written on the keyboard, or the text may be flashed on to the signalling board all at once at the end of the transmission. These installations, weighing 10 tons each, have been manufactured by the firm of " Siemens ". In the Swimming Stadium, the electric indicator boards were set up for the registration of the swimming and diving results. The installation includes:— (a) the luminous signalling panel; (b) the control centre. 87
One of the indicator installations, worked electrically by remote distance control, for announcing results in the Olympic Stadium.
88
The signalling panel consists of a metallic frame containing 270 luminous units and 2 clocks, one of which is linked with the electric device for measuring the times of events. Each unit measures 20 × 28 cms. with 35 cells containing the same number of bulbs. The control centre, set up on frames carefully positioned behind the panel, is composed of:— compound rotative selectors; control and inspection relay; manoeuvring, insertion, signalling and inspection units; a maintenance complex with alternate current for about 100 K.W., with continuous current for the maintenance of the centre at 60 V/14 Kw. The intensity is variable in order to guarantee the maximum visibility and the clearness of the announcements on the panel by day or night. The teleprinter control transmitting centre allows for both writing by hand and mechanically by means of the perforation system which can be directly prepared with the teleprinter at a speed of 400 letters per minute, or with texts prepared on tape. For the diving contests, use was made of further equipment:— the seven seats of the diving jury were equipped with a points keyboard which was connected to another keyboard at the referee-judge's seat. This, in turn, was connected to the indicator board. This equipment functioned as follows:— each judge pressed the key which expressed his award of points and these results were transmitted to the referee-judge's panel. Once the average was established by the referee-judge, he in turn transmitted this result to the indicator board. This equipment is also manufactured by Messrs. SIEMENS. An indicator board of smaller proportions was set up at Lake Albano which consisted of light units directly controlled by a panel on which the indicator board units were reproduced. The board is a complex of luminous numbers functioning by means of a series of relays worked by a keyboard. For the first time in the history of rowing events, an electric indicator board was used which, among other things, gave the partial results of the rowing events at the 500, 1,000 and 1,500 metre marks. Of great technical interest, though perhaps of lesser constructive importance, is the system of lining up and starting, organised by means of six loudspeakers on which various lights appear for the guidance of the starting judges and corresponding to the three regulation starting orders. The apparatus is manufactured by the Standard Elettronica Italiana Co.
The Olympic Village. On 30th October 1957, following on a series of previous meetings in the course of which various solutions had been examined, the special Committee, presided over by Minister Togni, chose for the construction of the Olympic Village the zone of " Campo Parioli ", in the Flaminio quarter in the North of Rome. 89
Work was started on 10th May 1958 after the solemn ceremony of the laying of the first stone. A parchment with the signatures of the Authorities and the designers was placed inside an ancient Roman cippus on which was written the inscription " Olympic Village 1960 ". The Roman cippus now stands in the centre of the Village whose roads are called after the great benefactors to the Olympic Idea and the greatest Olympic champions of the past. In the realisation of the general project, only 25 % of the 30,000 sq. metres of the total surface has been built on, while the remaining 75 % has been used for a large road network. The Village was constructed by the I.N.C.I.S. (State Housing Institute) on plans drawn up by architects Vittorio Cafiero, Adalberto Libera, Amedeo Nuccichenti, Vincenzo Monaco and Luigi Moretti. It was brought to completion in record time thanks to the encouragement of the Minister of Public Works and the collaboration of the Commune and the C.O.N.I. At this point, we consider that some idea should be given of the works realised by the I. N. C. I. S. as regards the building construction and those realised by the C.O.R. (Rome Olympic Constructions) for completing the efficiency of the new quarters. The permanent works constructed by the I.N.C.I.S. consist of 33 buildings with two, three, four and even five floors, for a total of 1,348 flats, 4,723 rooms, 2,960 rooms intended for services, the whole accounting for a total area of 582,568 cub. metres. These buildings have in common the characteristic of being built on reinforced concrete pillars (2,760 pillars in all) so as to leave free and easy access to the ground terraces. The entire area contains 13 Kms. of asphalt road varying in width between 12.80 and 3.50 metres. Roads, squares and pavements occupy a surface of 110,500 sq. metres; while 160,000 sq. metres are covered by gardens. 4 kms. of gas tubing, 5 kms. of electric cable, 9 kms. of piping for the hot-water system, 5 kms. of piping for the distribution of water and, lastly, 20 kms. of drains are laid in the subsoil. This vast complex of works, to which should be added the construction of four hot-water boiler centres, was begun in September 1958 and was concluded in June 1960 with the use of 33 Firms, an average of 900 workmen per day, 500,000 working days (men × days) and a large quantity of machines and equipment for the building construction. The complex of buildings and installations constructed by the I.N.C.I.S. proved more than sufficient to satisfy the requirements of a large residential quarter, intended for families living autonomously. It was not, however, as ideal for the period of time when these same buildings and plants served the particular requirements of as numerous a community as that constituted by the participants in the Olympic Games. It was therefore necessary to com90
plete the permanent works with other absolutely essential items and namely:— - a pavilion for reception offices, situated at the main entrance to the O.V., consisting of 4 lozenge-shaped buildings prefabricated with tubular metallic structures covered by wood and completed with plastic material. Intended for the reception, information, visitors, bank, post and telephone services, this pavilion occupied a space of 1,200 sq. metres. - ten restaurant pavilions, situated on both sides of the Viaduct of Corso Francia measuring 36 × 34 metres, constructed on supporting structures in cement with walls in tiles and large glass panes, covered with light metallic wire structure and corrugated iron; intentionally placed one against the other so as to allow the supply of provisions by the single entrance corridor for both restaurants. Each had a central kitchen, two canteen rooms, refrigerating plant at one end and hygienic installations at the other. The area occupied by the restaurant pavilions was 20,000 sq. metres with a covered area of 12,780 sq. metres. - storehouses of the various services, displaced in two zones situated outside the two opposite sides of the Olympic Village, so as not to interfere with the movement of traffic within and outside the Village itself. In all, 13 of these were set up, these being of variable length, with moveable elements, mounted on cement blocks and with tiled floors. A first group of 4 sheds was destined as a central depot for foodstuffs at one side; while on the opposite side a second group of 9 sheds was used as general stores for material, as canteen and showers for the staff employed in the Olympic Village Section, for showers and saunas for the athletes, as stores for the deposit and withdrawal of personal effects sent by the athletes to laundries and, lastly, as a depot for the Customs Service. The thirteen sheds covered a total area of 4,120 sq. metres. In order to assure the isolation of the entire area of the Olympic Village and also to isolate within this same Village the Woman's Quarter, the zones of offices, storehouses and lodgings of staff responsible for the organisation of the O.V., a metal fence was used, held up by poles with a trelliswork of wiring and set on cement bases. This type of enclosure even if presenting a certain elegance, was liable to give a somewhat unpleasant impression and, for this reason, the fencing was covered throughout by a high hedge of creepers. The total length of the enclosure was 4,300 metres and involved the placing of 2,150 poles. Along the inside and outside enclosures there were a total of 27 entrance gates, many of which were provided with wooden sentry-boxes to protect the staff on duty against heat and rain. The above described temporary works were realised in stages, installations of the prefabricated type being chosen for the rapidity of their mounting and for the fact that they could be negotiated on the economically advantageous basis of " returnable goods ". 91
CONSTRUCTION FIRMS AND SUPPLIERS OLYMPIC STADIUM IMPRESA GARBARINO-SCIACCALUGA-MEZZACANE – Mural
works. SOCIETÀ FUSI & MACCHI – Hygiene installations. SOCIETÀ BUINI & GRANDI – Electrical installations, exter-
nal illumination. SOCIETÀ DE MICHELI – Heating installations. SOCIETÀ CURTISA – Metallic works. DITTA PAOLO VILLANI – Wooden works. DITTA F.LLI ADRIANI – Seats for tiers. SOCIETÀ PHILIPS – Sound installations. DITTA SCIARRA – Glass requirements. SOCIETÀ SIEMENS – Scoreboards.
PALAZZO DELLO SPORT IMPRESA INGG. NERVI & BARTOLI – Reinforced concrete
works. IMPRESA ING. VINCENZO ANGRISANI – Mural works. SOCIETÀ CASILLO – Electrical installations. SOCIETÀ SIEMENS – Sound installation. SOCIETÀ SOLARI – Scoreboards.
SOCIETÀ DELL'ORTO & CHIEREGATTI – Air-conditioning
DITTA ROSA & BIANCHI – Electrical plants. SOCIETÀ SIEMENS – Sound installations. SOCIETÀ DALMINE – Light projector towers. SOCIETÀ LINOLEUM – Rubber and linoleum flooring. SOCIETÀ BONFIGLIO – Track in wood. SOCIETÀ F.E.A.L. – Alluminium covering SOCIETÀ MET.-CO. – Metallic covering.
FLAMINIO STADIUM IMPRESA INGG. NERVI & BARTOLI – Mural works. SOCIETÀ C.G.E. (General Electric Co.) – External lighting installations. SOCIETÀ SIEMENS – Sound installations. SOCIETÀ DE MICHELI – Air-purifying plant – water heat-
ing plant for internal swimming pool. PALAZZETTO DELLO SPORT IMPRESA INGG. NERVI & BARTOLI – Mural works.
SOCIETÀ SIEMENS – Sound installation. OFFICINE MECCANICHE BARBIERI –
SOCIETÀ ELECTRA – Electrical installations.
and heating plants. SOCIETÀ SARE-LAVAGNOLO – Hygiene installations. SOCIETÀ CURTISA – Metallic works. SOCIETÀ I.L.V.A. – Metallic works. SOCIETÀ IOMSA – Metallic works. SOCIETÀ SCIARRA – Glass requirements. SOCIETÀ FONTANA – Glass requirements light fixtures. SOCIETÀ LINOLEUM – Flooring.
SOCIETÀ GAZZOTTI – Competition arena in wood. SOCIETÀ FRASSINETI & ROSCIOLI – External enclosure. SOCIETÀ DELAITI AUGUSTO – Metal covering of dome.
Heating and air-
conditioning plant.
OLYMPIC VILLAGE CIARDI (Società in nome collettivo) – Principal works on Lot I. SOCIETÀ LAZIALE
COSTRUZIONI
GENERALI – Principal
works on Lot II. ING. EUGENIO MORANDI – Principal works on Lot III. DOMENICO ADRIANI – Principal works on Lot IV. I.CO. – Principal works on Lot V. BLOCCHI TOGNI S.p.A. – Supply of water reservoirs. MANIFATTURA CERAMICA POZZI – Supply of hygiene re-
quirements. SWIMMING STADIUM IMPRESA LOY-DONA & BRANCACCIO – Mural works. SOCIETÀ BUINI & GRANDI – External lighting installations. DITTA ELETTROTECNICA MARCHI – Electrical plants. SOCIETÀ SIEMENS – Sound installations and scoreboards. SOCIETÀ DE MICHELI – Piping requirements for air puri-
fying plant. SOCIETÀ CASTAGNETTI – Air-purifying plant and water
circulation. SOCIETÀ DALMINE – Light projector towers. SOCIETÀ SCIARRA – Glass requirements. DITTA PIERMATTEI & C. – Metallic works.
OLYMPIC VELODROME IMPRESA ALARICO PALMIERI – Mural works. SOCIETÀ BUINI & GRANDI – External lighting installa-
tions.
92
RUBINETTERIE MAMOLI S.p.A. – Supply of taps for Lots I and III. VALVES POLIBAN DI RATTI & C. – Supply of taps for
Lots II, IV and V. FONDERIE E SMALTERIE GENOVESI S.p.A. – Supply of
bath tubs. DELL'ORTO E CHIEREGATTI S.p.A. – Heating plant for Lot I. ALFREDO VASINTONI S.p.A. – Heating plant for Lot II. ASTER S.p.A. – Heating plant for Lot III. GIUSEPPE DE MICHELI & C. S.p.A. – Heating plant for Lots IV and V. SUPERVIBRO S.R.L. – Supply of Pentaforo piping. Bosco S.p.A. – Supply of water meters. PROFIL-LAMINA ITALIANA S.p.A. – Supply of metal fixtures for Lots I and II. ALDO GALANTA S.p.A. — Supply of metal fixtures for Lots III, IV and V.
AKRON – Lifts for Lots IV and V. BECCHI S.p.A. – Supply of gas cookers for Lots I, III and IV. FERDINANDO ZOPPAS & FIGLI S.p.A. – Supply of gas
cookers for Lot II. TRIPLEX S.p.A. – Supply of gas cookers for Lot V. P. SCIARRA, SPECCHI, CRISTALLI & VETRI S.p.A. – Supply
of glass works. L'ARTE NELLA CASA S.R.L. – Supply of wall paper for
Lots I, II and III. SAGAR DI A. GIULIANI – Supply of wall paper for Lots IV and V. CASILO COMM. VINCENZO & C. – Supply of loudspeaker
equipment. E.DI.CA. S.R.L. – Levelling works on grass intended areas. I.O.M.S.A. S.p.A. – Supply of metallic blinds for shops. SAIRA S.p.A. – Supply of metal fixtures for shops. TUDINI TALENTI — Road works and drains. ING. LUCIANO SPINA – Mural works for general services quarters. F.E.A.L.-I. VERLONGA (Socc. Acc. Sempl.) – Iron works for general services quarters. ELETTROTECNICA MARCHI – Light installations for general services quarters. OTHER VENUES SPINA ING LUCIANO – Mural works in Stadio dei Marmi. TU.CO – Dismountable tribunes. LA METALSTRUTTURA – Covered track at E.U.R. grounds. AKRON – Lifts for Swimming and Olympic Stadiums. OFFICINE CALLIGARIS – Furniture for Palazzo delle Federazioni. SOLFLEX – Curtains for Palazzo dello Sport. OMEGA – Timekeeping equipment. MAGAZZINI INDUSTRIALI RIUNITI – Sanitary apparatus
for Palazzo dello Sport and Stadio dei Marmi. NOVALUX – Lighting apparatus for the Palazzo delle Federazioni. SAINT GOBAIN – Glass requirements.
SAIONI ODOARDO – Furnishings for various venues. OMNIA PLASTIK – Furnishings for various venues. MAGNETI MARELLI – Sound equipment.
BRINI & UMMARINO – Stella Polare sports ground at Ostia Lido. OBOR – Lighting plant for Palazzo dello Sport. CHIZZOLINI – Prefabricated buildings at Castelgandolfo. TUDINI & TALENTI – Road works.
SGARAVATTI – Garden works. ANSALONI – Garden works. AQUILA EGISTO – Water and hygiene installations. DI FAZIO & BIANCHI – Iron works.
CUCINOTTA – Wooden works.
LA MILANESE – Press Room. IRFA – Bar Counter at Palazzo dello Sport. PIZZETTI — Furniture supplies for Palazzo dello Sport and Palazzo delle Federazioni. NOSTINI ING. RENZO – Umberto I Shooting Range, Piscina delle rose and Acquacetosa pool. I.M.P.A. – Signalling equipment – Name-plates – Stamps. ARCIERI – Mural coverings at Palazzo dello Sport. RIDOLFI – Painting at Palazzo dello Sport. ISFER – Coverings at Palazzo dello Sport. RICCI ALBERTO – Water-proofing.
S.A.I.E.P. – Pneumatic post installation at Velodrome and Swimming Stadium. BELISARIO DUILIO – Construction of Palazzo delle Federazioni. FACE STANDARD – Telephone exchange at Palazzo delle Federazioni. ATER — Air-conditioning plant at Palazzo delle Federazioni. CURTISA – Metal fixtures at Palazzo delle Federazioni. MOLTENI & NIPOTI – Furnishings for Palazzo dello Sport. STANDARD ELETTRONICA ITALIANA – Various results
boards. R.I.M.A. — Furnishings for Palazzo dello Sport. DI ZITTI ING. MARIO – Mural works at various subsidiary venues. GIOACCHINI ING. ANTONIO – Roads for subsidiary venues. SOUNDEX ITALIANA – Soundproof covering at Palazzo dello Sport. VETRARIA LATINA – Glass works.
TENNISQUIK – Tennis grounds. INDUSTRIA PRODOTTI SIDERURGICI – Iron works.
VILLANI PAOLO – Wooden works.
COSENTINO ALVARO – Mural works at subsidiary venues LA NUOVA SILVESTRE – Mural works at subsidiary venues. E.D.I.C.A. — Mural works at subsidiary venues. S.I.R.A. – Pumping installations. C.O.I.M.A.S. – Mural works at subsidiary venues. TECNEDILE – Mural works at subsidiary venues. VENTURI – Sports equipment. SIAMA-MASS – Barges at Castelgandolfo. FRAUSIN ING. MARIO – Plastic spatulas for subsidiary venues. R.A.D.A. – Plastic spatulas for subsidiary venues. ONDOLUX – Plastic sheeting for subsidiary venues. PASQUALUCCI ING. ENRICO – Mural works at subsidiary venues. MERLINO ING PIETRO – Mural works at harbours in Naples. SAVARESE LUIGI – Mural works at harbours in Naples. AUTELCO – Telephone exchange installations.
93
MANAGEMENT OF OLYMPIC VENUES
T he administration of the Olympic venues was entrusted to the Sports Venues Management Service of the Italian Olympic Committee which had been incorporated into the operative establishment of the Olympic Organisation. A provisional but detailed technical plan was worked out which took into consideration all problems connected with the running of the venues themselves. Obviously none of the already existing sports venues were equipped to the extent required for such a large number of athletes in competition and the venues under construction were not planned to contain technical equipment suited to such diverse requirements. The work, however, was prepared with care and there were no surprises notwithstanding the concurrence of the sports competitions and the unknown factors of the time-table (advances or postponements to the programme, delays in the holding of certain competitions). So as to be able to execute the various responsibilities connected with management, which in any case were strictly bound to an operational work plan during the period of training and during the period when the competitions took place, the Venues Management was set up in accordance with directives laid down by the Organising Committee. The organisational chart will be found on page 98. The Management Service, in direct agreement with the Technical Services Section, studied the equipment requirements of competition venues as well as those of subsidiary venues; it worked out a budget for the purchase of necessary material once it had made an inventory of the equipment already existing in each single venue; it established contact with the respective National Sports Federations to obtain approval, from a technical point of view, of the equipment already existing and that which had to be purchased by the Technical Services Section; lastly, is attended to the distribution of the equipment to each venue. The organisation system of the Venues Management necessitated the employment of 815 civilians, employees and workmen, and 360 military personnel. Their various duties and the manner in which they were distributed will be seen from Table No. 1. The personnel, most of them qualified, were trained to thoroughly acquaint themselves with the time-table of events and were also trained to know the 97 7.
HEAD OF SERVICE
Giovanni Poli
Vittorio Preto
ORGANISATION
SECRETARIAT
FIRST AID
Raffaele Niola
FIRE BRIGADE
COMPETITION VENUES
FORO ITALICO ZONE OLYMPIC STADIUM
E. U. R. ZONE PALAZZO DELLO SPORT
SWIMMING STADIUM
CONTRACTS AND ACCOUNTING
AUTOMOBILE CLUB
PALAZZETTO DELLO SPORT FLAMINIO STADIUM
Antonio Carneroli
VELODROME PALAZZO DEI CONGRESSI
TRAFFIC LAKE ALBANO BATHS OF CARACALLA
WORKS AND MAINTENANCE
PUBLIC ORDER
PIAZZA DI SIENA STADIO DEI MARMI
BASILICA OF MAXENTIUS
BARS MARATHON
Giorgio Besi USHERETTES
COURSE
C. COLOMBO CIRCUIT
MATERIAL AND EQUIPMENT
PASSO CORESE TICKETS UMBERTO I RANGE
Dante Pandimiglio EQUIPMENT
TRANSPORT
ROSE SWIMMING POOL
GROTTAROSSA CIRCUIT
CESANO RANGE
ACQUASANTA GOLF CLUB TRE FONTANE
LAZIO RANGE NAPLES
INDICATIONS PRATONI DEL VIVARO
Domenico Stilo TRAINING GROUNDS
TRAINING GROUNDS
TECHNICAL SERVICES LIAISON DIRECTORATE
various phases and development of work for setting up equipment in accordance with the time available in order to avoid, particularly at crucial moments of the competitions, harmful delays in the organisation of work. These experimental measures gave rise to complete elimination or the reducing of any break or delay that would otherwise have been harmful to the steady carrying out of activities connected with the development of competitions. In fact, the programme planned permitted quick and precise allocation of technical equipment as required in the various venues. 98
TABLE NO. 1
PERSONNEL EMPLOYED FOR THE MANAGEMENT OF VENUES DUTIES
EMPLOYEES
Administration of Management Equipping of sports venues Equipping of training venues Printing works Various controls Liaison with Sports Federations Typists Designers for indicator placards Maintenance of tracks and arenas Maintenance of grounds Maintenance of gymnasiums Maintenance of loudspeaker and telephone installations Maintenance of electrical installations Maintenance of heating and air-conditioning plants Maintenance of hydraulic installations Maintenance of dressing rooms and hygiene installations Maintenance of purifying plants Maintenance of lifts and passages Storeroom attendants Swimming pool attendants Equipment moving attendants Placing of indicator placards attendants Cloakroom attendants TV - telephoto - photofinish attendants Ushering of athletes attendants Traffic control attendants Custodians and guards Drivers Motorcyclists Cyclists Mechanics Women attendants for Ladies dressing rooms Maintenance of grass fields and flower beds Maintenance of water installations Cleaners TOTAL
WORKMEN
MILITARY PERSONNEL
STAFF FROM VARIOUS COMPANIES
23 22 30 5 12 8 12 16 16 27 11
24 50
10 21 10 15
10 8
41 7 2 10 15 18 10 12 9
125
6 8 4
45
40 16
30 26 27 9 7 2 8 22
10
76 4 247
———————————————————— 128
309
360
369
99
Officials of the Sports Venues Section:—-from the left, Giuseppe Tosi, Tullio Tuti, Pietro Longhi, Giuseppe De Ruvo, Maurizio Clerici, Bruno Bruni, Lamberto Puecher, Giovanni Poli, Ennio Foglietti, Renato Magini, Giorgio Besi, Renato Impiccini, Leone Massetti, Franco de Giordano, Giuseppe Tartaglia, Raffaele Niola.
Maintenance of the venues. In order to ensure the smooth running of the various events, the Venues Management dedicated the greater part of its activities to daily maintenance of the fields, tracks, arenas and equipment in general so as to keep everything in perfect order. It also attended to maintenance of dressing rooms, showers, saunas and sanitary arrangements. A no less responsible task was that of installing signalling equipment and measuring devices as well as the maintenance and checking of loudspeaker apparatus and internal telephone communications. A further duty of the Venues Management was that of attending to the night illumination of competition arenas and internal signalling requirements, as well as the maintenance of bar and restaurant services set up in each sports venue. Special technical arrangements were catered for so as to ensure a constant supply of water, light and gas throughout. The various sports venues were linked to two separate sources of supply so that, in case of any interruption 100
or break, it was immediately possible to switch on the second source of supply which was held in reserve. In fact, no complaint was ever raised during the few occasions that recourse had to be had to this safety precaution. During the period of training, in order to give athletes the maximum assistance possible, dressing rooms complete with showers had to be set up and even built, (or in certain cases improved upon). This complex of venues proved satisfactory to all concerned (Table No. 2). So as to complete the picture of the activities undertaken for the maintenance and management of the sports venues, it should be remembered that TABLE NO. 2
DRESSING ROOMS AND SHOWERS
VENUE
DRESSING ROOMS
CAPACITY
SHOWERS
(ATHLETES)
Olympic Stadium
11
220
47
Stadio dei Marmi
36
700
95
Velodrome
21
250
27
Palazzo dello Sport
24
360
48
Flaminio stadium & Palazzetto dello Sport
16
240
72
Acquacetosa and C.R.A.L.
40
800
97
Stadio delle Terme
3
160
7
Farnesina stadium
6
180
6
Eucalipti stadium
4
80
10
Via Sannio gymnasium
7
105
13
21
320
52
8
120
20
Foro Italico swimming pool
124
300
56
1st floor pool (Foro Italico)
57
130
9
Swimming Stadium
132
300
50
Piscina delle Rose
64
300
13
Baths of Caracalla
14
280
8
Basilica of Maxentius
32
200
6
6
120
18
19
380
20
4
120
10
20
400
25
669
6.065
709
E.U.R. grounds Stella Polare – (Ostia)
Lake Albano Palazzo dei Congressi S. Croce in Gerusalemme gymnasium Other grounds and gymnasiums TOTAL
101
particular care was devoted to the large number of lawns and wooded areas either forming part of the venues or immediately adjacent to them. Work of this nature, which called for constant attention by specialised labour fully equipped for the purpose, was carried out from 15th May to 15th September 1960 (Table No. 3). TABLE NO. 3
MAINTENANCE OF GREEN AREAS
Work Days
VENUE
Acquacetosa
3,706
Olympic Village
2,997
Hedges
Chemical manure
lin. m.
qtls.
4,636
Lawn mowers
Watering appliances
Rubber tabes
Fixed piping
lin. m.
lin. m.
9
24
1,220
3,600
4
16
480
8,900
Tor di Quinto
544
875
3
4
320
1,200
Umberto I Firing Range
210
190
1
2
110
800
Foro Italico
960
1,220
5
6
350
Olympic Stadium
360
310
4
10
300
Stadio dei Marmi
240
620
1
2
260
Farnesina Stadium
360
358
2
2
170
750
Swimming Stadium
993
1,072
4
12
380
1,050
Flaminio Stadium and Palazzetto dello Sport
581
830
4
3
298
1,200
Baths of Caracalla
360
500
2
3
90
600
4
400
720
10,100
Eucalipti Stadium
360
412
2
Piscina delle Rose
247
320
1
2
90
350
1,814
3,495
1
12
590
2,800
Velodrome
745
83
2
8
340
1,600
Palazzo dello Sport
358
415
1
4
160
850
Stella Polare
596
60
2
4
193
920
Piazza di Siena
363
1
2
150
260
Pratoni del Vivaro
245
Castelgandolfo
113
Tre Fontane
120 1
Stores TOTAL
16,152
15,396
168
35
16
30
1,000
66
150
7,056
35,700
The classification and distribution of all the sports equipment necessitated carefully planned and timed work undertaken by extremely specialised personnel. The sports equipment already existing in each venue, together with 102
New sight measuring device for long jump. Equipment and equipment carrier for athletics.
103
the new equipment purchased by the Technical Services Section, was more than sufficient to cover requirements, as will be noted from Table No. 4. Naturally, certain equipment or material of common use or of irrelevant technical importance has been omitted from the list.
Mr. Rosenquist, Secretary of the National Olympic Committee of Finland, examines the javelins to be used in the Rome Olympic Games.
104
TABLE NO. 4
SPORTS EQUIPMENT
TECHNICAL MATERIAL
QUANTITY
SUPPLIER
ATHLETICS Tracks and arenas for the following stadiums:—Olympic – dei Marmi – Farnesina – East park Tre Fontane – Eucalipti
5
Ing. Guido De Bernardi – Turin
Tracks and arenas for the following stadiums:— Acquacetosa – Silvano Abba – Stella Polare Track and Field illumination towers at Olympic Stadium
3
Romana Impianti Sportivi – Rome
4
Buini & Grandi – Bologna
Measuring device for discus, javelin and hammer
1
Measuring device for long and hop, step & jump – Russian type Competition and training pole vault uprights
The London Instrument Company Limited (Cantabrian) Cambridge
5 12
F.lli Onofri – Rome Romana Impianti Sportivi – Rome
Competition and training high jump uprights
16
Romana Impianti Sportivi – Rome
Competition hurdles
100
Fast – Trieste
Training hurdles
384
Fangarezza – Modena Romana Impianti Sportivi – Rome
Spare battens for hurdles
500
Fast – Trieste
Competition and training discuses (M. 20-L. 20)
40
Sportarticles Co. Ltd. – Helsinki
Competition discuses (M. 20-L. 20)
40
Broderna Sandstroms – Stockholm
Training discuses already existing in venues (M. 61-L. 45) Ash wood javelins (M. 100-L. 65)
106 165
Sportarticles Co. Ltd. – Helsinki
Metal javelins (M. 40-L.30)
70
See Fabriks Aktiebolag – Sandviken (Sweden)
Competition and training hammers
40
Primo Ferrari – Modena
Hammers already existing in venues
18
Bronze and iron shots for competitions and training (M. 60-V. 30)
90
Shots already existing in venues
48
Precision weighing machines for checking equipment Starting blocks
2 50
Starting blocks already existing in venues
46
Pole vault and high jump bars for competitions
50
Fast – Trieste
Pole vault and high jump bars for training
20
Romana Impianti Sportivi – Rome
Hurdles for steeplechase
6
Primo Ferrari — Modena
Berkel – Rome Romana Impianti Sportivi – Rome
C.O.N.I. – Sports Venues Management Service
105
Pole vault uprights with moveable base for eventual quick changes.
Mobile luminous indicator for results of throws and jumps.
Measuring device for discus, javelin and hammer throws.
Transistor apparatus including three laryngophones and eight loudspeakers for starts in athletics events.
107
QUANTITY
TECHNICAL MATERIAL
ATHLETICS
SUPPLIER
(cont.)
Cloth flags for steeplechase course
200
C.O.N.I. – Sports Venues Management Service
Vaulting poles (metal) of various types for training
45
Fast – Trieste
Trolleys for transporting hurdles
11
C.O.N.I. – Sports Venues Management Service
Pole vault uprights for decathlon
2
Romana Impianti Sportivi – Rome
Special steel competition vaulting poles
10
See Fabriks Aktiebolag – Sandviken (Sweden)
Shot carriers
12
C.O.N.I. – Sports Venues Management Service
Javelin carriers
8
C.O.N.I. – Sports Venues Management Service
Hammer carriers
4
C.O.N.I. – Sports Venues Management Service
Vaulting pole carriers
3
C.O.N.I. – Sports Venues Management Service
1,200
C.O.N.I. – Sports Venues Management Service
2
C.O.N.I. – Sports Venues Management Service
Starting block carriers
12
C.O.N.I. – Sports Venues Management Service
Lane markers
28
C.O.N.I. – Sports Venues Management Service
Throwing markers
90
C.O.N.I. – Sports Venues Management Service
Coloured spheres for jump indications Wool thread
Kgs.
Hand Scoreboard complete
2
Montanucci Sport – Rome
Arrow markers for indications of throw
10
C.O.N.I. – Sports Venues Management Service
Flags to mark Olympic and World records
20
C.O.N.I. – Sports Venues Management Service
Relay batons Plastic strips to mark out competition sectors m.
130 1,500
Francesco Rubini – Rome Romana Impianti Sportivi – Rome
Writing frames for judges
110
C.O.N.I. – Sports Venues Management Service
Wooden folding chairs
100
Gradella Sport – Rome
Megavox electric megaphones
4
Standard Elettronica Italiana – Genoa
Mobile luminous indicator boards
3
Standard Elettronica Italiana – Genoa
Meteorological units
2
Filotecnica Salmoiraghi – Milan
Anemographs
2
Guido Guidelli – Bologna
Transistor starting apparatus including 3 laryngophones and 8 loudspeakers
1
Standard Elettronica Italiana – Genoa
Electric tachometer apparatus to two units
108
Standard Elettronica Italiana – Genoa
TECHNICAL MATERIAL
ATHLETICS
QUANTITY
SUPPLIER
(cont.)
Special starter pistols
4
Omega – Bienne (Switzerland)
Radiotelephone pairs
2
Standard Elettronica Italiana – Genoa
Supply points walk events
complete for marathon and
Metallic torches complete with fuel to illuminate marathon course Portable transistor tape recorder 3-unit luminous indicator board to call athletes forward Black competitors' numbers on white background (men)
10
La Nuova Silvestre – Rome
1,000 1
Agip – Rome Standard Elettronica Italiana – Genoa
1
Standard Elettronica Italiana – Genoa
3,000
Romana Sport – Rome
300
Romana Sport – Rome
300
Romana Sport – Rome
Black competitors' numbers on yellow background (20 km. walk)
300
Romana Sport – Rome
Calibration apparatus and measurement apparatus for throwing equipment
15
Yellow competitors' numbers on black background (women)
1,500
Romana Sport – Rome
White numbers on red background (women's relay)
600
Romana Sport – Rome
Red numbers on white background (men's relay)
1,200
Romana Sport – Rome
White competitors' numbers on black background (marathon) White competitors' numbers on green background (50 km. walk)
Eredi S. Delle Grotti – Rome
BASKETBALL Official competition balls Training balls
110 60
Superball Vis – Lavagna Gradella Sport – Rome
Patented backboards
6
Giulio Spada – Milan
Tempered 12/14 glass 180 × 120 cms
9
L. Brusotti – Milan
Iron baskets Nets
11
Giulio Spada – Milan
9
Giulio Spada – Milan
BOXING Gloves – pairs for training
79
Gradella Sport – Rome
Gloves – pairs for punch bag
43
Gradella Sport – Rome
570
Gradella Sport – Rome
Gloves – pairs for competition (8 oz)
109
QUANTITY
TECHNICAL MATERIAL
SUPPLIER
BOXING (cont.) 580
Gradella Sport – Rome
Elastic waist bands
82
Gradella Sport – Rome
Training punch bags
18
Superball Vis – Lavagna
Iron spring extensors
18
Superb all Vis – Lavagna
Speed balls
27
Superball Vis – Lavagna
9
Superball Vis – Lavagna
Training masks
55
Gradella Sport – Rome
Skipping ropes
47
Gradella Sport – Rome
Elastic bandages – pairs
Speed ball platforms
Special ring complete with accessories for Palazzo dello Sport
1
Francesco Rubini – Rome
Ring complete with accessories for training
5
Francesco Rubini – Rome
Ring complete with accessories for training
4
Montanucci Sport – Rome
Rings already existing in various gymnasiums
4
Univerbell mirrors
13
Renzo Bottero – Rome
Weighing machines for athletes
12
Berkel – Rome
Medical training balls
18
Superball Vis – Lavagna
580
Gradella Sport – Rome
Elastic bandages – pairs Automatic point Scoreboard
1
Ditta Solari – Rome
CANOEING AND ROWING Numbers in cloth for canoeing (2 series of 1 to 100)
200
Romana Sport – Rome
Numbers in cloth for rowing (120 series of 1 to 6)
720
Romana Sport – Rome
Bronze bells 2.150 kgs
9
P. Braguglia – Rome
Dress flag series
3
Unione Militare – Rome
Red tammy flags
12
Unione Militare – Rome
White tammy flags
12
Romana Sport – Rome
Lambrecht Anemometer
1
Filotecnica Salmoiraghi – Rome
Sisal hemp rope
kgs.
650
Hemp rope
kgs.
65
Siama-Mass – Rome
4
Siama-Mass – Rome
Weights – 260 kgs.
110
Gradella Sport – Rome
TECHNICAL MATERIAL
QUANTITY
SUPPLIER
CANOEING AND ROWING (cont.) Weights – 460 kgs
1
Siama-Mass – Rome
Brass megaphones
4
Siama-Mass – Rome
Luminous results Scoreboard
1
Standard Elettronica Italiana – Genoa
1
Standard Elettronica Italiana – Genoa
1
Standard Elettronica Italiana – Genoa
Rowing starting apparatus composed of 8 monitor-phones Canoeing starting apparatus composed of 28 monitor-phones
CYCLING Bicycle carrier frames applied to vehicles following road races Photo-finish equipment complete
40 1
Photo - electric apparatus for pursuit race events Electric tachometers
1 1
Omega – Bienne (Switzerland) Standard Elettronica Italiana – Genoa
Hand Scoreboard complete
1
Francesco Rubini – Rome
Vests with Olympic rings
13
Gradella Sport – Rome
3 1
Edizioni Lancio – Rome Gradella Sport – Rome
Strips indicating "Last kilometer" and "Finish" Number series from 1 to 100 for track events
Gastone Capacci – Rome Omega – Bienne (Switzerland)
Indicator plates and placards
390
Arpa Color – Rome (and others)
Supply bags
250
Pietro Chiappini – Rome
Number series from 1 to 200 for road races Plastic armlets
EQUESTRIAN
4
Antonio Ganna – Milan
318
Arpa Color – Rome
100
Laboratorio Artigiano Bertoni Carletti – Rome
SPORTS
Number pairs covered in plastic Horse slaughter pistols
2
Armeria Smith – Rome
Numbered armlets
550
Costanzi Lea – Rome
Saddle numbers
100
Costanzi Lea – Rome
White breast numbers
100
Costanzi Lea – Rome
10-position commutators for attaching thread in endurance test Cockades for horses
6 100
Felc – Tivoli Picchiani e Barlacchi – Florence
Horse capes Lead weights – 1 kg.
6
A. Pariani – Milan
30
A. Pariani – Milan
111
Electric tachometer equipped with acoustic signal for track cycling events.
Starting block carrier.
Electric Scoreboard for immediate registration of results in gymnastic events.
Hurdle-carrier trolleys.
TECHNICAL MATERIAL
EQUESTRIAN
SPORTS
QUANTITY
SUPPLIER
(cont.) 6
Sellerie Carletti – Rome
Leather and cloth covers with buckle and rings
12
Sellerie Carletti – Rome
Scoreboard with national flags
22
P. Pallini – Rome
Coloured barriers
36
P. Nisini – Rome
6
P. Nisini – Rome
Wooden walls
15
P. Nisini – Rome
Field telephones
40
Italian Army
Belts for lifting horses
Wooden gate and rails
Course marker trolleys
2
C.O.N.I. – Sports Venues Management Service
FENCING Firwood pistes for competitions and training
16 24
Antonio Cucinotta – Rome
Spool pairs Spool holders
32
Conti Giuseppe – Milan
Equipment signalling touches for foil events
16
Carmimari – Milan
Equipment signalling touches for sabre events
16
Carmimari – Milan
Tabulator pairs registering points
16
Standard Elettronica Italiana – Genoa
Luminous Scoreboard
1
Standard Elettronica Italiana – Genoa
Tribune for central piste at Palazzo dei Congressi Electrified blades for sabres
1 20
Antonio Cucinotta – Rome Conti Giuseppe – Milan
Signal repeaters
16
Carmimari – Milan
Weights for measuring foils
16
Carmimari – Milan
Weights for measuring sabres
16
Carmimari – Milan
Linoleum pistes
16
Vincenzo Naticchioni – Rome
Device for checking of arms Apparatus with manometer for checking of electric points Pistes in canvas Cocoanut matting
1 1 16 150
Carmimari – Milan
Carmimari – Milan Carmimari – Milan P. Fornara & Co. – Turin Giacomini & Co. – Tezze di Piave
Plates for fixing metallic carpets
16
Ugo Pirazzoli – Rome
Scoreboard for registration of results
12
Stam – Rome
Brass calibrating sets for checking of arm
114
6
Carmimari – Milan
TECHNICAL MATERIAL
QUANTITY
SUPPLIER
FOOTBALL Official competition balls
90
Superball Vis – Lavagna
Balls for training
96
Gradella Sport – Rome
Results scoreboards
12
Various suppliers in the differents towns
GYMNASTICS Parallel bars for men's competitions and training
4
Figone & Carlini – Chiavari
Asymmetric parallel bars for women's competitions and training Fixed bars for men's competitions and training
4 4
Figone & Carlini – Chiavari Figone & Carlini – Chiavari
4
Figone & Carlini – Chiavari
6
Figone & Carlini – Chiavari
Horse with pommel for men's competitions and training
4
Figone & Carlini – Chiavari
Long Horse for men's and women's competitions and training Beams for women's competitions and training
7 4
Figone & Carlini – Chiavari Figone & Carlini – Chiavari
Elastic platforms, Reuter type
8
Alder & Eisenth – Zurich
Supports for rings for men's competitions and training Platforms for free-standing exercises – men and women
Platforms, rigid
12
Figone & Carlini – Chiavari
Cocoanut matting, 1 × 2 m
60
Figone & Carlini – Chiavari
Leather matting, 1 × 2 m
20
Figone & Carlini – Chiavari
Rubber tracks for take-off run
6
Figone & Carlini – Chiavari
Hand placards for jury scoring
50
Figone & Carlini – Chiavari
Tribune for competition arena
1
Venturi – Bologna
Hand scoreboards for results
2 2 3
Montanucci Sport – Roma
Steps in firwood Extensions for belts with rope and pulley Spare bars, pairs Felt to cover platforms
14 222,9
Montanucci Sport – Roma Figone & Carlini – Chiavari Figone & Carlini – Chiavari C. Bragetti – Prato
HOCKEY Balls
480
Hans Raj Mahajan – Jullundur City (India)
Whistles for International referees
20
Gradella Sport – Rome
Uniforms for ball boys
18
Gradella Sport – Rome
115
TECHNICAL MATERIAL
MODERN
QUANTITY
SUPPLIER
PENTATHLON
Horses for equestrian test
67
Carabinieri Forces
Horses for training
30
Carabinieri Forces
Saddlery complete
30
A. Pariani – Milan
Tents, 6 × 6 m. as dressing rooms and classification service
10
Italian Army
Obstacles of various types for competition
25
Cecchini – Passo Corese
6
Cecchini – Passo Corese
Obstacles for training ground
12
Obstacles for training Precision weighing machines to weigh athletes Lead weights, 1 kg., for athletes
2 30
Ballot-box for drawing of lots for horses Competition numbers for equestrian shooting tests with national flags
1
Italian Army Berkel – Rome A. Pariani – Milan Ministry of Finance — Rome
and 70
Romana Sport – Rome
Numbered saddle cloths with national flags
70
Italian Army – Air Force
Stables for horses on competition ground
60
Cecchini – Passo Corese
Stables for horses on training ground
30
Italian Army
Armlets for equestrian and fencing tests
70
Romana Sport – Rome
Tribune for equestrian test at Passo Corese
1
Venturi – Bologna
Water troughs, field
2
Italian Army
Hand scoreboards for results
3
Francesco Rubini – Rome
12
Francesco Rubini – Rome
Panels for results Luminous Scoreboard for equestrian result
3
Standard Elettronica Italiana – Genoa
Exchange linked to 25 obstacles
1
Felc – Tivoli
Telephone earphones
25
Standard Elettronica Italiana – Genoa
Wooden placards for judges
40
Montanucci Sport – Rome
25
C.O.N.I. – Sports Venues Management Service
White flags for obstacles
30
Romana Sport – Rome
Red flags for obstacles
30
Romana Sport – Rome
120
Romana Sport – Rome
Metals numbered obstacles
placards for
equestrian
Yellow flags with St. Andrew's red cross signalling obligatory passages Water wagons for watering of course
116
2
Antero Gambellini – Rome
TECHNICAL MATERIAL
MODERN
PENTATHLON
QUANTITY
SUPPLIER
(cont.)
Double target switching apparatus Competition numbers for fencing and athletics with national flags Pincers for authenticating pistols Target replacements for pistol shooting
9 70
Giuseppe Sibani – Vergato (Bologna) Romana Sport – Rome
3
Tesoreria della Zecca
500
Tesoreria della Zecca
Fencing arms measures
6
Carmimari – Milan
Pincers for authenticating blades
2
Arpa Color – Rome
Metal platforms for training
6
P. Fornara & C. – Turin
Spools for wire
12
Carmimari – Milan
Signalling equipment for touches in training
6
Carmimari – Milan
Strips indicating " S t a r t " and "Finish"
2
Edizioni Lancio – Rome
Indicator course
pickets
outlining cross-country
Strips outlining athletics course
800 10,000
C.O.N.I. – Sports Venues Management Service Romana Sport – Rome
Tribune for cross-country test at Acqua Santa
1
Venturi – Bologna
Office bus following test
1
Italian Army
Boxes for measuring automatic pistols
4
G. Magheri – Florence
Zenith weighing machines, 200 kgs
4
A. Algranati – Rome
Target carriers in fibre
6
M. De Rossi – Rome
Revolving blackboards for results
2
Montanucci Sport – Rome
Hand scoreboards complete for results
8
Francesco Rubini – Rome
Platforms in firwood for shooting lines
20
SHOOTING
Luminous sector panels Calibres 5.6 for pistol and small-bore rifle
4
E. Saioni – Rome Standard Elettronica Italiana – Genoa
24
G. Magheri – Florence
Calibres 8 for free rifle
8
G. Magheri – Florence
Card indexes for judges
70
Montanucci Sport – Rome
Numbered metal sheets
85
L. Amendola – Rome
Sawdust pillows for shooting lines
100
L. Sonnino – Rome
117
Luminous indicator connected with juries for wrestling events.
118
Special card perforator for the awarding of points in diving competitions.
119
TECHNICAL MATERIAL
QUANTITY
SUPPLIER
SHOOTING (cont.) Indicators for markers
147
E. Saioni – Rome
Bullet impact sheets
200
Di Fazio & Bianchi – Rome
Magnifying lenses
7
Ocularium – Rome
Target perforators
2
E. De Magistris – Rome
Targets, 300 m.
8,000
Ricci & Barbaro – Treviglio
Targets for free pistol
8,000
M. Forti – Rome
Silhouettes for rapid fire
8,000
M. Forti – Rome
10,000
M. Forti – Rome
Silhouette spares Switching apparatus, electrically controlled for rapid fire
10
Giuseppe Sibani – Vergato (Bologna)
Automatic apparatus for pulling back targets
60
Spieth – Nurimberg
Competition numbers (two series of 1 to 400)
800 99,900
Clay pigeons
60
Cocoanut mats
60,000
Targets for small-bore rifle
Romana Sport – Rome Armeria F.lli Rossini – Torrette (Ancona) Giacomini & C. – Tezze di Piave M. Forti – Rome
500
Edelmann-Heidenheim – Brinz
2,150
Edelmann-Heidenheim – Brinz
25,000
Edelmann-Heidenheim – Brinz
Targets for free pistol
2,000
Edelmann-Heidenheim – Brinz
Silhouettes, cardboard
500
Edelmann-Heidenheim – Brinz
Silhouettes, paper
150
Edelmann-Heidenheim – Brinz
White patches
100,000
Edelmann-Heidenheim – Brinz
Black patches
400,000
Edelmann-Heidenheim – Brinz
Transparent patches
650,000
Edelmann-Heidenheim – Brinz
Target backings Targets for free rifle Targets for small-bore rifle
SWIMMING, DIVING
WATERPOLO
AND
Dismountable support for 1 m. springboard diving Pyramids with playing area
120
lanes marking
1
F.lli Onofri – Rome
waterpolo 14
Francesco Rubini – Rome
QUANTITY
TECHNICAL MATERIAL
SWIMMING, WATERPOLO DIVING (cont.)
SUPPLIER
AND
Balls for official competitions
50
Superball Vis – Lavagna
Balls for training
33
Gradella Sport – Rome
Special card perforator for assigning diving points Waterpolo caps.
1 153
Olivetti Bull – Milan Gradella Sport – Rome
Boards for competition diving
1
Duraflex Pasadena – California
Boards for diving training
1
Lucas Pesie – Amersfoort –
Boards for diving training
1
Norman Buck Mfg. Co. – Washington
Boards for diving training
1
White Plains
Boards for diving training
1
Modern Swimming Pool International Inc.
Boards for diving training
1
Contemporary Industries – London
Special stand and enclosure for weighingin at Palazzetto dello Sport
1
Montanucci Sport – Rome
Platforms for warming-up
5
Montanucci Sport – Rome
Platforms for competition and training
9
Montanucci Sport – Rome
Sub-platforms for training arenas
8
Montanucci Sport – Rome
WEIGHTLIFTING
Steel bars for weights complete with vice
39
Primo Ferrari – Modena Gradella – Rome Sirea – Rome
262
Ferrari — Modena
Dumb-bells for training
40
Ferrari – Modena
Folding beds for resting
15
Montanucci Sport – Rome
Dumb-bell and weight holders
4
Montanucci Sport – Rome
Electric signalling device validating lift with jury
1
Standard Elettronica Italiaiui – Genoa
Electric Scoreboard indicating weight lifted
1
Standard Elettronica Italiana – Genoa
Hand Scoreboard complete
1
Francesco Rubini – Rome
Weighing machine for athletes
8
Maurizio Monti – Rome
Weights, various
Cocoanut matting m.
50
Montanucci Sport – Rome
121
TECHNICAL MATERIAL
WEIGHTLIFTTNG
SUPPLIER
QUANTITY
(cont.)
Weight rests
16
Primo Ferrari – Modena
280
Romana Sport – Rome
20
Primo Ferrari – Modena
8
Primo Ferrari – Modena
Barbell rests
40
Primo Ferrari – Modena
Pressed rubber platforms
16
Sirea – Rome
Competition numbers (7 series of 1 to 40) Training benches Dumb bells for training
WRESTLING Special competition mattresses
3
Foldeak – Munich
Cloth mattresses for training
8
Gradella Sport – Rome
32
Gradella Sport – Rome
Side protection mats Tribune for competition arena
3
Francesco Rubini – Rome
Luminous signalling boards linked to jury
3
Standard Elettronica Italiana – Genoa
Scoreboards, hand, already existing
3
Anklets, two colour, for athletes
48
Gradella Sport – Rome
Counters for drawing lots
10
Gradella Sport – Rome
Weighing machine for athletes
8
Berkel – Rome
Gong for competition
4
Gradella Sport – Rome
Megaphones for Jury
4
Gradella Sport – Rome
Hand scoreboards for results
3
Montanucci Sport – Rome
Whistles, 3-tonality Ballot-box for drawing of lots White, red & green flags Armlets for Jury
40 8
Gradella Sport – Rome Montanucci Sport – Rome
54
Gradella Sport – Rome
100
Gradella Sport – Rome
YACHTING Olympic " Finn " class dinghies Weighing machines to weigh craft Mainsails for " Finn " craft
122
55 3 60
Cantieri Riuniti dell'Adriatico – Trieste Michele Viganego & C. – Genoa Velscaf – Rapallo
Iron basin complete with electric pump for gauging (5.5. class). Gauging operations.
TECHNICAL
MATERIAL
SUPPLIER
QUANTITY
YACHTING (cont.) Metal signs for buoys Starting cannons Alluminium poles for gauging craft
20
La Meccanica Navale – Naples
6
Secondo Tanfoglio – Gardone
92
Cantieri Riuniti dell'Adriatico – Trieste
Numbers for recalling purposes
140
Vittorio Rubera – Genoa
Coloured buoys for mooring
110
P. Cepollina – Rapallo
Trolleys for launching and towing F.D. & Finn class
20
Officina Meccanica Baldi – Dronero
Portable 5-transistor megaphones
12
Aspi – Milan
Levels, water in suitcase
2
Protest flags, Finn class
60
Socota – Como
Megaphones, normal
30
G. R. Raggio – Genoa
Finn covers
55
Velscaf – Rapallo
Iron basin for gauging with pump Plastic float apparatus for Finn craft
1 260
Michele Viganego & C. – Genoa
Officine Meccaniche Servettaz-Basevi – Savona Ditta Plastica Entella – Chiavari
" Dennison " weighing machine, 3,000 kgs, for 5.5. and Dragon class
2
Michele Viganego & C. – Genoa
" Marengo " weighing machine, 300 kgs, for F.D. class
1
Michele Viganego & C. – Genoa
Floating smoke signals, orange Buoys for mooring and races
400 39
Montanari s. r. l. – Naples Naples Marine Arsenal
Luminous buoys with 2 m light projection
4
Italian Navy
Luminous buoys with electric lights
5
Italian Navy
124
TECHNICAL SERVICES
O n October 1st 1956, the Technical Section was formed and placed in the hands of Mr. Virgilio Tommasi. Acting on the basis of directives received, the Section worked out a general programme of work, the salient points of which may be summarised as follows: setting up of sports committees; working out of a sports programme and timetable; drawing up of technical regulations, entries to competitions; preparation and formation of juries; selection and purchase of competition equipment; employment of personnel in stadiums; technical equipping, both internally and externally, of sports and training venues, flag requirements and displacements; timekeeping services. The Section immediately started to set up internal offices, as indicated in Table no. 1. In order to create an efficient organisation for the various Sports included in the programme of the Rome Games, one of the first problems to be dealt with was the selection and recruiting of persons considered suitable for their organisational capacities, technical competence and experience. Acting on the principle that the Technical organisation should be directed by persons acting in a voluntary capacity, in agreement with the various National Sports Federations, the Honorary Technical Stewards were selected from persons who practised the sports in question at a competitive level. These persons co-operated with the Technical sections in drawing up organisational plans of the sports programmes and subsequent developments, keeping up regular and constant contacts with their respective sports Federations. Later, the work of the Technical Stewards was integrated by the Sports Committees. The Presidents of the respective Italian Sports Federations acted as Chairmen of these Committees which were formed of members varying in number in accordance with the requirements of the various sports on the programme. The Committees controlled the organisation and supplied all the necessary suggestions to perfect what the Technical Section and Technical Stewards, the responsible bodies for the organisation, had laid down. Furthermore, both in the final phases of the organisation and during the competitions proper, members of the sports committees dealt with the various duties connected with representation and the executive requirements of the various sectors (checking of equipment, contacts with juries, liaison with officials of the International Sports Federations, etc.). 127
TABLE NO. 1 TECHNICAL SECTION Virgilio Tommasi
MECHANOGRAPHIC CENTRE Edoardo Facello
TIMEKEEPING SERVICE Giovanni Romagna
CO-ORDINATION OF SPORTS COMMITTEES
REGULATIONS AND ENTRIES
TRAINING OFFICE
FLAG COLLECTION CENTRE
Mario Vivaldi
Giovanni Guabello
Amos Matteucci
Aurelio Chiappero
ATHLETICS BASKETBALL BOXING CANOEING CYCLING EQUESTRIAN SPORTS
Liaison with International Federations
FENCING
Nomination, confirmation and use of Juries
FOOTBALL GYMNASTICS
Duties
of each
Sports Committee
Liaison with the Press and teams Liaison with Protocol Office
HOCKEY Liaison with venues MODERN PENTATHLON ROWING SHOOTING SWIMMING AND WATERPOLO WEIGHTLIFTING WRESTLING YACHTING
Classifications and official results
However, the greater part of the work and responsibility lay with the Honorary Technical Stewards whose work proved to be particularly useful in the course of their constant contacts with the Technical Section for the solution of the many problems connected with the preparation of the Olympic Games and particularly in respect of controversies or matters not foreseen by the regulations. Particular stress should be laid on their help and intervention on the occasion of the drawing up of the sports regulations, of the preparation of entry forms for the competitions, of the establishing of the competition timetable and when the Olympic Committees submitted their entries to the Games. This latter operation necessitated the revision of entries, the drawing up of lists once a check had been made on the details required by the entry forms as well as a check on the final dates prescribed for entry. Once the setting up of the Sports Committees had been settled and its work of co-ordination and study set in motion, the Technical Section started working on the choice of localities for the holding of the yachting and rowing events. However, from the outset, it was decided to hold the yachting events in the Bay of Naples and the rowing and canoeing regattas on Lake Albano. This decision was communicated to the I.O.C. for approval and at the same time authority was requested to hold elimination rounds or pre-Olympic selection rounds of team events in other Italian cities. Once appropriate analyses had been made on climatic conditions and temperature in the City of Rome (Table No. 2), in January 1957 a decision was arrived at for the period during which the Games were to be celebrated, namely, some time between the last ten days in August to the first ten days TABLE NO. 2
AVERAGE TEMPERATURE AND RAINFALL
JULY
AUGUST
SEPTEMBER
1. - Average temperature
25.5
25.1
22.3
2. - Average minimum temperature
18.2
18.2
16.2
3. - Average maximum temperature
31.4
31.7
28.3
4. - Lowest minimum temperature
11.0
9.0
10.0
5. - Highest maximum temperature
38.0
39.0
40.0
at 07.00 hrs
71
75
83
at 13.00 hrs
42
43
51
12.0
19.7
72.5
1.6
2.2
5.7
6. - Relative humidity in % 7. - Rainfall in mms.
8. - Number of days with rainfall superior or equal to 1 mm.
The average temperature and rainfall in Rome, as indicated in the above table, is based on calculations made over a period of twenty years of observation for items 1, 7 and 8 and over eight years for the other items.
129
of September. However, before submitting a proposal for definite dates to the I.O.C. for approval, the Section took this matter up with the International Sports Federations. From other studies made and after an exchange of ideas with representatives from International Federations and from many National Olympic Committees, particularly during the Evian meeting in June 1957, the Section, in agreement with the General Olympic Organisation, arrived at the conclusion that certain modifications should be made to the sports programme that had been accepted in principle at the time when the Games had been assigned to the City of Rome. These modifications were dictated in view of the obvious increase in the number of competitors foreseen and the consequent difficulty of completing the smooth running of competitions within the prescribed period of only 16 days. In fact after the many Olympiads which had been held, it appeared opportune to review the general situation and results obtained in each individual sport. Accepting in principle the sports programme of the XVI Olympiad, it was nevertheless considered that the number of Olympic titles to be won in certain sports also be reviewed, whilst the number of competitors allowed to participate be reduced. It was therefore proposed to the I.O.C. that the competition programme be modified by cutting down the number of gold medals in cases where these were not considered absolutely necessary and also by reducing the number of competitors. After many deliberations made in a number of Sessions, the I.O.C. facilitated the requests made in this respect. During the I.O.C. Sofia Session of 22nd September 1957, proposals were submitted and passed whereby certain competitions be eliminated from the programme of the Games (i.e. Running Deer Shooting), overall team classification be done away with, etc. In the meanwhile, the Section took steps to obtain a limitation on the number of " reserves " allowed in the various sports. The intention was partly successful notwithstanding considerable opposition from some of the International Sports Federations. In September 1957, a proposal was made to the I.O.C. for levelling out the competition timetable so as to avoid, as was the case in the past, a full and interesting first week's programme with sports of major interest to the general public, to the detriment of the second week where normally sports of secondary interest to the public are held, with consequent reduction in attendance. In this respect, the Rome Organisation, bearing in mind the criticism made over past timetables, made plans to delay the athletics competitions, normally held within the first eight days, and which, once over, provoke a decreasing interest in the whole Games. Finally, the International Amateur Athletics Federation agreed, with certain provisoes, to the proposed change. 130
The I.O.C. and the International Federations likewise finally accepted the proposals and gave them their official sanction. Thus, the timetable showed the most spectacular sport (athletics) as taking place in the middle of the 16 competition days, with a more logical and impartial distribution of the other sports during the first days. A further innovation, which, was proposed and accepted, was that concerning the Marathon. This event was moved from its traditional place in the athletics programme and held, as is known, during the evening along the picturesque route leading from the Capitol, across the Imperial Forums, E.U.R. and the Old Appian Way and ending at the Arch of Constantine. This route was described as excellent by Mr. D.T.P. Pain, Honorary Secretary of the I.A.A.F., on the occasion of his visit to Rome in August 1957. These modifications and innovations to the sports programme were finally submitted to the I.O.C. for their approval during the work of the 53rd Session of Sofia. On this occasion, the Italian Delegation, whilst expressing itself prepared to adopt the technical theme of the preceding Melbourne Games, pointed out the possibility of reducing certain events on the programme. The modifications, which were unanimously approved, consisted of:—the elimination of medals for team events based on the total of points obtained by individual competitors in the same event; elimination of sports insufficiently developed nothwithstanding their inclusion in previous Olympic Games (Running Deer shooting, 10,000 metres canoeing); reduction in the number of participants per nation in certain events (Gymnastics, athletics, swimming); further limitation in the number of reserves. To sum up, the variations in the Rome Games as opposed to those of Melbourne (for events) can be seen from Table No. 3. TABLE NO. 3
SPORT
Athletics Canoeing
Cycling Equestrian Sports Fencing Gymnastics Swimming Shooting
COMPETITIONS
ADDED
Ladies 800 m. Ladies K2 500 m. Mens K1 4 × 500 relay — — Team time-trial over 100 kms. — Ladies team foil — Men and Ladies 4 × 100 medley relay —
COMPETITIONS
Mens Mens Mens Mens
C1 C2 K1 K2
10,000 10,000 10,000 10,000
ELIMINATED
m. m. m. m. —
Team dressage — Ladies team competition with portable apparatus — Running deer
131
The main modifications approved by the International Olympic Committee, as planned and proposed by the Organising Committee, were those concerning the overall team classification based on the total of the individual results and the double individual classification in the gymnastics events. It was therefore decided to hold two separate Road Cycling events for both individual and team classification and two Equestrian Jumping competitions (Grand Prix) for individual and team classification. Again, a new formula was adopted for individual titles in the Gymnastics apparatus competitions whereby there was a final event reserved for the best classified gymnasts on the various apparatus in the combined events. It was only in the 3-Day Equestrian event and Modern Pentathlon that it was not possible, for obvious practical reasons, to repeat the competition twice, so that the team classification was arrived at by adding the scores of the three best competitors per nation in the individual event. In January 1958, the Technical Section, irrespective both of the formalities of entry and the maximum number of participants in each competition, was able to announce the general programme of the events of the Games and in October of the same year the programme could be considered definite, but it was only in May 1959, namely after the decisions taken by the I.O.C. at Tokyo, that the programme could be circulated and even then with a number of provisoes. (Table no. 4). As a result of the decision taken during the Tokyo Session of the I.O.C, the Technical Section began negotiating with the International Sports Federations concerned to clear up certain points of the programme which were still subject to controversy. The Congress of the I.A.A.F. held in Stockholm in August 1958 passed a resolution which permitted a reduction in the number of competitors participating in the individual Athletics events and the inclusion in the programme of the Ladies 800 metres race. The system to be adopted by the I.A.A.F. for reducing the number of competitors was approved by its Board on 9th May 1959. Meanwhile, agreement was reached with the International Gymnastics Federation on the 14 events on the programme. On the strength of the authority granted during the Tokyo Session, the President of the I.O.C, Mr. Brundage, came to an agreement with the F.I.N.A. on the inclusion of the Men's and Ladies' 4 × 100 Medley Relay in the programme on the understanding that the teams participating would consist of competitors already entered in other events. The F.I.N.A., in agreement with the Organising Committee, reduced the number of entries in each event from 3 to 2. It had been decided at Tokyo that the canoeing events be limited to seven and that the K4 and long distance events be excluded from the programme. The International Canoeing Federation protested against the exclusion of the K4 and succeeded in having the question reviewed during the Monaco Session of the I.O.C It should be stated that the International Ca132
noeing Federation had, in effect, largely contributed to the lightening of the Olympic programme, canoeing events having been reduced from nine to seven and having voluntarily renounced the right to reserves which, in preceding Games, could have amounted to 100 % of the competitors. However, notwithstanding this, the International Canoeing Federations's request was not granted. We feel that it should be pointed out that in spite of the reductions in question, the number of sports and events on the Olympic programme of Rome called for considerable effort, concentration and financial backing. The International Olympic Committee should bear in mind for the future that the volume of organisational work required by Olympic Games is becoming enormous as the result of the growing number of Olympic titles and of the steady increase in the numbers of National Olympic Committees which intend to participate in the Games. In view of the above, the I.O.C. should be extremely cautions when considering the insertion, in future Olympic programmes, of new sports or new events all of which lead basically to a substantial increase in participants. Lastly, the experience obtained from the Rome Games shows that both the public and the organisers have come to a crucial point and namely to a point where Olympic Games cause a multitude of problems. It is becoming almost impossible for the public to follow the more interesting events whilst the organisers have considerable difficulty in making available sufficient well qualified personnel and substantial financial means for an enterprise of such dimensions. In May 1958, in the presence of Mr. William Jones, Secretary of the F.I.B.A., the organisation of the basketball tournament was considered. On that occasion, amongst other things, it was decided that the 16 teams participating, in accordance with the Olympic Regulations, should consist of the eight teams classified in the eight places in the Melbourne Games; the Italian team as representative of the organising country; the three teams winning the qualifying continental tournaments such as the Pan-Asiatic and South American Games and 4 teams classifying in the first four places of the pre-Olympic qualifying tournament which was subsequently held in Bologna from 13th to 18th August 1960. In August 1958, the Section arranged a meeting at which Mr. Bruno Nyberg, the Finnish President of the International Weightlifting Federation, was present to examine the programme arranged for the weightlifting events. During this meeting, the ruling in connection with weighing-in and medical examination was established and it was also confirmed that the Jury of Appeal should be composed of 5 persons and that the judges should total 21 in number. During the same month, another meeting was held with Mr. Bertyl Sällfors, Secretary-General of the F.I.N.A., and the Section to settle problems in connection with swimming, waterpolo and diving. This meeting also established the numer of foreign and Italian judges and timekeepers. 133
SPORTS AUGUST SPORTS
Opening ceremony
26 FRI.
25 THU.
27 SAT.
28 SUN.
29 MON.
30 TUE.
2 FRI.
A
Athletics Rowing
A
Basketball Boxing
1 THU.
31 WED.
M N
A
N
A
N
Canoeing
M
A
Cycling
M
A
M
A
N
A
N
M
N
A
N
A
N
A
A
M
A
M
A
M
A
M
A
M
A
N
A
N
A
N
A
N
A
N
A
N
A
A
M
A
M
N
N
M
Equestrian Fencing Football
A
R E S T
M N
Gymnastics Hockey
M
Wrestling
M
Swimming
M
M
Modern Pentathlon
M
M
A N
A
M
A
M
N
M
A
N
M
A
N
M
N
M
M
M
A
M
M
M N
A A
N
A
A
A
A
M P
N
M
A
M
M
A
M
A
N
A
N
M
N
M
N
M
N
N
M
N
M
N
M
N
A
M
Weightlifting Shooting Water-Polo
N
M
M
N
Yachting
M
A
N M
N
M
N
N
A
N
M
M
Closing Ceremony M
134
=
MORNING
A
=
A F T E R N O O N
TABLE NO. 4
PROGRAMME
S E P T E M B E R 6 TUE.
5 MON.
4 SUN.
3 SAT.
7 WED.
8 THU.
10 SAT.
9 FRI.
11 SUN.
VENUES
Olympic Stadium M
M
A
A
M
A
M
A
A
Olympic Stadium road courses
N
and
Lake Albano
A A
N
A
N
N
N
N
Palazzetto dello Sport and Palazzo dello Sport
N
Palazzo dello Sport
N
Lake Albano Olympic Velodrome and road courses
A R E S T
M
M A M
N
M
A
M
A
M
A
M
A
M
M
A
M
A
M
A
M
A
M A
N
N M
A
M
A
M A
N
M
A
M
A
M
A
M
A
M
Flaminio Stadium for the finals
N
A
M A
Pratoni del Vivaro Piazza di Siena Olympic Stadium Palazzo dei Congressi
A
N M
M A
Baths of Caracalla
A
Stadio dei Marmi and Olympic Velodrome
A
N
Basilica of Maxentius
N
Swimming Stadium Courses and different localities
A
M
M
M
A
M
A
M
A
M
A
M
A
M
A
M
A
Palazzetto dello Sport
N
M
Umberto I and Cesano Shooting Range "Lazio" Shooting Stand
A
Swimming Stadium and Piscina delle Rose
N M
M
Bay of Naples
M A
N
=
Olympic Stadium
NIGHT
135
In November, the programme of the Equestrian events was approved in accordance with the resolution passed by the I.O.C. during the Tokyo Session and in full agreement with the International Equestrian Federation. During that same month, Mr. R. H. Russell, Secretary-General of the International Amateur Boxing Federation, attended a meeting to approve the boxing programme. The number of international judges was fixed as was also the composition of the Jury of Appeal. At a meeting held in Paris on 21st March 1959, attended by officials of the Technical Section, details of the elimination rounds of the Football tournament were studied and established. Another meeting at which members of the Technical Committee of the Union Cycliste Internationale were present was held on 25th March 1959. The meeting which comprised Mr. Stämphli (Switzerland); Mr. Dupin (France); Mr. Fernand Paul (Belgium); Mr. Alfred Binda (Italy) and Mr. Adriano Rodoni, President of the U.V.I., selected the two courses for the road cycling events and established the timetable for both the road and track events.
The " minimum " standards table. On 10th May 1959, a meeting of the Council of the I.A.A.F. was held in the halls of the Foro Italico under the chairmanship of the Marquis of Exeter. Also present at the meeting were Mr. Pain (England), Mr. Miettinen (Finland), Mr. Ferris (U.S.A.), Mr. Mericamp (France), Mr. Ericson (Sweden), Mr. Knenicky (Czechoslovakia), Mr. Paulen (Holland), Mr. Danz (Germany), Mr. Ciomenkov (U.S.S.R.) and Mr. Zauli (Italy). Among other matters, the Council approved the table of minimum standards required for participation in the Rome Games. These standards were as follows:— Men:—100 metres – 10"4; 200 m. – 21"3; 400 m.– 47"3; 800 m. – 1'49"2; 1,500 m. – 3'45"; 5,000 m. – 14'10"; 10,000 m. – 29'40"; 3,000 m. steeplechase – 8'55"; 110 m. hurdles – 14"4; 400 m. hurdles – 52"2; high jump – 2.05 m.; long jump – 7.50 m.; hop, step and jump – 15.60 m.; pole vault – 4.40 m.; shot – 17 m.; discus – 53 m.; javelin – 76.50 m.; hammer – 62 m.; decathlon – 6,750 points. Ladies:—100 m. – 11"9; 200 m. – 24"3; 800 m.–2'12"; 80 m. hurdles – 11 "2; high jump – 1.67 m.; long jump – 5.90 m.; shot – 14.60 m.; discus — 48 m.; javelin – 49 m. In accordance with the new regulation established by the I.A.A.F., all nations could enter one competitor for each of the above-mentioned events. However, any nation having a second athlete who had reached the abovementioned minimum standards after 1st October 1959 was permitted to enter a second athlete. Again, if any nation had a third athlete who had reached 136
these standards, a third athlete could be entered, thereby making up the maximun entry total allowed for each nation and for each event. The Council then went on to establish standards for qualification, namely, competitors entered in accordance with the above ruling had to surpass the following standards in order to take part in the events proper:— Men:—high jump – 2 m.; long jump – 7.40 m.; hop, step and jump – 15.50 m.; pole vault – 4.30 m.; shot – 16.75 m.; discus – 52 m.; javelin – 74 m.; hammer – 60 m. Ladies:—high jump – 1.65 m.; long jump – 5.80 m.; javelin – 48 m.; shot – 14.50 m.; discus – 47 m. Another meeting held on 19th-20th September was that of the F.I.N.A., under the Chairmanship of Mr. Jean De Vries, to decide the designation of nations to participate in the waterpolo tournament. During this period, the sports programme and relative regulations could be considered definite but for any other interventions for changes and modifications on the part of the I.O.C. and, in particular, of the International Sports Federations directly concerned.
The technical regulations. The Organising Committee attempted to follow the principles of the I.O.C. by unifying the regulations of the various sports. A great number of difficulties had to be faced because the various International Sports Federations possessed regulations widely differing one from the other. However, one matter was put forward which may be a determining factor for the success and continuity of the Modern Olympic Games. It had always been borne in mind that the Olympiad is not a series of championships in the various sports but simply one great event during which various sports are held and disciplined by common fundamental principles. Thus it was possible to come to an agreement with the interested Sports Federations whereby, in team events where no more than 16 nations could be admitted, the team of the organising nation of the Games be admitted by right to the various tournaments. It was also possible to get certain Federations, whose regulations permit the substitution of competitors or reserves up to a few days and even a few hours before the commencement of the events, to accept the principle that entries should be closed 14 days before the events proper. Another tangible result was obtained by establishing a smaller number of reserves than that laid down by regulations of the various International Sports Federations. 137
Some of the 18 technical regulations in respect of the sports on the programme.
The former stipulation was only reasonable as, by closing entries two weeks before the commencement of the events, the organisers allowed themselves the minimum sufficient time to draw up accurate timetables, prepare programmes with the names of competitors, issue communications to the Press and lay on appropriate accommodation. From the point of view of lodging, it was obviously useful to reduce the number of reserves to an absolute indispensable minimum, bearing in mind that each extra unit creates new problems and greater difficulties. However, it should be stressed that the International Sports Federations accepted and did their best to meet the requests made by the Organising Committee. The establishing of the technical regulations involved serious study and was completed as a result of the co-operation of the Italian Sports Federations and, in particular, of the International Federations which had to approve the texts of each regulation. The Sports Committee Co-ordination Office of the Technical Section, which received the help of representatives of each National Sports Federation, undertook this work which had become very complicated owing to many interventions. Unfortunately, the printing of a number of regulations was delayed owing to uncertainty on technical points or because Federations returned the final text after long delays notwithstanding polite but reiterated reminders. The technical regulations in respect of Gymnastics and Equestrian Sports placed the Organising Committee in serious difficulty, to the extent that this was subject of comment in the Official Bulletin. Last-minute changes and consequent rewording caused the organisers great loss of time and expense. Thus it was proved, as was already evident from the Melbourne Games, that the closest and fullest of co-operation should be shown to the organisers of an Olympiad, where duty and expense is involved. The compilation and translation of the various texts took two years of work and delivery, mostly by air, began on 16th November 1959 with the dispatch of 50 copies to the International Hockey Federations, and ended in April 1960. Each regulation was published in a separate volume in three languages i. e. French, English and Italian. 1,600 copies of each were produced with the exception of the Gymnastics booklets which were 2,100 in number, as copies were made available to instructors and competitors, these latter regulations containing details and drawings of the compulsory exercises. The Gymnastics regulations were also integrated with films on the Men's and Ladies' compulsory exercises. These films were produced under the control of the Technical Committee of the International Gymnastics Federation and were placed at the disposal of Olympic Committees of those nations which 139
TABLE NO. 5
Members of the I.O.C.
62
I.O.C.
3
Secretariat
TOTALS
Yachting
Wrestling
Weightlifting
Swimming & Waterpolo
Shooting
Rowing
Modern Pentathlon
Hockey
Gymnastics
Football
Fencing
Equestrian Sports
Cycling
Canoeing
Boxing
Basketball
Athletics
GROUPS
Complete with Olympic Regs.
DISTRIBUTION OF TECHNICAL REGULATIONS
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
International Sports Federations
10
50
50
50
50
50
50
50
80
50
50
50
50
50
50
50
50
50
880
National Sports Federations
35
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
40
200
Olympic Attachès
42
84
84
84
84
84
84
84
84
84
84
84
84
84
84
84
84
84 1,428
Organising Committee
80
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
30
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
34
578
10
17
17
17
17
17
10
17
10
10
17
17
17
17
17
17
17
17
268
Afghanistan
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Albania
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
Antilles
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Argentine
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
Australia
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
Austria
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
Bahamas
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Belgium
30
30
30
30
30
15
30
30
15
30
15
15
15
30
15
30
30
520
Bermuda
10
10
10
10
5
5
10
10
5
10
5
5
5
10
5
10
10
135
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
Burma
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Canada
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Press
943
Radio-TV Technical Section
Service
National Olympic Committees
Bolivia (a) Brazil British Guiana Bulgaria
140
TOTALS
Yachting
Wrestling
Weightlifting
Swimming & Waterpolo
Shooting
Rowing
Modern Pentathlon
Hockey
Gymnastics
Football
Fencing
Equestrian Sports
Cycling
Canoeing
Boxing
Basketball
Athletics
Complete with Olympic Regs.
GROUPS
Ceylon
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Chile
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
Chinese Popular Republic
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
68
Chinese Republic of Formosa
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Colombia
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Costa Rica (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Cuba
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Czechoslovakia
15
15
15
15
15
15
15
15
20
15
15
15
15
15
15
15
15
260
Denmark
15
15
15
15
15
15
15
15
9
15
15
15
15
15
15
15
15
249
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Dutch Antilles
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
El Salvador (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Equador (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Ethiopia
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Figi
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Finland
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
France
35
35
35
35
35
20
35
20
20
35
35
35
35
35
35
35
35
550
Germany-East
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Germany-West
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
340
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Great Britain
20
20
20
20
20
20
20
20
20
20
40
40
40
20
40
20
20
420
Greece
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Guatemala (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Haiti
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
Honduras (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Hong Kong
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Hungary
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
340
Iceland
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Dominican blic
Repu-
Ghana
Holland
India
141
TOTALS
Yachting
Wrestling
Weightlifting
Swimming & Waterpolo
Shooting
Rowing
Modern Pentathlon
Hockey
Gymnastics
Football
Fencing
Equestrian Sports
Cycling
Canoeing
Boxing
Basketball
Athletics
Complete with Olympic Regs.
GROUPS
Indonesia
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Irak
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
Iran
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
Ireland
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136 216
Israel
15
15
15
15
15
10
15
10
8
15
10
10
10
15
10
15
13
Italy
35
35
35
35
35
25
35
25
25
35
35
35
35
35
35
35
35
565
Japan
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
340
Kenya
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
5
5
5
5
5
5
5
5
14
5
5
5
5
5
5
5
5
94
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Liberia
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Liechtenstein
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Luxemburg
5
5
5
5
5
5
5
5
5
8
5
5
5
5
5
5
5
88
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
5
5
5
5
5
5
85
Korea Lebanon
Malaya
5
Malta
5
5
5
Mexico
8
8
8
Monaco
5
5
5
5
5
5
5
5
5
5
5
8
8
8
Morocco
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
New Zealand
5
5
5
5
5
5
5
5
9
5
5
5
5
5
5
5
5
89
Nicaragua (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Nigeria
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Norway
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Pakistan
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Panama
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85 85
North Borneo (a)
Paraguay (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
Peru
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Philippines
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Poland
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
340
Portugal
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Puerto Rico
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Rhodesia
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Rumania
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
San Marino Singapore
142
Totals
Yachting
Wrestling
Weightlifting
Swimming & Waterpolo
Shooting
Rowing
Modern Pentathlon
Hockey
Gymnastics
Football
Fencing
Equestrian Sports
Cycling
Canoeing
Boxing
Basketball
Athletics
Complete with Olympic Regs.
GROUPS
Somalia
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
18
South Africa
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
Spain
20
20
20
20
20
15
20
15
15
20
20
20
20
20
20
20
20
325
Sudan
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Surinam
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Sweden
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
340
Switzerland
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255 85
Tanganyka (a)
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
Thailand
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Tunisia
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
221
Turkey
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
170
Uganda
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
United Arab Republic
10
10
10
10
10
10
10
15
19
10
10
10
10
10
10
10
10
184
United States of America
45
40
40
40
35
25
40
30
25
30
40
40
35
45
40
40
35
625
U.S.S.R.
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
35
95
Uruguay
6
6
6
6
6
6
6
6
9
6
6
6
6
6
6
6
6
105
Venezuela
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
136
Viet Nam
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
85
Yugoslavia
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
255
Partial totals
1,215 1,188 1,182 1,182 1,182 1,172 1,105 1,182 1,165 1,130 1,172 1,177 1,177 1,172 1,187 1,177 1,182 1,205 19,937
Miscellaneous CONI Provincial Committees
92
Official, Judges, libraries, associations, private persons etc.
283
General Total Surplus Copies printed
291
261
255
341
300
218
321
411
350
280
290
260
308
290
250
255
290 4.971
1,590 1,479 1,443 1,437 1,523 1,472 1,323 1,503 1,576 1,480 1,452 1,467 1,480 1,480 1,477 1,427 1,437 1,495 24,908 410
121
157
163
77
128
277
97
24
620
148
133
163
120
123
173
163
105 2,792
2,000 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 2,100 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 27,700 (c) (b)
(a) Did not participate. – (b) Complete series of regulations with Olympic Regulations. – (c) Booklets in three languages (French, English & Italian).
143
requested a copy. The requests received were for 23 copies of the Men's exercises and 33 of the Ladies'. In addition, a further volume was printed containing the complete series of all the technical regulations and this edition had the Olympic Regulations reproduced in the front pages. 1,000 copies were produced in English, 500 in French and 500 in Italian. The dispatch of the regulations was undertaken by the Press Services Section which also gave invaluable help in not only translating the various texts but also prepared and edited the booklets. The distribution and dispatch of the regulation booklets was based on a plan which will be found under Table No. 5.
The Entry Forms. The system followed for entry in the Games of the XVII Olympiad differed from that used in occasion of previous Games. The Technical Section also undertook this work and, whilst basing itself on previous experience, it decided to be more practical in the use of the forms and did not follow the pattern of the traditional forms used in previous occasions. For purposes of clarification, a booklet entitled " Entry Forms " was published and sent out to all Olympic Committees. This gave precise details and instructions on the compilation of the entry forms. The forms themselves were printed in 8 different types and each form consisted of 3 copies: (a) original (blue in colour);
(b) 2nd original (yellow) and (c) copy (green). The types of entry forms were as follows:— (1) Entry form for nations (Form ST 1); (2) Entry form for individuals (Form ST 2); (3) Entry form for teams (Form ST 3); (4) Special entry form for the yachting events (Form ST 4). (5) Special entry form for the equestrian events (Form ST 5); (6) Special entry form for the diving competitions (Form ST 6); (7) Form for the declaration of amateur status (Form ST 7); (8) Medical certificate for women's athletics competitions (Form ST 8). The entry forms were sent out in triplicate in French and in English. It was only necessary to use one copy of forms ST 7 and ST 8 (declaration of amateur status and medical certificate). Among the more important instructions for the filling in of the entry forms was that reminding interested parties that the forms should be submitted 144
Facsimile of the entry forms for events.
10.
by and not later than 24.00 hrs. of the specified day. The booklet also specified that a form ST 1 had to be submitted for each sport in which the Olympic Committee intended to participate. This latter form to reach the Organising Committee by and not later than 24.00 hrs. (Rome time) of 30th June 1960. Form ST 2, " Individual Entry ", had to reach the Organising Committee within 14 days of the commencement of the first event of each particular sport and completed in detail. Competitors wishing to participate in more than one event had to fill in a separate form for each event. Furthermore, indication had to be given of (a) for athletics, the best performance attained by the athlete between 1st October 1959 and 15th August 1960, as this information confirmed the athlete's right to participate; (b) for swimming, the best performance attained by the athlete up to August 10th 1960. For the women's athletic competitions, a medical certificate had to be attached (Form ST 8) in accordance with the I.A.A.F. rules. Form ST 3, " Team entries " had to reach the Organising Committee, duly completed, within 14 days of the commencement of the event referred to. As many forms ST 2 (individual entry) as there were members of the team entered, reserves included, had to be attached to this entry. For the yachting events, in addition to forms ST 2 and ST 3 as prescribed, form ST 4, duly filled in, had to reach the Organising Committee by 24.00 hrs. (Rome time) on 14th August 1960 together with the following additional documents:— (a) certificate of rating of the yacht and; (b) a statement by the National Authority concerned to the effect that the certificate of rating had been checked and found to be in order. Exception was made for the " Finn " class where form ST 2 only was required. Form ST 5, " entry for equestrian events ", was required for all events of this sport in addition to form ST 2 (in the case of individual competitions) and ST 2 and ST 3 for team events. Form ST 5 had to reach the Organising Committee by 24.00 hrs., Rome time, August 21st 1960. For the diving events, form ST 6 had to be filled in and, together with form ST 2, had to reach the Committee by 24.00 hrs. (Rome time) on 11th August 1960. Form ST 7, " declaration of amateur status " had to be sent in one copy duly signed by the athlete and countersigned by the President or Secretary of the National Federation concerned and attached to form ST 2. Lastly, for the women's athletics events, one copy of the medical certificate, form ST 8, had to be attached to form ST 2 as laid down in Art. 17 (Para. 3) of the I.A.A.F. rules. In the case of each form, interested parties were reminded of the dates established for submission as indicated for each sport in Table No. 6. 146
TABLE NO. 6
SPORT
PERIOD OF COMPETITION
MAXIMUM DATE ESTABLISHED FOR RECEIPT OF FORMS
Swimming & Waterpolo
from 25 August to
3 September
11th August 1960
Boxing
from 25 August to
3 September
11th August 1960
Football
from 26 August to 10 September
11th August 1960
Canoeing
from 26 August to 29 August
11th August 1960
Cycling
from 26 August to 30 August
11th August 1960
Hockey
from 26 August to
9 September
11th August 1960
Wrestling
from 26 August to
6 September
11th August 1960
Basketball
from 26 August to
9 September
11th August 1960
Modern Pentathlon
from 26 August to 31 August
11th August 1960
Fencing
from 29 August to 10 September
14th August 1960
Yachting
from 29 August to
7 September
14th August 1960
Rowing
from 30 August to
3 September
15th August 1960
Athletics
from 31 August to 10 September
16th August 1960
Gymnastics
from 5 to 10 September
21st August 1960
Equestrian Sports
from 5 to 11 September
21st August 1960
Shooting
from 5 to 10 September
21st August 1960
Weightlifting
from 7 to 10 September
23rd August 1960
The Entries Office of the Technical Section was in operation to receive entries ever since 20th June 1960 and had taken all necessary steps for the checking and filing of entries as received. Eight weeks before the beginning of the Games, the Olympic Committees submitted the ST 1 forms, duly completed, to the Organising Committee. Thus 67 National Olympic Committees has submitted their entries regularly within the prescribed time, whereas the Olympic Committees of Chile, Colombia, Malaya, Mexico, Philippines, Sudan and Tunisia had only sent their entries telegraphically and with delay and it was only after a number of reminders that their ST 1 forms were submitted. The Olympic Committees of Lebanon, Haiti and Viet-Nam sent in their entries after considerable delay. 147
Hong Kong
Great Britain
Dutch Antilles
Czechoslovakia
Chinese Rep. of Formosa
Irak
Iran
India
Indonesia
Iceland
Hungary
Holland
Greece
Haiti
Ghana
France
Germany
Finland
Figi
Ethiopia
Denmark
Cuba
Colombia
Chile
Ceylon
Burma
Canada
Bulgaria
Bermuda
Brazil
Bahamas
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Belgium
2
Austria
Antilles
Argentine
1
Australia
Afghanistan
EVENTS
British Guiana
TABLE OF
ATHLETICS Men
100 metres 200 metres 400 metres 800 metres 1,500 metres 5,000 metres 10,000 metres 110 metres hurdles 400 metres hurdles 3,000 metres steeplechase High jump Long jump Hop, step e jump Pole vault Shot put Discus Javelin Hammer 4 × 100 metres relay 4 × 400 metres relay Decathlon 20 kms. Walk 50 kms. Walk Marathon
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × ×× × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × ×
× × × × × × × × × × × ×
×
× × ×
× ×
× × × × × × × × × × × × × × ×× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × ×
× ×
× × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × ×
× × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × ×
×
Ladies
× × × × × ×
100 metres 200 metres 800 metres 80 metres hurdles High jump Long jump Shot put Discus Javelin 4 × 100 metres relay
× × ×
×
× × × × × ×
× ×
BASKETBALL
×
× × × × × × ×
×
×
× × × × × × × × × ×
× × × × × × × × × ×
× × × × × ×
× × × × × × × × × × × ×
× × × × × × ×
×
× × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × ×
×
× × × × × × × × × ×
× × × ×
× ×
×
BOXING
Fly-weight Bantam-weight Feather-weight Light-weight Light welter-weight Welter-weight Light middle-weight Middle-weight Light heavy-weight Heavy-weight
148
× × × × × × × × × ×
× × × × × × × × × ×
× × × × × × ×
× ×
× × × ×
× × × × × × × × × × × × × × × × × ×
× × × × ×
× × × × × × × × × × × × × ×
× × × × × × ×
× × × × × × × × × × ×
× × × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× × × ×
× × ×
×
× × × × × × × × × ×
× × × × × × × × × × × × × × × × ×
TOTAL
Yugoslavia
Viet-Nam
Uruguay
United States of America U.S.S.R.
United Arab Republic
Turkey
Uganda
Thailand
Tunisia
Sweden
Switzerland
Sudan
Surinam
Spain
South Africa
San Marino
Singapore
Rhodesia
Rumania
Portugal
Puerto Rico
Philippines
Poland
Panama
Peru
Norway
Pakistan
Nigeria
New Zealand
Monaco
Morocco
Mexico
Malta
Luxemburg
Malaya
Liberia
Liechtenstein
Korea
Lebanon
Kenya
Japan
Israel
Italy
Ireland
Venezuela
TABLE NO. 7
ENTRIES BY NATIONS
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
× × × × × × × × × ×
× × ×
× × × × × × × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × ×
× × × × × × × × × × ×
× × × × × × × × × × × × × × × × × × × × × ×
× ×
× × × ×
× ×
× × × × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× × ×
× × ×
× × × × ×
× × ×
×
× × ×
×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
×
×
×
× × ×
× × ×
× ×
× × × × × × × × ×
× × ×
× ×
× × × × × × × × × ×
× × × × ×
× × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × ×
× × × × ×
× × × × × ×
× ×
× × ×
× ×
× × ×
× ×
×
× × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × ×
× × × ×
×
×
×
× × × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × ×
× × × × × × × × × × × × × × ×
× × × × × × × × × ×
×
×
×
× × × × × × ×
× × × × × × × × × × × ×
× × × ×
× × × × × × × × × ×
×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
57 55 53 49 41 40 37 38 35 30 39 47 39 31 26 30 26 29 28 31 28 24 24 41
× × × × ×
×
31 30 22 23 19 24 21 24 20 16
×
16
× × × × × × × × × × × × × × × × × × × × × ×
× × × ×
×
× ×
× × × × × × × × × ×
×
×
×
× × × × × × × × × × × × × × ×
× × × × × × × × × ×
× × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× ×
× × ×
× × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× × × × ×
× × × × × ×
41 47 48 45 39 43 36 36 30 26
149
Irak
Iran
Indonesia
India
Iceland
Hong Kong
Hungary
Haiti
Holland
Greece
Great Britain
Germany
Ghana
France
Figi
Finland
Ethiopia
Denmark
Dutch Antilles
Cuba
Czechoslovakia
Colombia
Chile
Chinese Rep. of Formosa
Ceylon
Burma
Canada
Bulgaria
Brazil
British Guiana
Bermuda
Bahamas
Belgium
Australia
Austria
Argentine
Afghanistan
Antilles
EVENTS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
CANOEING Men
× × × × × × × × ×
Kayak singles Canadian singles Kayak pairs Canadian pairs K1 4 × 500 metres relay
× × × ×
× × ×
× × × ×
× × × × ×
× × × × × × × × × × × × × ×
×
×
×
×
×
×
× × × ×
× × × × × ×
×
× × × × × × × × × × ×
× × × × × ×
× × × × × ×
× × × × × ×
× × × × × ×
× × ×
×
× × × ×
× ×
× ×
× ×
× × × × × ×
× × × × × ×
× ×
× × × × × ×
× × × × × ×
× × × × ×
× ×
× ×
× ×
× ×
×
×
×
×
× × × × × × × × ×
× × ×
× × ×
× ×
× × × × ×
× × × × ×
Ladies
×
× × × ×
Kayak singles Kayak pairs
× ×
CYCLING
1,000 metres time-trial Individual scratch Tandem 4,000 metres team pursuit Individual road scratch 100 kms. team time-trial
× × × × ×
× × × × × × × × × × ×
×
× ×
× × ×
× × ×
× × ×
× ×
× ×
× × ×
× ×
× × ×
×
× ×
× × × ×
× × × × × ×
× ×
× × × × × ×
× × ×
EQUESTRIAN SPORTS
Dressage Grand Prix Individual three-day event Team three-day event Individual Grand Prix jumping Team Grand Prix jumping
× × × × ×
×
× ×
×
×
× × × × × ×
× × × × × × × ×
× × × × × ×
× × ×
× ×
× ×
×
× × × × ×
×
FENCING Men
Foil (team) Epée (team) Sabre (team) Foil (individual) Epée (individual) Sabre (individual)
× × × ×
× × ×
× × × × × ×
×
× × × × × × × ×
Ladies Foil (team) Foil (individual)
×
FOOTBALL
×
×
×
×
GYMNASTICS Men
Team event Individual event Individual apparatus event
150
× × × × × × ×
× × ×
× × ×
× ×
× × ×
TOTAL
Viet-Nam
Yugoslavia
Venezuela
U.S.S.R.
Uruguay
United States of America
United Arab Republic
Turkey
Uganda
Thailand
Tunisia
Sweden
Switzerland
Sudan
Surinam
Spain
South Africa
Singapore
Rumania
San Marino
Rhodesia
Portugal
Puerto Rico
Philippines
Poland
Panama
Peru
Norway
Pakistan
Nigeria
New Zealand
Morocco
Mexico
Monaco
Malta
Luxemburg
Malaya
Liechtenstein
Lebanon
Liberia
Kenya
Korea
Italy
Japan
Ireland
Israel
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
× × × × ×
× ×
× ×
× × × × × × × × ×
× × × × × × × ×
×
×
× × × × × × ×
× ×
× × × ×× × × × × × ×
×
×
× ×
× ×
× ×
×
× ×
× ×
× × ×
× × × ×
× × × × ×
× × × × × × × × × × × ×
× × × × × ×
× × × × × ×
× × × × ×
×
× ×
×
× × × ×
× ×
×
×× ×× × ×
× ×
× × × × ×
×
× ×
× ×
×
× × × ×
×
×
×
× × × × ×
× ×
× ×
×
× × × × × ×
×
×
× × × × × × ×
× × × × ×
× ×
× × ×
× × ×
× × ×
× × × ×
× × × × ×
× ×
×× ×× × ×× × × ×
× × × ×
× × × × × ×
× × × × × × × ×
×
× × × × × × ××
× × × × ×
×
× × × ×
× × ×
×
× × × ×
× ×
× × × × ×
× × × × ×
× × × × × × × ×
× ×
× × ×
× × ×
×× × × × ×
× ×
24 16 24 14 20 17 14
× × ×× × ×
× ×
30 24 18 22 42 37
27 41
×× × × ×× × × × ×
24 25 21 35 36 33
17 21 19
× × × × × × × ×× × ×× × ×× ×× × ×
15 26
×
×
16
× ×× × × × ×× ×
× × ×
23 29 29
× × × × × ×
× × ×
× × × × × ×
×
× × × ×× × ×× × × × × × × ×
×
×
× × × × ×
× × × × × ×
× × × × ×
× ×
151
Iran
Irak
Indonesia
Iceland
India
Hong Kong
Hungary
Haiti
Holland
Greece
Ghana Great Britain
France
Germany
Figi
Finland
Ethiopia
Denmark
Dutch Antilles
Cuba
Czechoslovakia
Colombia
Chinese Rep. of Formosa
Ceylon
Chile
Burma
Canada
Bulgaria
Brazil
British Guiana
Bermuda
Bahamas
Belgium
Austria
Argentine
Australia
Antilles
Afghanistan
EVENTS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
GYMNASTICS
Ladies Team event Individual event Individual apparatus event
× × × × ×
× × ×
HOCKEY
×
×
× × × × ×
×
× × × × × × × × × × ×
× × × × ×
× × ×
× × × × × × × × ×
× × ×
× × ×
×
× ×
×
×
×
× × × × × ×
× ×
× × × × ×
× ×
× × × ×
MODERN PENTATHLON
Individual event Team event
× ×
× ×
ROWING
Fours with cox Pairs without cox Single sculls Pairs with cox Fours without cox Pairs with cox Eights
× × × × ×
× × × × × × × × × × × × ×
× × × × × × ×
×
× × × × × × ×
× × × × ×
× × × × × × ×
× × × × × × ×
× × × × × × ×
× × × × × ×
× × × × × ×
× × × × × ×
× × × × × ×
× × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × × × × ×
×× × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × ×
×
×
×
×
× × ×
×
×
×
×
× × × ×
× × × × ×
SHOOTING
300 metres free rifle 50 metres small-bore rifle Small-bore rifle – 60 shots Free pistol 25 metres automatic pistol Clay pigeon
× × × × × × ×
× × × × × × × × ×
× × ×
× × × ×
× × × × × ×
× × × × × ×
× × ×
× × × × × × × × × × × × × ×
× × × ×
× × × × ×
×
× × × ×
× × × × × ×
× × × × × × × ×
SWIMMIMG Men
100 metres free style 400 metres free style 1,500 metres free style 200 metres breast stroke 200 metres butterfly 100 metres backstroke 3 metres springboard diving 10 metres high diving 4 × 200 metres free style relay 4 × 100 metres medley relay
152
× × × × × × × × × × ×
× × × × × × × ×
× ×
×
×
× × × ×
×
× × × ×
× × × × × × × × × × × ×
× ×
× × × ×
× × × × × ×
× × × × × × ×
× ×
×
×
× ×
TOTAL
Viet-Nam
Yugoslavia
U.S.S.R.
Uruguay Venezuela
United States of America
Uganda
United Arab Republic
Turkey
Thailand
Tunisia
Sweden
Switzerland
Surinam
Spain
Sudan
South Africa
San Marino
Singapore
Rhodesia
Rumania
Puerto Rico
Portugal
Poland
Peru
Philippines
Panama
Pakistan
Nigeria
Norway
Morocco
New Zealand
Monaco
Malta
Mexico
Malaya
Liechtenstein
Luxemburg
Lebanon
Liberia
Korea
Kenya
Italy
Japan
Ireland
Israel
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
× × × × × × × ×
× ×
× × ×
× ×
× × ×
×
× ×
× × ×
×
× × × × × × × × × ×
×
× × × × × ×
× × × × × × × × × × × ×
× × × × × × × × × ×
× × × ×
×
× × × × × × × × × × × × × × × × ×
× × × × × × × ×
× × × × × × × × × × × × × × × × × × × ×
×
×
× × × × × × ×
× × × × × ×
× × × × × × × × × ×
× × ×
× × × × ×
×
× ×
× ×
× × × × × × × × × × × × × × × × × × × × × × × ×
× × × × ×
× × ×
× × × × × ×
× × × × × ×
× × ×
× × × × × ×
×
×
× × ×
× ×
× ×
× × × ×
× × × × × × × ×
× ×
×
× × × × × × × × × × ×
× × × × × ×
× × × × ×
× ×
× × × × ×
× × × ×
× × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × × × × × × × × × × × × × × × ×
× × × × ×
×
× × × × × × ×
× × × × × × × ×
× × × × ×
× ×
19 28 28
16
× ×
× × × ×
× × × × × ×
× × × × × ×
× × × × × × × × × ×
× × × ×
×
× × × ×
×
× × × × ×
×
× × × × × × × ×
× × × × × × × × × ×
× × × × × × × × × ×
× × × × × ×
25 18
× × × × × ×
27 25 24 24 24 21 17
× × × ×
31 45 48 46 42 43
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
42 32 31 39 33 41 22 21
× × × ×
24 26
153
Irak
Iran
Indonesia
India
Hungary
Iceland
Hong Kong
Holland
Haiti
Greece
Ghana
Great Britain
France
Germany
Finland
Figi
Ethiopia
Denmark
Dutch Antilles
Cuba
Czechoslovakia
Chinese Rep. of Formosa
Colombia
Chile
Ceylon
Burma
Canada
Bulgaria
British Guiana
Bermuda
Brazil
Belgium
Austria
Bahamas
Argentine
Australia
Afghanistan
Antilles
EVENTS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 SWIMMING
Ladies
× × × × × × × × ×
100 metres free style 400 metres free style 200 metres breast stroke 100 metres butterfly 100 metres backstroke 3 metres springboard diving 10 metres high diving 4 × 100 metres free style relay 4 × 100 metres medley relay
× × × × ×
× ×
× × × × × × ×
×
×
×
×
× ×
WATERPOLO
× × × × ×
×
×
× × × × × × ×
× × × × × × ×
× × × × × × × × × × × × × × × × × × × × × ×
× ×
×
×
×
× ×
×
×
×
×
×
× × × × × × × × ×
× × × × × × × × × × ×
× ×
×
WEIGHTLIFTING
× × × × × × × × × × × × × × × ×
Bantam-weight Feather-weight Light-weight Middle-weight Light heavy-weight Heavy light-weight Heavy-weight
× ×
× × × × × × × × ×
× × × × × × × × × × × × ×
× × × × × × × × × × × × × × ×
× × × × × × ×
× × × × ×
× × × × × × ×
× × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × ×
× × × × × ×
× × × × × × × × ×
× × × × × × ×
× × × × × × × × × × × × × × × ×
WRESTLING
Greco-Roman Fly-weight Bantam-weight Feather-weight Light-weight Welter-weight Middle-weight Light heavy-weight Heavy-weight
× × × × × × × × × × × ×
× × × × × × ×
× × × × × × × × × × × ×
×
× ×
×
× ×
× × × × × × ×
×
× × × ×
× × × × × × × ×
× × × × ×
× × × × ×
× × × ×
× × × × ×
× × × × × × × ×
× × × ×
Free style Fly-weight Bantam-weight Feather-weight Light-weight Welter-weight Middle-weight Light heavy-weight Heavy-weight
× × × × × × × ×
× × ×
×
× × ×
× × × × ×
× × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × × × ×
× × × × × × × ×
YACHTING
International 5.5 Dragons Stars Flying Dutchman Finn
154
× × × × × × × × × × × × × ×
× × × × × × × × × × × × × ×
× × × × × × × × ×
×
× × × ×
× × × × × × × × × × × × × ×
× × × × ×
× × × × ×
× × × ×
× × ×
× ×
TOTAL
Yugoslavia
Viet-Nam
Venezuela
U.S.S.R.
Uruguay
United Arab Republic
United States of America
Uganda
Tunisia
Turkey
Switzerland
Thailand
Surinam
Sweden
Sudan
Spain
South Africa
Singapore
Rumania
San Marino
Rhodesia
Portugal
Puerto Rico
Poland
Peru
Philippines
Panama
Norway
Pakistan
Nigeria
New Zealand
Monaco
Morocco
Malta
Mexico
Luxemburg
Malaya
Liechtenstein
Lebanon
Liberia
Kenya
Korea
Italy Japan
Ireland
Israel
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
× × × ×
× × × × × × ×
× × × × × × ×
× ×
× × × ×
× × × × × × ×
× × × × × × ×
× ×
× ×
× × ×
× × ×
× ×
×
× ×
× × × × × ×
× × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × × ×
× × × × × × × ×
× × × × × ×
×
× × ×
×
× × ×
× × × × ×
×
× × ×
× ×
×
× × × × × × × ×
× × × × × ×
× × × × × ×
× ×
×× × × × × × × × × ×
× × ×
× × ×
× × × × × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× ×
× × ×
× × × ×
× × × × × × × ×
× × × × × × ×
× × × ×
× × × × ×× × × × × × ×
× ×
×
× × × × × ×
×
× × × × × × × ×
× × × × × × × ×
× × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × ×× ××
× × × × ×
× × × × × ×
× × × ×
×
× × × × × × × × ×
× × × × × × × ×
×
×
×× × ×
32 25 27 23 29 17 16
×
16 18
× × ×
× × ×× × × ×× × × × × ×
×
× × × × × × ×
×× × ×
×
×
× × ×
× × × × × × × ×
×
× × ×
×
× × ×
× ×
× × × × × ×
× × × × × × ×
××
× × × × × × × × × × × × × × × × × ×
× × × × ×
× × ×
×
16
× × × × × × ×
× × × × × × ×
× × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
× × × × × × × ×
23 23 29 29 28 25 23 21
× × × × ×
× × × × × × × ×
20 29 27 36 38
34 37 43 32 28 33 26
× ×
× × × × × × ×
× ×
27 30 29 28 32 29 27 24
155
The Organising Committee took up the matter of these latter Committees with the International Olympic Committee and the International Sports Federations concerned and obtained authority to accept the entries in question. This brought the number of entries from Olympic Committees up to 86. The entry of Somalia only was accepted " sub judice " as the Somalia Olympic Committee was still awaiting recognition by the I.O.C. On 22nd July 1960 the exact situation on participants was finally known and the Technical Section, through the Entries Office, was able to prepare the table of entries. (Table No. 7). All ST 1 forms (entries by nations) were filed in appropriate files together with all incoming and outgoing correspondence and proposals for variations so that quick reference could be made at any moment to matters dealing with each National Olympic Committee. In the meantime, arrangements were made for the arrival of forms, as per the prescribed time limits, in respect of the various sports. A file was kept for each sport together with a sub-file for each Olympic Committee. These files were used to hold the yellow copies of all forms, carefully classified, so that any document required could be found quickly and easily. Unfortunately, notwithstanding the clear instructions outlined in the " Entries " booklet, circulars sent out by the Organising Committee and by the I.O.C, quite a number of Olympic Committees submitted the ST 2 forms and other forms with a number of imprecisions, errors and omissions. This caused considerable additional work which necessitated the Technical Section having to telegraph for details and modifications. Less serious irregularities were adjusted in agreement with the technical stewards (uncertainties in connection with the weight categories in boxing, wrestling and weightlifting; the lack of designation of reserves; forms not signed by Presidents of National Olympic Committees, etc.). We regret to remark that only 40 % of the forms arrived correctly compiled in every respect. Some forms contained entries over and above those allowed, reserves which were not permitted, teams in larger number than prescribed, etc. In cases of this kind, one had to refer back to the interested parties constantly and with great loss of time. Upon expiry of the time limit for entry to the various sports, a notary designated for the purpose made out his official statement on the names of the National Olympic Committees which had entered within the prescribed period. The Olympic Committees which sent in their entries with delay are listed in Table No. 8. 156
TABLE NO. 8
ENTRIES WHICH ARRIVED WITH DELAY COUNTRY
Argentine
Belgium
SPORT
DATE OF ARRIVAL
NUMBER
TOTAL
OF ATHLETES
12th August 1960
13th August 1960
Cycling Swimming Waterpolo Boxing Wrestling Football Modern Pentathlon
8 4 8 10 2 18 4
54
Canoeing Wrestling Cycling Swimming Waterpolo Hockey Boxing Modern Pentathlon
4 5 14 3 11 18 4 1
60
Malaya
13th August 1960
Swimming
2
2
Morocco
12th August 1960
Cycling Wrestling Modern Pentathlon Boxing
6 7 2 7
22
19
19
U.A.R.
12th August 1960
Football
Venezuela
12th August 1960
Cycling Swimming Wrestling Boxing
9 3 2 3
17
Germany
13th August 1960
Cycling Swimming
12 3
15
Greece
13th August 1960
Swimming Boxing Wrestling
2 2 3
7
Lebanon
12th August 1960
G.R. Wrestling
6
6
Indonesia
16th August 1960
Fencing
1
1
Norway
17th August 1960
Athletics
11
11
Malaya
17th August 1960
Athletics
3
3
Liechtenstein
16th August 1960
Fencing
1
1
Spain
16th August 1960
Rowing Yachting Fencing
21 12 12
45
263
263
Total
157
At the request of the Organising Committee, the International Olympic Committee and the International Sports Federations gave their approval to the acceptance of the entries which arrived late and it was only after such approval that the position of each Olympic Committee could be put in order. This was not the case, however, for some Committees which had submitted entries for athletes or had requested changes in certain sports subsequent to submission and confirmation of entries, as these were not approved by the I.O.C. and the International Sports Federations concerned. The Committees in question are listed in Table No. 9. TABLE NO. 9
COUNTRY
SPORT
ENTRIES REQUESTED
SUBSTITUTIONS REQUESTED
TOTAL
Austria
Swimming
1
1
Finland
Swimming
1
1
France
Swimming
1
Swimming
1
Athletics
1
U.A.R.
2
3 2
Once the entries were finally closed, a few minor changes were still necessary but these were relative to the spelling of Christian names and surnames, and, in a few cases, the signing of forms which had arrived without signature. The final situation of entries and participation of athletes in the Games of the XVII Olympiad will be seen from Table No. 10. Notwithstanding the arrangements made in agreement with the I.O.C. for a revision of the number of competitors owing to the increase in number of participating nations (84 as opposed to 69 in Helsinki and 67 in Melbourne), the total number of athletes entered and participating in the Rome Games was superior to that of any previous Games. In fact, in Rome there were 5,915 entries as opposed to the 5,859 in Helsinki and 5,337 actual participants as opposed to the 4,925 of the 1952 Games. From these data, it will be seen that whereas, in the 1952 Games, the athletes entered but who did not participate reached a percentage of 19 %, in Rome this was reduced to about 9.2 %.
Competition officials. In Rome there were 1,096 officials as opposed to the 1,863 in Helsinki and 1,830 in Melbourne. This shows that the formation of Juries was calculated correctly and this was confirmed from the few appeals made. 158
TABLE NO. 10
FINAL STATE OF ENTRIES ATHLETES PRESENCES
NATION entered
Afghanistan Antilles Argentine Australia Austria Bahamas Belgium Bermuda Brazil British Guiana Bulgaria Burma Canada Ceylon Chile Chinese Republic Colombia Cuba Czechoslovakia Denmark Dutch Antilles Ethiopia Figi Finland France Germany Ghana Great Britain Greece Haiti Holland Hong Kong Hungary Iceland India Indonesia Irak Iran Ireland Israel Italy
13 14 101 200 119 17 108 11 90 6 117 11 86 5 9 35 17 12 122 122 5 12 2 120 253 321 15 274 52 1 124 4 201 9 65 36 22 25 52 23 302
non participants
1 — 12 13 15 4 9 2 14 1 22 1 1 — — 9 1 — 7 23 — 2 — 4 21 31 2 24 4 — 15 — 17 — 19 12 1 2 3 — 27
OF
participants
12 14 89 187 104 13 99 9 76 5 95 10 85 5 9 26 16 12 115 99 5 10 2 116 232 290 13 250 48 1 109 4 184 9 46 24 21 23 49 23 275
IN
ATHLETES
COMPETITIONS
16 20 99 248 123 14 124 9 84 6 104 10 124 5 9 30 23 14 129 104 5 15 3 143 275 340 15 306 59 1 129 4 232 11 50 29 28 24 57 36 317
159
ATHLETES
NATION entered
Japan Kenya Korea Lebanon Liberia Liechtenstein Luxemburg Malaya Malta Mexico Monaco Morocco New Zealand Nigeria Norway Pakistan Panama Peru Philippines Poland Portugal Puerto Rico Rhodesia Rumania San Marino Singapore South Africa Spain Sudan Surinam Sweden Switzerland Thailand Tunisia Turkey Uganda United Arab Republic United States of America U.S.S.R. Uruguay Venezuela Viet-Nam Yugoslavia
Total
160
non participants
participants
PRESENCES OF ATHLETES IN COMPETITIONS
182 31 41 21 5 6 53 9 11 73 13 54 38 13 43 49 8 31 43 223 71 29 15 129 10 6 59 159 10 1 151 161 20 51 56 12 83 305 299 38 39 4 127
21 3 6 3 1 1 2 — 1 4 2 7 1 1 4 4 2 — 3 31 5 2 1 26 1 1 4 15 — 1 15 10 — 12 7 3 9 13 17 5 2 1 12
161 28 35 18 4 5 51 9 10 69 11 47 37 12 39 45 6 31 40 192 66 27 14 103 9 5 55 144 10 —
202 31 39 21 6 8 66 11 13 101 13 73 47 15 43 54 8 33 49 235 85 29 22 123 12 5 69 160 13 —
136 151 20 39 49 9 74 292 282 33 37 3 115
176 175 24 50 55 15 76 347 332 39 56 6 130
5,915
578
5,337
6,441
The badges worn by technical delegates, competition judges and timekeepers.
In this respect, only two appeals against two decisions in Wrestling, four in Cycling and one in the Men's 100 Metres Free Style Swimming event were officially made. These appeals, which were not accepted in part, were put forward against decisions made by foreign judges appointed by the International Sports Federations. In fact, it should be stated that no appeal was made against any decision of Italian judges and timekeepers even though these formed 60 % of the whole group. Table No. 11 shows the formation of judges. TABLE NO. 11
TOTAL
COMPETITION OFFICIALS
SPORT
Italian
GENERAL
Foreign Men
Men
Athletics
Cycling
—
205
12
10
17
—
27
—
6
—
40
—
46
—
46
(a) 16
—
15
—
31
—
31
37
7
—
44
—
44
2
— —
14
—
42
25
— —
16
—
67
—
67
16
—
19
—
35
—
35
3
6
40
27
43
33
76
—
20
—
20
—
20
—
11
—
35
—
47
—
—
45
2
Equestrian Sports Fencing Football Gymnastics —
Hockey Modern Pentathlon Rowing
Women
22
Boxing Canoeing
Men
12 —
183
Basketball
Women
TOTAL
Women
8
—
(a) 12
—
217 (b)
(d)
(c)
27
16
11 47
Shooting
30
2
15
Swimming & Waterpolo
12
1
82
4
94
5
99
32
—
32
(e)
47
8
—
24
—
Wrestling
13
52
—
65
—
65
Yachting
21
— —
13
—
34
—
34
182
—
—
182
—
182
1,044
52
1,096
Weightlifting
Timekeepers Total (a) (b) (c) (d) (e)
601
21
— 443
31
Ten judges acted for both canoeing and rowing competitions. Scorers not included. Consisting of the Jury of Appeal. Judges assigned to the individual sports acted for the five tests Military personnel acting as obstacle judges are not included. Signallers and military judges are not included.
161 11.
TABLE NO. 12
ORGANISATIONAL CHART OF JURIES FOR ATHLETICS A - DIRECTING SERVICES 1 Head of organisation services 1 Assistant
1 Competition Director
| 1 Head of technical services 1 Assistant
1 Vice-director COMPETITION DIRECTORATE
1 Head of Group for races 1 Assistants
1 Secretary 2 Secretariat staff
1 Head of Group for jumps 1 Assistant 1 Head of Group for throws 1 Assistants
1 Director for meetings
B - TECHNICAL SERVICES 1 Vice-director for arena meetings MEETINGS DIRECTORATE
1 Protocol steward 1 Assistant
1 2 12 10
1 Arena Director 3 Assistants
Head of competitor services Competitor stewards Competitor assistant stewards Competitor guides 1 Head of attendants 1 Assistants
ARENA DIRECTORATE
1 Official measurer 3 Anemometrists
1 Head equipment storekeeper 1 Assistant
Referee Judge 6 Jury secretaries 20 Finish judges
RACE JURY
1 Head control judge 3 Section stewards 30 Control judges 1 Timekeeping services steward
3 Start judges 6 Assistants 3 Referee Judges
COMPETITION
1 Referee Judge 1 Jury President
6 Jury secretaries 17 Competition judges
JURY
ROAD EVENTS JURY
1 Head of Secretariat 3 Assistants
4 6 1 2
Course inspectors Supply stewards Leader Couriers
18 International Walk judges
C - ORGANISATIONAL SERVICES 1 Vice-director booth meetings 1 Head of announcers
1 Secretary for Nations 4 Secretariat assistants
1 Head of Secretariat SECRETARIAT
1 2 1 2 1
Secretary-General Secretariat assistants Statistics and Records steward Committee control stewards Archives and Supervision steward
162
1 Jury of Appeal secretary 1 Secretariat assistant 1 Jury secretary 3 Secretariat assistants
In general, the work of the Juries was scrupulous, efficient and efficacious and thanks to the order and discipline of the judges, their movement and numbers were not evident in the competition arenas. (Table no. 12).
Accompanying Officials. Ever since May 1958, the I.O.C., as a result of a proposal put forward by the Technical Section, found it necessary to adjust the tables indicating the number of accompanying officials to be admitted to the Games. On the basis of this proposal, it was decided that the maximum number of officials should be as follows:— (a) up to 15 competitors, 1 official for each 3 competitors; (b) for the subsequent 85 competitors (from 15 to 100), 1 official for each 5 competitors; (c) for competitors exceeding 100 in number, 1 official for each 8 competitors. (Table No. 13). TABLE NO. 13
EXPLANATORY TABLE
Competitors
Officials
Competitors
Officials
Competitors
—
—
—
—
—
1-3 . 4-6 . 7-9 . 10-12 . 13-15 . 16-20 . 21-25 . 26-30 . 31-35 . 36-40 . 41-45 . 46-50 . 51-55 . 56-60 . 61-65 . 66-70 . 71-75 . 76-80 . 81-85 .
.............1 .............2 .............3 .............4 .............5 .............6 .............7 .............8 .............9 . . . . . . . . . . . . .10 . . . . . . . . . . . . .11 . . . . . . . . . . . . .12 . . . . . . . . . . . . .13 . . . . . . . . . . . . .14 . . . . . . . . . . . . .15 . . . . . . . . . . . . .16 . . . . . . . . . . . . .17 . . . . . . . . . . . . .18 . . . . . . . . . . . . .19
86-90 91-95 96-100 101-108 108-116 117-124 125-132 133-140 141-148 149-156 157-164 165-172 173-180 181-188 189-196 197-204 205-212 213-220 221-228
. . . . . . . . . . . . 20 . . . . . . . . . . . . 21 . . . . . . . . . . . . 22 . . . . . . . . . . . . 23 . . . . . . . . . . . . 24 . . . . . . . . . . . . 25 . . . . . . . . . . . . 26 . . . . . . . . . . . . 27 . . . . . . . . . . . . 28 . . . . . . . . . . . . 29 . . . . . . . . . . . . 30 . . . . . . . . . . . . 31 . . . . . . . . . . . . 32 . . . . . . . . . . . . 33 . . . . . . . . . . . . 34 . . . . . . . . . . . . 35 . . . . . . . . . . . . 36 . . . . . . . . . . . . 37 . . . . . . . . . . . . 38
229-236 . 237-244 . 245-252 . 253-260 . 261-268 . 269-276 . 277-284 . 285-292 . 293-300 .
Officials
—
. . . . . . . . . . . 39 . . . . . . . . . . . 40 . . . . . . . . . . . 41 . . . . . . . . . . . 42 . . . . . . . . . . . 43 . . . . . . . . . . . 44 . . . . . . . . . . . 45 . . . . . . . . . . . 46 . . . . . . . . . . . 47 BOATMEN
Rowing Canoeing 1 for each country Yachting GROOMS
For each two horses: 1 groom
Ancillary personnel were established as follows:— (a) a maximus of 3 masseurs for the first 100 competitors and 1 extra for each subsequent group of 50; (b) 1 boatman for each sport, namely, 1 for rowing, 1 for canoneing and 1 for yachting; (c) 1 groom for each 2 horses. 163
The training of horses for the Modern Pentathlon. Another problem of undoubted difficulty was that of the selection and training of horses for competitors in the riding event of the Modern Pentathlon. The riding event is the first of the Pentathlon and has considerable consequences, both as regards points and the morale of the competitors, when the result is partly governed by the luck of the draw. Particular care therefore was taken to resolve this problem which is rendered more difficult now that in Italy, as is many other countries, there are no longer any cavalry units. Owing to a shortage of suitable horses in Italy, it was at first thought opportune to find the necessary horses abroad. A plan was examined, but later abandoned, to import horses from the Argentine. Later, special negotiations were conducted in an endeavour to obtain, on loan, horses from Switzerland, Sweden and Hungary. However, in the end it was decided that the problem could be resolved locally by recruiting horses from Sardinian studs. Together with the direct co-operation of the Carabinieri Forces, who placed a first nucleus of horses at disposal, the training started and proceeded gradually under their care. At the same time, 60 horses were purchased from the Sardinian market and these formed the first nucleus of the preparation which started towards the end of 1958. Later, this preparation was divided up into three groups, two in Sardinia, namely at Cagliari and Sassari, and one in Rome under the guidance of capable instructors. It was a long and detailed preparation, subject to constant control and selection until, in the Spring of 1960, the horses selected were concentrated at Passo Corese to complete their training over the area of the course. After the final test for selection, undertaken over a timed course, the 67 horses (60 plus 7 reserves) required for the event were finally chosen. The horses which were eliminated were placed at the disposal of training schools in Rome, namely at Tor di Quinto. There was a loss of horses during training due to wounds or sickness, whilst others were eliminated owing to excess or lack of speed but these were replaced from an adequate supply of reserves placed at the disposal of the selectors. Prior to the drawing of lots, veterinary certificates were made available which attested to the state of health and capacity of the horses to cover the course. Again, before lots were drawn, team captains were given a list which indicated the number of the horses, their colour and main characteristics.
Training Grounds and their allocation. The Technical Services Section dedicated particular care to the preparation of training grounds and their allocation so as to facilitate, in the best way possible, athletes in every sport who wished to complete their training in 164
Rome. Particular care was devoted to the more complex sports which required more intense training. Thus, for the competitors in the Modern Pentathlon who had to undergo training in five different and varying sports, a training programme was devised whereby the competitors would not have to travel more than a mile away from the Olympic Village. These competitors had reserved for them the fencing hall and swimming pool at the Flaminio Stadium, a special arrangement for shooting at the Umberto I shooting range, a ground for cross-country running and an equestrian obstacle course at Tor di Quinto where 40 horses for training were stabled temporarily. Athletes in weightlifting and wrestling also had a number of venues reserved for them in the Acqua Acetosa area located in the immediate vicinity of the Olympic Village. Separate gymnasiums for men and women were available for training in gymnastics. These gymnasiums were equipped with apparatus exactly similar to that used for the competitions. Furthermore, teams, in turns, were able to acquaint themselves with the arena of the Caracalla Baths. A large number of training venues for running and jumping were prepared and provided with equipment and obstacles similar to those of the actual events. Moreover, in the said venues, the starting judges appointed for the competitions proper performed their duties in accordance with pre-established time-tables which were communicated to the athletes. Account was taken of the desire expressed by the boxers to train separately, and to this end seven gymnasiums, well equipped with 13 rings, mirrors, punching bags, boxing gloves, training and punch bag gloves, protective headgear etc., were placed at their disposal. Four venues were placed at the disposal of the swimmers for training purposes, one of these having more than one pool. Only in the case of fencers was it not possible to set up pistes in the immediate vicinity of the Olympic Village, so that the pistes in the Palazzo dei Congressi at the E.U.R. were used, with the advantage, however, that the athletes were able to use the same pistes for training as for the actual competitions. To facilitate training, in the case of the more complex sports, a number of brochures were prepared containing instructions regarding the time-table and places of training as well as other useful news on preparation. It is with pleasure that we report that all athletes undertook their training with an intensity and an availability of means that is without precedent. From Table No. 14, it may be seen that presences on the training venues reached the figure of 81,397. By dividing this figure by the number of participants (5,337), we reach the very significant conclusion that each athlete completed 15 sessions of training. 165
TABLE NO. 14
TRAINING VENUES AND ATTENDANCE OF ATHLETES
SPORT
FIELDS AND STADIUMS
VENUES AVAILABLE
Athletics
Basketball
Boxing
Equestrian Sports
166
from
to
PRESENCES TOTAL
Nations
Athletes
9/9 5/9 8/9 8/9 30/8 3/9
18 22 16 43 4 6
6,870 364 2,520 2,412 90 314
PRESENCES
Acqua Acetosa Tre Fontane Stadio delle Terme Farnesina Silvano Abba Eucalipti Stadium
1
8/8
1 1
13/8
1
10/8 19/8 17/8
Palazzetto dello Sport Palestra Foresteria American College Gymnasium Convitto Nazionale Gymnasium Y. M. C. A. Gymnasium
1
1/8
1
10/8
31/8 9/9
13 16
672 1,056
1 2
10/8 10/8
9/9 9/9
16 16
924 900
1
10/8
9/9
16
852
3
10/8
4/9
3
10/8
4/9
2
10/9
4/9 47
5,294
5,294
1
10/8
4/9
2 1 1
10/8 10/8 10/8
4/9 4/9 4/9
1
6/8
28/8
35
2,918
2,918
30 20 13
797 165 95
1,057
31
1,122
1,122
56
384
384
43
176
176
C. O. N. I. Via Sannio Gymnasium S. Croce in Gerusalemme Gymnasium Carabinieri Cadets Gymnasium C. S. I. C. Duilio Gymnasium Stadio Flaminio Gymnasium G. I. Gymnasium E. Fiermonte Gymnasium
Rowing and Canoeing Lake Albano Cycling
PERIOD OF TRAINING
1 1
9/8
Olympic Velodrome Grottarossa Circuit Viale C. Colombo
1
8/8
1
12/8
1
8/8
25/8 28/8 25/8
Pratoni del Vivaro Borghese Gardens Tor di Quinto Cesano Range (300 m. shooting) Umberto I Range (50 m. aut. pistol) Lazio Range
1 1
17/8 17/8 17/8
8/9 8/9 8/9
1
12/8
3/9
1 1
12/8 15/8
3/9 2/9
4
12,570
4,404
SPORT
FIELDS AND STADIUMS
VENUES AVAILABLE
PERIOD OF TRAINING
from
to
PRESENCES TOTAL
Nations
Athletes
PRESENCES
Fencing
Congress Hall
8
14/8
28/8
43
885
Football
Acqua Acetosa Fields
4
11/8
30/8
5
941
Tor di Quinto Fields
2
9/8
22/8
5
220
Tre Fontane Fields
1
22/8
28/8
2
90
Acqua Acetosa Gymnasium
1
8/8
9/9
15
3,721
G. Cesare Gymnasium
2
10/8
9/9
29
2,610
Caracalla Baths
1
10/8
9/9
29
3,915
Foro Italico Gymnasium
3
8/8
9/9
28
3,900
Caracalla Baths
1
8/8
9/9
28
900
Hockey
Acqua Acetosa Fields
4
8/8
9/9
16
7,396
Modern Pentathlon
Tor di Quinto (riding)
1
9/8
25/8
24
255
Flaminio Stadium Fencing Gymnasium
1
12/8
26/8
19
223
Flaminio Stadium Pool
1
12/8
29/8
17
196
Umberto I Range
1
9/8
28/8
24
251
Tor di Quinto (steeplechase course)
1
9/8
30/8
20
248
1
13/8
24/8
42
2,786
Acqua Acetosa
1
10/8
3/9
40
5,383
Foro Italico Pool
1
24/8
25/8
7
78
Piscina delle Rose
1
16/8
2/9
49
1,610
Swimming Stadium
1
14/8
24/8
16
266
Piscina delle Rose
1
16/8
2/9
16
872
Aniene Club Pool
1
8/8
2/9
19
3,693
Acqua Acetosa Gymnasium
8
10/8
6/9
53
6,547
6,547
Acqua Acetosa (4 under cover and 4 in openair)
8
10/8
5/9
46
6,486
6,486
Gymnastics (Men)
Gymnastics (Women)
Swimming and Diving Swimming Stadium
Waterpolo
Weightlifting
Wrestling
TOTALS
104
885
1,251
10,246
4,800
7,396
1,173
9,857
4,831
81,397
167
A view of the Mechanographic Centre.
The Mechanographic Centre. The Mechanographic Centre of the " Totocalcio " (Football Pools Dept.) was mobilised by the Organisation of the Olympic Games and, in collaboration with Messrs. Olivetti Bull Co. realised the automatic registration of both administrative and statistical services of events. Thus for the first time mechanisation played an integral part in the field of sport and contributed in a considerable degree to the organisational success by means of rapid, clear and timely elaboration of technical, personal and statistical data. Planned and realised to meet the requirements of work which included all the organising phases, the Electronic Centre carried out a vast programme, the full scope of which is not generally appreciated. Installed in a group of premises in the Olympic Stadium, the Electronic Centre began its activities as from June 1960. Previous to this, whilst all sectors of the Organisation worked for the preparation of the Games, specialised employees of the C.O.N.I. together with technicians from Messrs. Olivetti Bull Co. worked out the basis of their work down to the very slightest detail. 168
The Centre was entrusted with the following duties:— (1) elaboration of personal and numerical data in respect of accredited journalists, newspapers and Press Agencies; (2) elaboration of personal, technical and statistical data in respect of athletes in relation to individual entries to events and the convalidation of Olympic cards; (3) elaboration of personal and numerical data relative to the stay of athletes and accompanying personnel in the Olympic Village and statistical and accountancy data in respect of food consumption in each restaurant of the Village; (4) detailed elaboration of personal, numerical and statistical data relative to the components of the Italian delegation; (5) preparation of competition cards:—the results of each event were drawn up in a few seconds only because of the help of data previously prepared. This enabled the necessary information for the successive phases to be passed to field technicians in a very short time. The Mechanographic Centre also disposed, among other things, of a tabulating machine, with attached perforator, able to print 150 lines per minute, in addition to another sifting, inserting and translating machine. So as to give one an idea of the work performed by this system, the following are the phases of elaboration that the machines produced:— (a) sifting machine, which elaborated 25,714 forms (by elaboration is meant the passages through the machine); these forms, classified according to the final programme, then underwent a further total of 907,453 passages through the machine; (b) inserting machine, with which 18,271 forms were drawn up by means of a single passage through the machine. This classified the forms; (c) tabulating machine, with which 18,271 forms were drawn up by means of 132,468 passages through the machine. In all, for the elaboration of the data required, a total of 1,258,192 passages through the machines were recorded and which necessitated a total of 63 consecutive hours of work.
Flag Assembly Centre. Within the framework of the Technical Section a " Flag Assembly Centre " was set up working in collaboration with the military. It operated continuously from 11th July to 30th September 1960. In the months preceding the period of functioning, the Technical Section had carefully elaborated a plan of action for the use of flags. To this end, the material already in existence with the C.O.N.I. was catalogued and used. In other words, 2,826 flags were assembled and placed at the disposal of the 169
Centre. To supplement these and meet all requirements, at the same time another 1,685 flags in all were ordered. The Assembly Centre during the period of functioning kept in constant contact with the General Secretariat of the Games and with the various Sections of the Organisation and especially with the Cerimonial, Administration, Olympic Village and Olympic Military Detachment Sections, for the purpose of obtaining and guaranteeing a perfect collaboration. A special part of Palazzo delle Federazioni—the head-quartes of the Organising Committee of the Games—was placed at the disposal of the Flag Assembly Centre and here were assembled all flags necessary for the various sports manifestations (decoration of the city excluded). A further subsidiary depot was set up at the Olympic Stadium for greater convenience and rapidity of use of the flags during the various ceremonies foreseen at the Olympic Stadium and in other nearby sports venues. During the entire period of the Olympic events, the depots remained open uninterruptedly from 8 a.m.to midnight with shifts worked by two teams of sailors acting as store-keepers. The duties of the Flag Assembly Centre were various and particularly exacting. The 15 ceremonies of flag-raising at the Olympic Village, the ceremonies of Opening and Closing of the Games, the decoration of the 45 competition and training venues, the 150 prize-giving ceremonies, give some idea of the arduous work of collection of the flags at the conclusion of manifestations and of the movement of loading and unloading of same for the transport of the flags themselves. For its normal functioning, the Flag Assembly Centre was equipped with adequate personnel and sufficient means of transport. Besides a Head of Office who had the responsibility for the material and the various movements of same, the Centre disposed of an officer in charge of the detachment of sailors, two subordinate officers, eleven non-commissioned officers and a manual worker for the manipulation of the " mobile ladder ". In addition, 4 military lorries were used for the transportation of personnel and material destined for the various ceremonies. (Table No. 15). TABLE NO. 15
SUPPLIED BY
C.O.N.I.
Olympic flags Italian flags Rome flags Foreign flags
450 493 28 1,855
Total
170
2,826
Army
Snia-Viscosa
930
NEWLY
FLAGS
ACQUIRED
AVAILABLE
175 1,501
1,389 693 203 3,356
1,867 1,860 465 15,017
1,685
5,641
19,209
9
200
200
930
MOVEMENT
It should also be added that during the Olympic period, forty flags were purloined from their flagpoles by collectors and enthusiasts of Olympic souvenirs, namely, 20 Olympic flags, 6 Italian flags, 3 Rome flags and 11 foreign flags.
Timekeeping service. The timekeeping service required by the Rome Olympic Games was entrusted, for that which concerned the technical and organisational sector, to a selected director. This was Mr. Giovanni Romagna, President of the Italian Timekeepers Federation, who was assisted by a technical delegation whose tasks were co-ordinated by Mr. Lucio Di Paolo, Secretary of the same Federation. So that a scheduled plan could be worked out well in advance, the Italian Timekeepers Federation established a working agreement with the Technical Section of the Organising Committee as far back as June 1958 and, as its first step, selected the most suitable of its 1,700 federated timekeepers. At the same time, it appointed a special Commission to which was assigned the task of examining the capacity of each of the chosen timekeepers. The scheduled plan was studied and throughly worked out with especial reference to the particular requirements of each sports sector. In May 1959, three hundred timekeeper candidates underwent practical tests on the occasion of important sports meetings, when they were brought together, and more particularly in the case of athletics and swimming events such as the University Games of Turin, the National Championships etc. By means of these tests, 182 timekeepers were definitely selected, this number being considered necessary for the various services required by the Olympic events in the following sports:—athletics, canoeing and rowing, cycling, gymnastics, wrestling, swimming, modern pentathlon, boxing, fencing, weightlifting, equestrian sports, shooting and yachting. Again, the number of 182 timekeepers was also established on the basis of duty shifts which were so organised as to enable each individual timekeeper not to exceed the maximum time of 4 hours of consecutive duty. With the collaboration of the Italian Federation of Sports Doctors, the 182 timekeepers Mere asked to undergo a special technical examination and psychotechnical tests specially with reference to the exact estimate of the " reaction time " of each timekeeper. Having concluded this preliminary work and re-examined all the facts, including the results of the medical examinations and psychotechnical tests which the candidates selected in Spring of 1960 had to undergo, the Commission presented the list of timekeepers appointed for the various sports. As the same time in which the Commission was carrying out the work of selection and preparation of the timekeepers, the Timekeepers Federation, 171
after a series of studies and check-ups on the special apparatus, came to definite agreements with the Firm of Omega (of Bienne), encharged by the Organising Committee to supply the technical material, in part already approved by the competent International Sports Federations. In view of the constant progress in sports it is also evident that there be a technical advance in terms of adequate modern equipment. This was assured by the collaboration of the firm of Omega which, in addition to its reputation of reliability and efficiency, also possesses an organisation of undoubted skill of maximum guarantee. In order to facilitate the work of the timekeepers, and more particularly the transmitting of times and the registration of intermediate times as well as to achieve a prompt transmission of all results to the events Directorate, the Italian Timekeepers Federation studied and brought out special printed forms by acting in collaboration with the Technical Delegates of each single sports Federation. During the period of the Games, the timekeepers' work proved to be even more exacting and complex due to the fact that, in contrast to the procedure followed in preceding Olympic Games, it had then been decided to take the times not only of the first three arrivals in each event, but of all participants. The appointed timekeepers were employed to take the times of competitors in those events where the time factor is of prime importance. The taking of times was effected by using hand chronometers equipped with Class 'A' certificates. However, in the case of certain sports, electric apparatus piloted by quartz clocks and registration devices was used. This apparatus had, in part, already been tested by Messrs. Omega which also supplied all the hand chronometers for the Rome Games (See Table No. 16). In the case of athletics and swimming, the times of each competitor was taken by three timekeepers. This was also necessary for the ratification of records which can only be made on the basis of hand chronometers. In practice, for athletics on seven lanes, 21 timekeepers were necessary since it was even essential to take the times of the seventh runner to provide against the eventuality that the competitor might have equalled or beaten the record of his own country. The electric apparatus used for athletics consisted of a camera, which registered one hundred photogrammes per second, linked at the start with the starter's pistol. In less than two minutes, the film was developed and, by means of a special lens, the photogramme reproducing the exact second of arrival could be identified. In the case of road events (20 kilometre walk, 50 km. walk and Marathon), special timing points were set up along the routes, where interested parties could obtain information on the overall and relative positions, and the times of each competitor. 172
The starter's pistol connected to the electric timekeeping apparatus.
Special electric devices for the rowing events at Albano.
In the case of track events, for distances of over 400 metres, intermediate times were also taken, either lap by lap, or at the end of each kilometre. It may also he of interest to recall that a special timekeeping service was set up which provided for the recording, for statistical purposes, of the intervals of time between the starter's words: " On your marks " " Get set " and the pistol shot. TABLE NO. 16
OMEGA MATERIAL USED FOR THE VARIOUS SERVICES
Second timer to tenth of a second
125
Table second timer
60
Chronometers to tenth of a second
52
Chronometers for Hockey
12
(*) Swim-O-Matic Timer (for swimming events)
1
(*) Complete installation for Basketball
1
(*) Complete installation for Boxing
1
(*) Complete installation for the Velodrome
1
(*) Racend Omega Timer (photo-finish) for the Olympic Stadium and Velodrome
2
Large clocks, undoubted, for Olympic Stadium
2
Large clock, undoubled, for Swimming Stadium
1
Time Omega Recorder to hundredth of a second
8
Miniature photo-finish for Rowing
1
Large clock for the public at Lake Albano
1
Large clock for the public at Passo Corese
3
Large clock for the public at Basilica of Maxentius
3
Large clock for the public at Piazza di Siena
1
(In addition were supplied:—Photoelectric cells, starter pistols, material and tools for repairs, checking apparatus, oscillographs etc.). (*) Material donated to C.O.N.I. by Messrs. Omega.
The Registration of Times. All times taken and attributed to the various events were accompanied by photographic documentation at the finishes, this being effected by means of the Racend Omega Timer:— The protogrammes of finishes were however published without the times, as stipulated in the International regulations. 174
Judges at the finish in the swimming events.
Judges at the finish and timekeepers integrate electric timekeeping in the athletic events.
176
The intervention of the Italian timekeepers in the swimming events may be considered as of fundamental help. The Italian nucleus was placed at the disposal of the International Jury appointed by the F.I.N.A., and carried out their duties in collaboration with the timekeepers from other countries chosen by the F.I.N.A. itself. The swimming events called for the use of thirty timekeepers for the ten lanes of the pool. In addition, each lane was equipped with an apparatus connected with the starter's pistol whilst finishes were recorded by the timekeepers by means of the pressing of special buttons. For each lane, three times were recorded by the Omega-Swim-O-Matic Timer apparatus; each start recorded by the apparatus was set off by the pistol shot of the starter as the pistol was linked to the apparatus. For every finish, one timekeeper worked on a button independent of the other two timekeepers appointed to the same lane. In any case, in addition to the automatic system, the hand timekeeping service also functioned both for finishes and for the recording of intermediate times in the case of races over one hundred metres. Thus the time of each competitor was taken by three timekeepers, exception made for the time of the winner which was recorded by a fourth timekeeper also. This procedure permitted the ratification of national records set up by the athletes during the events, even if these were classified after the third position. In the case of other sports, there were no special technical applications or novelties. However, mention should be made of the adoption of large chronometers which worked in conjunction with the normal hand chronometers. Timekeeping operations for rowing events on Lake Albano were carried out by using the Time Omega Recorder apparatus. Use of this apparatus made it possible to obtain the times of arrival, as well as the recording of the intermediate times at the 500 metre, 1,000 metre and 1,500 metre points of the course. This was rendered possible by a system whereby a number of timekeepers were set at suitable intermediate points, ready to work special electrical devices which allowed the timekeepers on duty in the cabins at the finish to take down from the apparatus itself the intermediate times and communicate them immediately to journalists and public. The timekeeping arrangements made for the cycling events also required special technical devices. For the track events taking place at the Velodrome, the Firm of Omega installed photoelectric cell apparatus, this having proved its worth for those events requiring automatic time-keeping. Nevertheless, these apparatus which were linked to equipment writing to the hundredth part of a second, were always coupled, for double check purposes with the system of hand timing. For the gymnastic competitions and the wrestling contests, the timekeepers necessary for the recording of times were placed at the disposal of the respective 177 12.
Table second-counting clocks for gymnastics and wrestling.
Special photo-electric cells for the track cycling events.
Juries, as foreseen in the respective technical regulations. But, whereas for the gymnastic competitions, the timekeeping was carried out with special table second-timers, for wrestling, the timekeepers assisting the Jury disposed of chronometers linked with large dials which were also visible to the public, who thus had the possibility of following and keeping a check on the length of the bouts, as well as the vicissitudes of the fight itself. The tests in connection with Modern Pentathlon were timed by means of the same apparatus or by the manual system, conceived and adopted in similar events individually inserted into the Olympic programme. In the case of the equestrian test, a special timekeeping point halfway through the course was set up; this happy solution allowed the entire round of each competitor to be followed with greater interest. The boxing tournament did not require the appointed timekeepers to perform any special technical services. They disposed of a special clock for reading the times, this being attached to a huge circular apparatus, installed by Omega, above the ring. TABLE NO. 17
USE AND DUTIES OF THE TIMEKEEPERS TIMEKEEPERS ALLOTTED
SPORT
TOTAL PRESENCES
TOTAL NUMBER OF TIMES TAKEN
Athletics
33
372
5,689
Rowing
8
50
1,422
Boxing
6
60
978
Canoeing
8
30
948
10
40
2,144
4
40
1,406
22
264
628
9
54
680
Wrestling
12
70
651
Swimming
36
304
3,534
Modern Pentathlon
8
72
961
Weightlifting
2
20
121
Shooting
8
12
3,658
Yachting
10
72
828
Reserves
5
—
—
181
1,460
23,648
Cycling Equestrian Sports Fencing Gymnastics
Totals
179
DAILY TOURS OF DUTY AUGUST SPORT
25 M A
27
26 N
M A
N
M
A
30
29 N
M
A
N
M
A
N
Athletics 10
Rowing 7
Boxing
7
7 10
8
8
8
8
8
1
31 M
A
N
M
A
2 N
M
A
50 55
50 55
40 65
10 10
10 10
10 10
8
7
7
7
7
7
N
7
10
Canoeing
10 10
10
Cycling
10 10 10
10 10
10 10
Equestrian Sports 28 28
28 28
Fencing
28 28
28 28
28 28
Gymnastics 7
7
Wrestling Swimming and waterpolo
6 32 30 30 12
Modern Pentathlon
7
7
4 35 35 12 10
7
7
7
4 35 35
7
7
7
36 40 35
6
32
8
8
7
7
7
39 32
4 38
7
39 35 6
Weightlifting Shooting Yachting
8
8
13 71 57 54 33 73 60 53 81 60 85 82 55 138 100 53 138 100 53 117 114 52
TOTALS
13
182
166
N. B. - 28th August and 4th September were rest days.
180
194
222
297
291
283
TABLE NO 18.
PERFORMED BY TIMEKEEPERS SEPTEMBER TOTAL
M
A
50
55
N
M
A
7
6
5
3
N
50 55
M
A
N
M
A
8 N M
32 40
50 55
A
9 N M A N
10
11
M A
N M A
35
20
10 7
2
7
7
4
42
M
A
322
415
30
50
2
59
4
4
2
4
16
4
4
4
N
20
757 80
72
131 50
20
30
20
20
34
12
46
30
70
28 28
28 28
28 28
28 28
28 28
28 28
336
336
672
10 10
10 10
10 10
10 10
9
10
40
59
99
7
7
7
7
70
5
5
5
5
6 8
8
213
5
5
5
6
8
89 100 56 105 95 13 107 93
245
N
6
7
28 28
TOTALS
207
7 87 85
53 78
55 42
172
131
97
28 42 25
95
4
4
8
146
140
62
16
15
15
70
140
304
590 78
5
35
12
12
56
56
1,163 1,152
2,816
501
2,816
181
The system was appreciated by the public present, who in this way were always able to follow the length of each bout. The complex fencing tournament required an extremely exacting system of timekeeping, for which second-counting watches of large dimension were used. It may be interesting to record that the " warning " to juries and competitors of the " fifth minute " proved necessary in the case of 60 % of the épée events, in 40 % of the men's foil events, in 25 % of the women's foil events, whilst it was rarely necessary for the sabre events. It will also be of interest to note that, in the final of the individual épée, the Italian contestant Delfino, out of the seven bouts fought in the round, in six exceeded the time limit, being still level on points at the sixth minute; in fact, one of his fights was prolonged to 14 minutes 42 seconds. The weightlifting events did not involve the timekeepers in any particular duties, nor did they require any special technical equipment. According to the rules laid down in the International Regulations, the timekeepers placed at the disposal of the Jury used manual chronometers and furnished, at the stipulated intervals, due indications to the Jury. The timekeepers' duties in the equestrian sports were different. The dressage events were checked by means of manual chronometers whose indications were passed to the President of the Jury. On the other hand, the tests of the 3-day Equestrian events and the Grand Prix Jumping were checked by means of photo-electric cells and by the Omega Time Recorder. At the same time, to provide a double check, a service of manual timekeeping was arranged for at each timekeeping " point ". In the case of the events taking place at Piazza di Siena and at the Olympic Stadium, that is, for the individual and team Grand Prix events, a large clock was also linked to the writing apparatus, this being clearly visible and easily legible by the public. For the target-shooting events, qualified timekeepers expert in this type of event were chosen. According to the provisions of the International Regulations, the Jury had to be able to check, at any moment, the exact timing of the rotation of the silhouettes in the case of pistol shooting events. In order to carry out these technical requirements, the Italian Timekeepers Federation introduced a special device; this, inserted into the rotation system of the silhouettes, provoked electric contacts which allowed, by means of a writing apparatus adjusted to the hundredth part of a second, the constant examination and control of established times. Examined in relation to the complexity of the work carried out, (Tables Nos. 17 and 18) the evolution and progress achieved in agonistic and technical fields, we have no hesitation in affirming that the timekeepers proved to be right on top of their jobs, and this despite the ever greater difficulties involved and the greater experience of the athletes. There is however no doubt that all the timekeepers without exception rose to their task of following and 182
controlling such an exacting and complex manifestation as the Olympic Games, surpassing all expectations and showing that they possessed a level of preparation excellent from every point of view.
The Yachting Regattas. The Yachting regattas were held in the Bay of Naples for the following classes: 5.5; Flying Dutchman; Dragon; Star and Finn. The organisation of the operation known as « Sole Mio » was divided in various branches as shown in the following Table No. 19:—
TABLE NO. 19
The 138 craft from the 46 participating Nations are shown in Table No. 20. The regattas took place over the three courses located in the waters of the Bay of Naples in the positions indicated in Table No. 21. 183
TABLE NO. 20
CRAFT AND COMPETITORS CRAFT
COMPETITORS
NATIONS
-
In the 5 classes: Australia Bahamas Canada France Germany Great Britain Italy Portugal Spain Sweden Switzerland U. S. A. U. S. S. R.
-
In the 4 classes: Argentine Austria Bermuda Denmark Finland Greece Norway
21. 22. 23. 24. 25.
-
In the 3 classes: Brazil Holland Hungary Ireland Japan
26. 27. 28. 29. 30. 31. 32. 33. 34.
-
In the 2 classes: Belgium Burma Indonesia Kenya Lebanon Malta New Zealand South Africa Yugoslavia
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.
14. 15. 16. 17. 18. 19. 20.
184
5,5
Dragon
Star
F. D.
Finn
Crew
× × × × × × × × × × × × ×
× × × × × × × × × × × × ×
× × × × × × × × × × × × ×
× × × × × × × × × × × × ×
× × × × × × × × × × × × ×
11 11 11 11 11 11 11 11 11 11 11 11 11
3 3 1 3 3 3 3 3 1 3 3 3 3
14 14 12 14 14 14 14 14 12 14 14 14 14
× × × × ×
×
× ×
× × × × × × ×
9 8 9 9 9 8 9
2 2 2 3 1 3 3
11 10 11 12 10 11 12
× × × ×
× × × × ×
5 6 5 6 6
× × × × ×
× ×
3 3 5 3 3 3 3 3 3
×
× × × × ×
× ×
× × × × ×
× × × × ×
×
×
× × × ×
× × × × × ×
Reserves
Total
2 2
5 9 5 8 8
2 1 1 1 1 1 1
3 3 7 4 4 4 4 4 4
3
COMPETITOBS
CRAFT
NATIONS 5,5
35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46.
-
In 1 class: Antilles (W. I.) Cuba Mexico Monaco Morocco Philippines Rhodesia Singapore Thailand Turkey Uruguay Venezuela TOTALS
Dragon
Star
F. D.
Finn
× × × × × × × × × × × × 19
27
26
31
35
Crew
Reserves
Total
2 2 2 3 1 3 2 3 2 1 3 2
2 1 1 1
1 1
2 2 3 3 3 4 3 4 2 1 4 3
287
74
361
1
138
TABLE NO. 21
LEGENDA
Course buoys Course buoys with luminous lamps Ships delimiting the area reserved for competitors and official craft
Sub-divisions per course were as follows: Red Course 5.5 19 boats Dragons 27 boats Yellow Course Stars 26 boats Flying Dutchmen 31 boats Blue Course Finns 35 boats Personnel, craft and material which the Italian Yachting Union and the Italian Navy used in the operation « Sole Mio » are shown in Table No. 22. TABLE NO. 22
CRAFT AND VARIOUS
International Jury Yacht Yacht for " Team Managers „ Yacht for invited personalities Ships for the public Launches for the Press Motor boats for R.A.I.-TV and Cinema Motor boats for Organising Committee Minesweepers, M.S.O. type Minesweepers, M.S.C. type Minesweepers, M.S.I. type Motor launches Boats for divers Motor boats Tankers Hydrograph ships Workshop ships Tugs Crane pontoons Fiat 1100 cars Fiat 1400 cars Fiat 2100 cars 20-seater busses 30-seater busses 42-seater pullmans Motor ambulances Fiat Landrovers Fiat Lorries Helicopters
UNITS
1 1 6 4 4 2 3 3 6 3 43 2 1 2 1 1 3 4 5 1 1 2 2 1 2 1 1 2
PERSONNEL
NUMBER
International Jury
12
Organising Committee
70
Rome Org. Committee - Naples Office Interpreters Gauging committees
5 17 24
Regatta committees International Gauging Committee
21
Medical Centre
10
Olimpia exchange
22
Olimpia Yachting detachment Press & TV Office staff Press & TV Office interpreters
3
287 7 6
Minesweepers, M.S.O. type
195
Minesweepers, M.S.C. type Minesweepers, M.S.I. type
174 51
The entire organisation, beginning with the study of the general plan in September 1957, was progressively developed and, on 10th August 1960, finally assumed its definite form. 186
Mergellina Port.
The basic structure of the Operation « Sole Mio » was articulated on:—(1) the Head of the Organisation, President of the Italian Yachting Union; (2) the Organising Committee of the Games of the XVII Olympiad; (3) the Officer Commanding the Naples and Lower Tyrrhenian Naval Department; (4) the Naples Naval Command; and (5) the General Secretariat of the Italian Yachting Union. The principal divisions of the organisational plan were:—organisation at sea; organisation on land; press office; protocol, reception and ceremonial. Each of these divisions consisted of offices, Committees and Sub-committees. The sea organisation was entrusted to Captain Giulio Figarolo di Gropello, who had at his disposal Naval and Civilian units. According to the established plan, the Naval units had the following tasks—the activation of the three Regatta Courses; the preparation of craft to be used by the Regatta Committees; the delimitation of the regatta courses 187
and the policing of the waters; towing of competitors and assistance at sea, preparation for mooring of the eight " official " yachts. The three regatta courses were activated in the seven days, as foreseen. The Regatta Committees, presided over by engineer Luigi Mino Poggi (for the Red Course), by Captain Egisto Picchi (for the Yellow Course) and by Captain Marino Tarabocchia (for the Blue Course), composed of 6 civilian yachtsmen and by one Senior Naval Officer, duly carried out all the operations provided for in arrangements made by the Presidency of the Italian Yachting Union, without encountering any difficulty. The assignment of Motor launches to each Course proved sufficient and the use of same amply fulfilled requirements. All the tasks assigned to the Minesweepers, small craft and official yachts were carried out without having to have recourse to the use of reserve craft. Members of the Regatta Committees were: Captain Mario De Petris for the Red Course, Cdr. Roberto De Martinis for the Yellow Course and Cdr. Orazio De Fidio for the Blue Course. The presence of the above-mentioned Officers in the Regatta Committees greatly facilitated relations between the Members of the Regatta Committee (civilians) and the Naval Units Command. The operations undertaken by the units destined for the Regatta Committees were without exception carried out with promptness and ability, demonstrating the high level of training reached by the crews. The measures taken to achieve a correct manoeuvring of the units, even in bad weather, proved efficacious and resulted in the realisation of good starting and finishing lines, in accordance with requests periodically advanced by the Regatta Committees. The 53rd Squadron of the 3rd Mine-sweeping Group was responsible for the preparation of the three units chosen as bases for the Regatta Committees. These Mine-sweepers, MSC type, were:—" Giaggiolo " for the Red Course, " Timo " for the Yellow Course and " Gaggia " for the Blue Course. These units effected 57 trips at sea for a total of 335 hours in movement during which they covered 1,559 miles. For the task of delimitation of the regatta area and the policing of the waters, use was made of the following naval craft:— 3 MSO type Minesweepers:—" Salmone ", " Storione ", " Squalo "; 3 MSC type Minesweepers:—" Quercia ", " Ciliegio ", " Castagno "; 3 MSI type Minesweepers:—" Porpora ", " P i n n a " , " Riccio "; 2 launches of the Customs Police; 3 fast motor-boats of the Military Police. Operative control of the area lay in the hands of Cdr. Giovanni Ciccolo, Commander of the 6th Minesweeping Flotilla, on board the minesweeper " Salmone ". The perimeter of the prohibited area was divided off into eight sections, a minesweeper being assigned to each section with the task of preventing non188
The Port of Molosiglio for the 5.5 and Star classes.
The Port of S. Lucia where Dragons were moored.
189
authorised craft from entering the area. The decided intervention of these watch units, on the first day of the Regattas, against persons attempting to transgress the order that no one was to be allowed into the Regatta area, considerably facilitated the task of the Police on the days which followed. The towing of competitors both to and from the Regatta areas was carried out by 4 Minesweepers and 29 Motor Launches. These assistance craft were assigned as follows: - Molosiglio harbour (5.5 and Stars):—MSI Minesweeper " Pinna ", 5 Red Course motor-launches for 5.5, 7 Yellow Course motor launches for Stars; - Santa Lucia harbour (Dragons):—MSC Minesweepers " Quercia " and " Ciliegio ", 4 Red Course motor-launches for Dragons; - Posillipo harbour (Flying Dutchmen and Finns):—MSC Minesweeper " Castagno ", 7 Yellow Course motor-launches for F.D., 6 Blue Course motorlaunches for escort to Finns. All operations of towing were carried out promptly without incident or complaint of any sort. The motor launches, guided by the larger units, the Minesweeper, displayed considerable skill in the towing of the craft even in bad weather conditions, such as those of the sixth day (sea force four, wind force five & pouring rain). Likewise the operations of assistance at sea, fortunately very few in number, were carried out with extreme promptness. The only accident to occur, which resulted in the loss of the Lebanese Flying Dutchman, cannot be imputed to the method employed by the rescue crew after the boat had overturned, but to the incompetence of the Lebanese F.D. crew who attached the tow cable around a belaying cleat fixed to the deck. Moored during the entire period of the Olympic events in the Santa Lucia harbour, the eight " official " Yachts had the task of welcoming (during the period of events) the eminent personalities of International Yachting, and giving them the opportunity of following the Regatta close at hand. For each of these a special numbered mooring was prepared, thus facilitating rapid manoeuvring when putting out to sea or returning to moorings. The eight yachts had to carry out these manoeuvres daily in the short space of a half-hour in all. The 23 civilian units employed during the Olympic Regattas fell under the direct responsibility of the Presidency of the Organising Committee and were subdivided into five groups. The first group consisted of the Yacht " Shyraga ", owned by Enrico Piaggio from Genoa, used during the whole Olympic period as the headquarters of the International Jury and the Yacht " San Giorgio ", owned by Carlo Ciampi of Milan, used for transporting the " Team Managers ". Both these yachts were authorised to sail within all three Regatta Courses. The second group consisted of 6 official yachts to transport important personalities; they were indeed tribunes of honour. Three units were assigned 190
daily, in rotation, to the Red Course, two to the Yellow Course and one to the Blue Course. These units were: " Pazienza " owned by Giacomo Bruzzo of Genoa, " Ea " owned by Guido Giovannelli and Filippo Camelli of Genoa, " Mait II " owned by Italo Monzino of Milan, " Djinn III " owned by Sebastiano Marulli d'Ascoli of Naples, " Santa Lucia " owned by Ernesto Piletti of Milan, and " Prima Stella " owned by Pietro Sada of Rome. In the third group were gathered the motor-boats and motor launches placed at the disposal of the Press, Radio and TV and of film operators. The fourth group was entrusted with the service of transportation of the public, carried out with considerable success by the following units:—steamer " Capri " with a capacity of 500 persons for the Red course, Motor-vessel " Falco " with a capacity of 1,700 persons and Motor-vessel " Anna Maria " with a capacity of 130 persons for the Yellow course and Motor-ship " Jolly " with a capacity of 170 persons for the Blue Course. Finally, the fifth group consisted of the following motor-boats prepared for the service of the Organising Committee:—" Portofino ", " Positano ", " Il Milione " " M.M. 191 " and " Grazia ". All the craft of all five groups, did a fine job without mishap or incident or any kind. The Harbour Master of the Port of Naples carried out, among his various tasks, one of the most difficult jobs of the whole organisation, due to the considerable resistance encountered. The discipline to be followed for mooring in the harbours of Molosiglio, Santa Lucia and Posillipo necessitated special arrangements being made to clear such ports so as to make room for the craft taking part in the Olympic Regattas. The Harbour Master collaborated with the Police Service in the off-shore waters with powers of preventive supervision by making available two motor boats in addition to two fast motor boats of the Police. All these arrangements, made as a result of many previous meetings, were carried out in good time and proved perfectly adequate. All the personnel spared no effort to make their application fully successful.
The Naval Command of Naples. In the preparation and implementation of the Yachting regattas of the Games of the XVII Olympiad, the contribution made by the Naval Command of Naples (COMAR) was very significant. Among its principal responsibilities, mention should be made of:— - the preparation, laying and subsequent removal of 24 buoys marking off the three courses of the regatta and in water of an average depth of 150 metres, of 4 buoys to assure the mooring of the " Vespucci " and " DD.RR. " vessels on the occasion of the Closing Ceremony; 191
- the preparation and removal of 1,000 metres of chain for the mooring of the yachts and other regatta craft in the small ports of Mergellina, Santa Lucia and Molosiglio; - the handling and berthing of 43 motor launches to be used for towing and assistance on the regatta courses; - the systematic control of the buoys marking off the regatta courses with regard to position, floating ability and mooring; - assistance and fuelling supplying of the many national and foreign naval units gathered at Naples for the occasion. For the carrying out of the above-mentioned tasks, civilian personnel of the Harbour Office were used, for a total of some 9,000 working hours, these having at their disposal 3 lighters, 3 tugs and 2 diesel-driven craft. The Naval Dockyard also made its contribution, effecting important works especially as regards carpentry, telephone communication links and photoelectric services. The Naval Commissariat also assured a service of general accomodation assistance by furnishing provisions and clothing to the Olympia Yachting detachment and replenishing supplies of fuel and lubricants for all the units and craft taking part in the Olympic Games. Under the direct supervision of engineer Giovanni Arciprete, the land organisation was undertaken by civilian and military bodies. Among the former were the Presidencies of the Italia, Savoia, Posillipo, Napoli and Nautico Yachting Clubs with their personnel, as well as the officers and personnel of the U.S.V.I. The Navy collaborated through the offices of the Presidency of the Naples Naval Yachting Section with 8 junior officers of the Navy, 4 noncommissioned officers and 16 sailors. The ports chosen by the U.S.V.I. for mooring and shelter of the craft during the Olympic Games period were:—Molosiglio for 5.5 and Star classes; Santa Lucia for the Dragon class; Posillipo for the Flying Dutchman class and Sea Garden for the Finn class. The various Nautical Clubs placed at the disposal of the Organising Committee a large part of their equipment and quarters, for the various services planned. The preparation of the Small Ports involved the Land Organisation in the following arrangements:— - preparation of charts of each Port with indication of the moorings of the various Olympic craft and ocean yachts gathered at Naples for the Olympic Games; such charts also indicated the various services premises used in connection with the Olympic function of the port; - laying of mooring buoys for competing craft (19 for the 5.5 and 62 for the Star classes at the small port of Molosiglio; 27 for the Dragons at the small port of Santa Lucia); 192
- laying and preparation of slip-ways for the laying-up of the F.D. and Finn classes in the small ports of Posillipo and Sea Garden; - co-ordination and organisation of work falling under the responsibility of the various local organisations (Commune of Naples, Harbour Master's Office, Local office of Maritime Works, the Ministry of Public Works, and of the Technical Section of the Organising Committee). - technical and logistical assistance to competitors and regatta craft during the entire period of their stay in Naples, including arrangements to welcome them on arrival, to set up a service of continuous supervision in the Olympic Ports, the launching and laying-up of all boats, by means of military and civilian personnel, to assist competitors in the preparatory phase of the Regattas, and, on their return, to keep the " Olympia " centre constantly informed of all movements of Olympic craft by means of special charts, with coloured indications showing at any given moment the position of craft on sea and land, and lastly, arranging for the dispatch of all vessels to their own countries at the conclusion of the Regattas. - participation in manifestations connected with the Olympic Games, such as the arrival of the Olympic Torch at Naples and its transfer to Fort Ovo, as well as the ceremony of protocol of prize-giving and the transfer of the Torch to Molosiglio.
Gauging operations. The International Gauging Committee, technical body of the International Jury, was composed of 3 Members, under the Presidency of the Italian engineer Artù Chiggiato and with, in addition, a French member, Jean Jacques Herbulot, and an English member, James MacGruer. They carried out the gauging checks with the help of 5 gauging Groups, composed of 24 gauging experts, distributed as follows:— - 5.5 Class 5 gauging experts - Dragon Class 5 „ „ 4 - Star Class „ „ 6 - Flying Dutchman Class „ „ „ 2 - Finn Class „ The gauging for the 1st check took place from 20th to 25th August, and for the 2nd (checking of modifications) on 26th and 27th August. The Technical Committee of the U.S.V.I. arranged to make available the material listed below, necessary for gauging operations:— — an iron pool for the gauging of craft; - two " Dennison " scales of 3,000 kilogrammes for weighing the 5.5 and Dragon classes; 193 13.
- automatic scales of 300 Kg. for the Flying Dutchmen class; - six large board floors for the checking of the sails; - complete apparatus for the gauging of the Flying Dutchmen, including a special section for masts and others for checking the ferrule, keel line etc; - various types of steelyards and scales for the weighing of masts, anchors, drifts; - individual equipment for all the gauging experts:—metal tapemeasures 20 metres long with metric system and English measures, plummets, double tape-measures, plumb-lines, calibres; - blocks of moulded or drilled lead, of regulation weight, for the addition of ballast in the ease of underweight; - models for all phases of checking operations. In all 103 yachts, besides the 55 Finns constructed in Italy and previously checked, were gauged. 895 sails were checked, distributed as follows:—251 for the 5.5 class; 283 for the Dragon Class; 163 for the Star Class and 198 for the Flying Dutchman class. A total of 169 infractions of gauging regulations were verified, of which 63 in respect of sails and 106 in respect of hulls and equipment. Of the 63 sails found not corresponding to regulations, four were in the 5.5 class; fifty-four in the Dragon Class (thirty-six of which were corrected and re-admitted); one in the Star Class and four in the F.D. class. Twenty-six hulls had their weight corrected by means of the addition of ballast, these being fifteen Dragons, six 5.5 and five F.D. Compared to the number of sails admitted the following was the average number of sails presented:— 14 out of 18 sails admitted 5.5 Class 15 out of 18 sails admitted Dragon Class 6 out of 12 sails admitted Star Class 6 out of 12 sails admitted Flying Dutchman Class
194
THE JOURNEY OF THE OLYMPIC TORCH
Iworking n the latter half of 1956, at a time when the officials of the C.O.N.I. were out details of the problems to be solved in the four years preceding the Olympic Games, the Olympic Torch Section was also set up. This first stage set the Section in motion for working out specific duties which were:— the organisation of the Olympic Torch relay from Olympia to Rome via Syracuse-Taranto-Naples and Castelgandolfo; the supplying of torches; the constitution of local Committees; the organisation of ceremonies in the various localities passed through; the recruiting of torch-bearers and the kindling, maintenance and extinguishing of the flame during the Games. Once the operative framework had been established the Section fixed the form the organisation was to take initially by setting up a Committee to which a number of collaborators who had already been engaged in the transport of the Olympic Flame from Rome to Cortina D'Ampezzo in occasion of the Winter Games of 1956 were invited. Thereafter, with the aim of obtaining the interest and support of various organisations whose co-operation was considered necessary for the work of the Section, a central Committee was formed to which the following were invited:— Mr. Amedeo Maiuri, Superintendent of Antiquities in Campania; Mr. Carlo Chiriachi, representative of the Ministry of the Interior and Mr. Leonilda Turrini from the Ministry of Defence. Mr. Aldo Mairano, President of the International Panathlon Club was Chairman, whilst the Secretary was Mr. Alfredo Maria Langellotti. (Table No. 1). On the basis of certain principles drawn up in the organisational field, the Section elaborated a plan of work which in the years 1957-58 led to the selection of the course, the compilation of running schedules and the selection of the type of torch, fuel and the various tripods to be used. The plan of work for the two-year period 1959-60 included a reconnaissance of the course, the working out and designing of placards at the various hand-over points, the setting up of various executive provincial Committees and Communal Committees, the cooperation of sports Clubs and the Armed Forces for the recruiting of the necessary athletes to compose the relay. 197
TABLE NO. 1
CENTRAL CONSULTANT COMMITTEE
OLYMPIC TORCH SECTION Head of Section Alfredo Langellotti
MINISTRY OF MARINE (sea voyage)
15 14 13 12 11 10 9 8 7
6 5 4 3 2
Consequently, during the first months of its activity, the Section paid particular attention to the timing of the running schedules and the compilation of programmes. It established contacts with the Communes, Prefectures, and the Ministry of the Interior for the definition of the various Ceremonies to take place in the different centres along the course. 198
ROME
LATINA
CASERTA
NAPLES
SALERNO
AVELLINO
POTENZA
MATERA
TARANTO
COSENZA
MESSINA
CATANIA
PREFECT OF THE PROVINCE C.O.N.I. PROVINCIAL DELEGATE THE MAYOR TOURIST BOARD REP. CHAMBER OF COMMERCE REP. POLICE REP. MILITARY POLICE REP.
SYRACUSE
PROVINCIAL EXECUTIVE COMMITTEE President Secretary Members
CATANZARO
1
REGGIO CALABRIA
C.O.N.I. PROVINCIAL DELEGATES
The choice of the course. Of the first problems which the Section had to face, the most important was the selection of the itinerary for the journey of the Flame from Olympia to Rome. In view of the time factor and the length of the course involved, it was decided not to adopt the principle of an exclusively overland course which would have led from the Balkan peninsula to Trieste and thence across Italian territory to Rome. It therefore became necessary to adopt an itinerary which would include the crossing of the Ionian Sea to a port on the peninsula but the project of disembarkation at Brindisi, whence the course would have followed State Road No. 7 to Naples and Rome, although appearing more logical, was abandoned in favour of a route considered to be more in line with the spirit of the Games. In fact, it was also decided to give the itinerary and the observances for the carrying of the Torch that particular classic touch which undoubtedly distinguished the 1960 Games. It was therefore decided to select an itinerary which coincided with and bore reference to the two apexes of classical civilisation, Athens and Rome, and which would pass through the sites of Magna Grecia. The first part of the journey took place completely in Greek territory, namely:—Olympia, Pyrgos, Patras, Corinth, Megara, Eleusis and Athens. From the Panathinoikon Stadium in the Greek capital, the Flame was conveyed to the port of Turkolimano at Phaleros and thence, by sea, was brought to Italy, at Syracuse, a city founded in 734 B.C. which, like Naxos, may be considered the first Greek colony in Sicily. Following the Sicilian and Calabrian Ionic coast and over to the Tyrhennian coast of the Campania and Lazio regions, the route passed through many of the more famous Greek settlements of Sicily and Magna Grecia:—after Syracuse, Lentini (the ancient city of Leontinoi founded in 829 B.C.), Naxos, Messina, the straits between Scilla and Cariddus, Reggio Calabria, the river Halex (which according to legend sheltered Hercules), Locri (which in 660 B.C. gave Greece and its peoples a complete first Code of written Laws), Crotone, Sibari, Siri, Metaponto and Taranto, the major centre of Magna Grecia. From here, through Matera and Potenza, the Olympic Flame made for ancient Poseidonia on the Tyrhennian sea, Pompei, Herculaneum, Naples and the roads via the Acropolis of Cuma and running beside Lake Averno to Minturno, Terracina and Castelgandolfo. Thus, after so many centuries, the participation of ancient cities in the Olympic Games was ideally renewed, many of which cities had, by their athletes, attained famous victories extolled by poets of ancient times. The last part of the course was chosen amongst historic sites still vibrant with activity today:—the Appian Way, the Forums, the Capitol, and from the Capitol Hill to the Olympic Stadium. 199
The rite of kindling the fire of Olympia in the Temple of Jupiter.
The athlete Epitropoulos takes over the Olympic Torch.
In a meeting held on 27th May 1958, the Olympic Torch Committee examined a detailed report on the itinerary, the concepts governing its choice and the reasons for selecting Syracuse as the port of disembarkation. This same meeting saw the emergence of a plan for crossing the Straits of Messina and a decision on the prototype of the Torch which was to be different to that used in the London Olympic Games of 1948. Prof. Maiuri was encharged with providing illustrative data on the types of ancient torches so that a final selection could be made. In July 1958, provincial meetings were first held, at which delegates from the C.O.N.I. were present, with a view to illustrating the operations involved in the Relay and the arrangements to be made in the territories of each province. The meetings also dealt with the projected composition of the relay. It was decided to establish contact with the public Authorities for organising the ceremonies which were to take place upon entry into each Province, and the construction of podiums at each hand-over point and the preparation and construction of indicator placards were considered. The programme of training of the young runners selected to make up the relay was also examined.
Reconnaissance of the Course. On 20th September 1958, a meeting of the Committee was held in Naples during which a report was made on an initial reconnaissance held over the whole course, with particular reference to the crossing of the Straits of Messina. The installation of the tripod at Taranto and other rest points was also examined. It was decided to inform the Ministry of the Interior of the arrangements being undertaken and to establish contact with local Administrations. The Committee also decided that, when considering arrangements to be made for events on the programme in urban centres and along the course in the provinces special attention should be paid to the floodlighting of points of attraction particularly along the Amalfi coast road where bonfires were to be lit on the heights above Sorrento and Villa Ioni on Cape Tiberius at Capri. During the first three months of 1959, the whole course and the times for each relay were finalised. However, the itinerary was subject to variations before the moment for the relay actually arrived. A more practical solution was found for the Eboli-Paestum stretch; the reiterated requests by the Nocera area Municipalities for the Torch to pass through their territories were granted and the desire expressed by Caserta Province for the Torch to pass its territory was also met. Meanwhile, all operations to take place in Greek territory were finalised and the traditional formalities for the kindling of the Flame by means of a burning glass in the Stadium of Olympia at 11.00 hrs. on 12th August 1960 were established. 201
After a number of contacts established during the first six months of 1959, the Italian Navy very generously offered to concede the Training Ship " Amerigo Vespucci " for the transportation of the Flame from the Greek port of Turkolimano at Phaleros. At a meeting in April 1959 and others that followed, the Committee established that the sea voyage from Phaleros to Syracuse should not exceed five days, this being due to the fact that the Flame should not reach Syracuse before the night of 18th August while, on the other hand, it could not leave Athens later than the 13th as the Greek Royal Prince and Greek Government Officials had already made arrangements to leave for the Sanctuary of the Island of Tynos on the morning of the 14th. It was therefore absolutely necessary to accept these limiting factors and to arrange for the " Vespucci " to effect a slow voyage circumnavigating the Peloponnese. The Section set up a executive Committee under the Chairmanship of the Prefect in each Province through which the Relay was due to pass. These Committees were encharged with the promotion and assistance with local initiatives and celebrations. In order to obtain the necessary number of athletes, the Section organised a call-up of Torch-Bearers in 1959. Special tests for selection were organised. A Greek athlete on his way towards a hand-over in the Olympic Relay.
202
H.R.H. Prince Constantine receives the Olympic Torch from the Greek torch-bearer.
The honour of lighting the tripod on the " Amerigo Vespucci " goes to a cadet of the Italian Navy.
The athletes selected were used over fractions of 1,500 metres each within the territory of their respective provinces. The time established for each fraction was 5 minutes 15 seconds. Young men, 18 to 23 years of age, of all social classes participated in the selection. To ensure the success of the Torch-Bearer call-up, the co-operation of the Ministry of the Interior, Public Instruction, Defence and the Provincial Committees of the C.O.N.I. was enlisted. Towards the end of 1959, the Section arrived at a number of decisions which included:—the uniform for the athletes selected to run in the Torch relay (white woollen singlet with the badge of the Games and shorts donated by Snia Viscosa Company and gym shoes); the printing of 3,000 placards indicating the hand-over points of the relay; the adoption of the torch model designed by Prof. Maiuri and his collaborators from the National Archeological Museum of Naples.
The new model of the torch. The new model, decidedly classical in line with slim and slightly conical fluting, was built by the firm of Curtisa of Bologna. The torches, placed in appropriate cylindrical boxes, were despatched in rectangular cases containing 6 to 12 models. In December 1959, the Section and the Olympic Torch Committee faced the problem of the emphasis to be placed on all artistic and historical items existing in each area passed by the relay. In January 1960, approval was given to the publication of a treatise which not only summarised and illustrated the technical operations throughout the various sections of the course but also described the intimate significance of the XVII Olympiad. In this respect, direct contact was also established with the Italian Touring Club for the production of a work to be entitled " The Olympic Flame from Greece to Rome ". During this same period, a solution to the problem of transporting the athletes to the various hand-over points of the relay was arrived at and it was decided that the Chairman of the Committee should visit Greece to finalise the arrangements for the Ceremony of handing over the Flame. On 25th February 1960, the Organising Committee for the Games issued a series of organisational amendments to the Provincial Delegates of the C.O.N.I. to facilitate the smooth running of the work already established. Amongst other things, a ruling was given on the lay-out of the course, the positioning of placards, the supply of transport for the athletes and the operations for the embarkation and sea voyage of the Torch. Specific indications were given regarding the supply of the ten tripods for Syracuse, Messina, Reggio Calabria, Crotone, Taranto, Potenza, Paestum, Naples, S. Maria Capua Vetere, Castelgandolfo and Rome. Further instructions were issued for the setting up of posters containing various information including details of the exact times of the relay passing the various points. 204
The itineraries. In April 1960, a detailed reconnaissance of the course was made and on May 5th a meeting was held in Salerno of all Provincial Delegates of the C.O.N.I. for distributing and explaining the itineraries. Matters concerning the nomination of the the athletes for each fraction, lodging requirements and the transportation of material and personnel were also examined at this meeting. During the month of May tests were made on the radio links with the co-operation of TV technicians who were to effect live television transmissions along the whole of the course of the relay. In July, a team of collaborators from the Section started to mark off the various fractions of the itinerary with paint lines. Later, a small detachment from the Armed Forces undertook to place the various indicator placards which consisted of plastic boards measuring 40 × 60 cms bearing the emblem of the Games and the number distinguishing the fraction. In the meanwhile, the C.O.N.I. Delegates and representatives from the Prefectures of the main provincial centres established the arrangements for the ceremonies regarding the handing over of the Torch. This entailed the setting up of appropriate stands for the Authorities whilst final arrangements were made with officials with a view to ensuring public order so that events should not be disturbed because of over-enthusiasm on the part of the public. Careful arrangements were made with Delegates of the C.O.N.I. for the setting up of local Committees encharged with studying the holding of festivities, positioning the posters, checking the marks indicating hand-over points and attending to the decoration of houses. The help rendered by the Olympic Military Detachment to this sector of the organisation was of very great value and particularly so during the transfer of the Olympic Flame from the small harbour of Zeas to Rome. Equally precious was the help afforded in the preparation of the course and the training of 300 military torch-bearers to act as reserves but also capable of covering the 1,500 metre fraction in the required time of 5'15". The Detachment was also responsible for handling transport arrangements as well as fixed and mobile communication links covering the relay. On the basis of a plan elaborated by the Detachment in agreement with the Organising Committee for the Games, the Chiefs of Staff of the Defence Ministry decided to empower the Army, in April 1960, to deal with the manpower, materials and transport requirements. In particular, within the framework of the organisation of the course to be followed by the Olympic Torch, the Detachment attended to the distribution and setting up of the indicator placards for each of the fractions making up the course as well as the disposal of such material once it was no longer required. 205
The O.M.D. decided to entrust the Territorial Military Commands concerned with the task of organisation within their respective territories and, in this respect, such duties were outlined to them in accordance with the plan elaborated by the Organising Committee and the O.M.D. The representatives from Territorial Commands were requested to effect reconnaissance, supply the transport required and maintain contact with the Provincial Committees of the C.O.N.I. to co-ordinate details of the operation. At the end of June 1960, meetings were held at the Headquarters of the Olympic Military Detachment in the course of which all requirements were examined and solutions found to the minor problems in connection with the organisation of the itinerary with particular reference to the timing as laid down in the work plan. Transport was not overlooked and arrangements were made to supply sufficient vehicles to transport the torch-bearers from the various assembly centres to the hand-over points of each fraction and to collect those who had completed their distance. For this work, three motorcycles and drivers and twelve drivers for the twelve Fiat cars placed at the disposal of the Organising Committee were laid on. Transport operations and collection of the torch-bearers along the course was undertaken by the Territorial Military Commands within the territory over which they had jurisdiction in addition to the valuable contribution of personnel and transport made by the Navy, the Air Force, Public Security Police, the Carabinieri, the Finance Police and the Traffic Police. A total of 148 vehicles were used as follows:—56 vehicles from the Military Region Command of Sicily; 76 from the Southern Military Command and 16 from the Central Military Command. In order to ensure mobile communication links following the relay, the Olympic Military Detachment used 4 radio vans which necessitated the use of 2 officers, 7 warrant officers and 10 transmitting personnel who worked for a total of 5,016 working hours. (Table No. 2).
From Olympia to Rome. At 9.30 on the morning of 12th August 1960 the historic ceremony of the kindling of the sacred Flame took place at Olympia. Operations commenced at 9.30 in the Temple of Jupiter. A Greek woman wearing the clothes of an ancient Priestess held a parabolic reflector over the torch and in a few seconds the torch flared. Before proceeding with the kindling of the flame, the Priestess had said a prayer to Jupiter " that the rays of Phoebus should kindle the sacred torch, whose flame, carried across land and sea to the Stadium of Rome, would enlighten the noble competition of the peaceful Games for all peoples of the earth ". The Priestess and the vestals wore ash-grey tunics similar to those in use at the time of the priestesses of the Goddess Hera. 206
TABLE NO. 2
COMPOSITION AND CO-ORDINATION OF T H E OLYMPIC RELAY
o
LONG DISTANCE RADIO VAN (40-50 Kms. ahead)
o
SHORT DISTANCE RADIO VAN (5 Kms. ahead)
o o
SHORT DISTANCE RADIO VAN (5 Kms. ahead) BUS TRANSPORTING AND
o
POLICE RADIO VAN
DEPOSITING ATHLETES
(1.5-3
Kms.
ahead)
o o 2 TRAFFIC POLICE MOTORCYCLISTS 1 MOTORCYCLIST WITH RT LINK ON SIDE OF TORCH BEARER o ¡ o
o 2 TRAFFIC POLICE MOTORCYCLISTS o
RELAY DIRECTORATE (Fiat 2100 Station Wagon)
o o
PRESIDENT OF COMMITTEE (Fiat 2100 Special)
o o
SERVICES (Fiat 2100 Station Wagon)
o o o o o
LIAISON VEHICLE (Fiat 1400)
SERVICES (Fiat 2100 Station Wagon) RADIO-TELEPHONE OPERATOR AMBULANCE VEHICLE
FOR
PREFECT
OF PROVINCE
BEING PASSED
THROUGH
VEHICLE OF TERRITORIAL MILITARY COMMAND VEHICLE OF TERRITORIAL MILITARY COMMAND
o o o
R.A.I.-TV. (Fiat 1100)
o
OLYMPIC FILM
o
RADIO-TELEPHONE SERVICES
PROVINCIAL C.O.N.I. OFFICIALS PROVINCIAL C.O.N.I. OFFICIALS
TRAFFIC POLICE RADIO VAN o o o o o 4 TRAFFIC POLICE MOTORCYCLISTS
o
BUS COLLECTING ATHLETES
o
TRAFFIC POLICE RADIO VAN
o
MOTORCYCLISTS WITH RADIO-TELEPHONE LINK
207
The crowd applauds the passage of the Relay.
On board the " Vespucci ". As soon as the torch was lit, it was placed in a classical Greek vase and carried in procession to the ancient Temple of Hera. Meanwhile, the vestals performed classical dances whilst the Priestess kindled another torch with the flame in the vase and handed it over to the first runner, Penaghoitis Epitropoulos, an athlete who was later to compete in the Decathlon of the Rome Games. The Greek athlete received the torch kneeling and immediately started to run in the direction of Athens. The course of 330 kms was undertaken by a relay organised by the Greek Olympic Committee and passed through Pyrgos, Patras, Corinth, Megara and Eleusis. 208
The course of the Olympic Torch.
At 21.00 hrs on the 13th August, the Flame was handed over by H.R.H. Prince Constantine of Greece in the course of a picturesque ceremony to Mr. Piero Oneglio, Vice-President of the C.O.N.I. and representative of the Organising Committee. He, in turn, handed it over to Mr. Aldo Mairano, President of the Olympic Torch Committee who then passed the symbolic Flame to a cadet of the Italian Navy who boarded a Greek whale-boat and crossed over to the harbour of Zeas near Piraeus and brought it aboard the training-ship " Amerigo Vespucci ". At 20.30 hrs on 18th August, the Flame was disembarked at Syracuse and received by the President of the Sicilian Region not far from Fonte Aretusa. From Syracuse, the Relay followed the same course as that followed by the ancient Greeks during the period when they founded their colonies and through those parts whose former prosperity earned them the name of Magna Grecia. The itinerary covered 1,532.800 kms in all. The course was divided up into 1,199 fractions, most of them 1,500 metres long, to be covered in a time of 5 mins. 30 secs. Exception was made in the case of uphill stretches where the distance was cut down to 1,000 metres to be run in the same time. (Table No. 3). The torch-bearers were recruited from amongst the members of sports clubs and schools in the fifteen provinces the Relay passed through. The selection was made after strict training on tracks and roads, particular attention being paid to the selection of those who were to run through towns. All the fractions were covered in the established time. The handing over of the Flame was effected by applying torch to torch, to the accompaniment of great popular enthusiasm which this race aroused. In places where special ceremonies were to be held, namely, Syracuse, Messina (where the Straits were crossed aboard characteristic Messina craft and accompanied by practically the whole of the shipping from that city), Reggio Calabria, Metaponto and Castelgandolfo, use was made of tripods burning fuel lit by the Olympic Torch. Other tripods were used at those points where the Torch remained overnight, i.e. Crotone, Taranto, Potenza, Paestum, S. Maria Capua Vetere, these being closely guarded by young athletes and surrounded by crowds of local townspeople increasing in numbers as day dawned. All the centres along the course witnessed scenes of great enthusiasm on the part of the population as a result of the initiatives taken by the Authorities and sports officials. Colourful spectacular scenes of festivity were the rule at the passage of the Torch. Everywhere flowers, fireworks, the ringing of church bells and thousands of young people wearing the traditional five coloured rings greeted the Flame. Large panels illustrating the various sports, special lighting and a panoply of flags provided exceptional spectacle value doing full justice to the spiritual significance of this event. The organisation for the Province of Rome was encharged to Lt. Col. Francesco Andreotti of the Metropolitan Police Corps. 209 14.
TABLE NO. 3
PROVINCE CROSSED
56.900
56.900
43
43
COURSE
PROGRESSIVE
IN KMS
DISTANCE
DAY & MONTH
From
Syracuse
PROGRESSIVE FRACTIONS
TIME-TABLE FROM BORDER TO BORDER
FRACTIONS PER PROVINCE
ITINERARY SCHEDULE OF THE OLYMPIC TORCH
18th Aug
To
21 00' 00"
19th Aug
0 51' 00"
Catania
19th Aug
0 53' 00"
4 48' 15"
60.900
117.800
50
93
Messina
19th Aug
4 50' 15"
8 32' 00"
58.250
176.050
46
139
Messina Straits
19th Aug
8 40' 00"
9 40' 00"
12.400
188.450
1
140
Reggio di Calabria
19th Aug
9 40' 00"
18 20' 00"
138.550
327.000
97
237
Catanzaro
19th Aug
18 22' 00"
263.100
400.100
119
356
20th Aug
9 14' 00"
Cosenza
20th Aug
9 16' 00"
16 48' 30"
119.400
609.500
86
442
Matera
20th Aug
16 50' 30"
19 24' 00"
40.050
649.550
29
471
Taranto
20th Aug
19 26' 00"
105.650
755.200
78
548
Matera
21st Aug
11 17' 30"
96.420
851.620
81
630
Potenza
21st Aug
18 30' 30"
109.780
961.400
93
723
32.300
993.700
32
755
153.000
1,146.700
128
883
119.400
1,266.100
102
985
Avellino
22nd Aug
14 33' 30"
Salerno
22nd Aug
16 57' 30"
16 54' 30" 16 09' 30"
23rd Aug 23rd Aug
18 28' 00" 14 31' 00"
22nd Aug
Naples
16 11' 30"
Crotone: from 1.28 to 5.47
Taranto: from 22.13 to 7.10 Potenza: from 21.05 to 9.05' 30" Paestum: from 21.30 to 9.56
1 07' 30"
24th Aug Caserta
24th Aug
1 09' 30"
9 05' 30"
83.100
1,349.200
67 1,052
Latina
24th Aug
9 07' 30"
17 10' 30"
117.310
1,466.510
87 1,139
Rome (Capitol)
24th Aug
17 12' 30"
21 00' 00"
59.690
1,526.200
48 1,187
Capitol-Olympic Stadium
25th Aug
16 56' 00"
17 34' 00"
6.600
1,532.800
12 1,199
210
NIGHT STOPS
Santa Maria Capua Vetere: from 3.21' 15" to 5.44 In the Capitol from 21 hrs. of August 24th to 16.58 of August 25 th.
The Olympic Torch entered into the territory of the province at the 48.34 kilometre mark along the Via Appia Nuova on 24th August at 17.12 hrs and was taken into custody by the Prefect, who then handed it over to the first torch-bearer of the province. The successive hand-overs in front of the Municipalities of the various Communes took place at the following times:— Velletri, 17.43" hrs; Genzano, 18.32'30" hrs; Ariccia, 18.43'15" hrs; Albano 18.5312 " hrs; Castelgandolfo, 19.03' hrs and Rome (Capitol) at 21.00' hrs. Upon arrival at the Capitol, the last athlete of the Relay greeted the crowd, raising the Torch in their direction, and then proceeded to light the tripod which was kept alight until the next day. Thus the great relay came to an end to the sound of a fanfare by the Followers of Vitorchiano. Here the people of Rome enjoyed one of the most colourful ceremonies. Within the framework of the Michelangelo Palaces on the Capitol where Rome in the person of Tarquinius the Proud raised the Temple of Jupiter Optimus Maximus Capitolinus, the Sacred Flame burned throughout the night, whilst the Olympic Flag fluttered on the Capitol tower. The following day, in the presence of the Mayor of the City and numerous representatives from the Government, the Armed Forces and the Organising Committee, the relay took up its course once more and, crossing Rome via the Corso and the Via Flaminia, reached the Olympic Stadium at 17.30 hrs as the Opening Ceremony was taking place. (Table No. 4). TABLE NO. 4
FROM THE CAPITOL TO THE OLYMPIC STADIUM
FRACTION
DEPARTURE POINT
TIME
METRES
1188
Capitol
16 58' 00"
500
1189
Piazza Venezia
17 01' 00"
500
1190
Piazza Colonna
17 03' 15"
500
1191
Piazza S. Carlo al Corso
17 05' 30"
600
1192
Piazza del Popolo
17 08' 00"
600
1193
Piazzale della Marina
17 10' 30"
850
1194
Piazzale Manila
17 13' 45"
600
1195
Piazza Apollodoro
17 16' 15"
700
1196
Piazza Cardinal Consalvi
17 19' 15"
600
1197
Lungotevere Diaz
17 21' 45"
350
1198
Headquarters of C.O.N.I. Foro Italico
17 23' 15"
380
1199
Underground passage Olympic Stadium
17 29' 50"
420
Olympic Stadium:—Lighting of Tripod
17 34' 00"
211
TORCHBEARERS IN THE RELAY OF THE " OLYMPIC TORCH "
SYRACUSE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Lo Bello Concetto D'Agata Gaetano Valente Vincenzo Puglisi Salvatore Tinè Luciano Occhipinti Nunzio Orlando Giuseppe Laboria Giovanni Russo Benito Farina Giuseppe Fabbiano Vincenzo Mica Luciano Carpanzano Salvatore Scordia Giuseppe Iacono Francesco D'Angelo Damiano Mulè Francesco Montoneri Giuseppe Nicolino Antonino Jannò Roberto Mendola Salvatore Pizzo Salvatore Gianino Domenico Cannarella Salvatore Giunta Giuseppe Betta Giacomo Sillato Giampaolo Fraterrigo Leonardo Marziano Francesco Cannarella Corrado Conti Vincenzo Mastrogiacomo Alfio Strano Alfio Cappello Vincenzo Nardi Raffaele Salibra Luciano Giudice Giovanni Alì Giovanni Accaputo Lucio Marino Pasqualino Contu Dario Trommino Oreste Garajo Gabriele
CATANIA 44 45 46 47 48
212
Tamburella Mario Scriminaci Salvatore Pulvirenti Carmelo Giannaresi Francesco La Jacona Salvatore
Vigile Salvatore Romano Domenico Giardina Vito Spoto Francesco Faro Aldo Cara Romeo Giuseppe La Rosa Ottavio Russo Ignazio Roccaforte Domenico Cangemi Vittorio Lo Giudice Vittorio Sicari Elio Mascali Isidoro Cazzetta Alfio Di Mauro Rosario Barbagallo Francesco Randazzo Carmelo Trombetta Gaetano Corsaro Antonino Signorelli Giuseppe Torre Amedeo Granozzi Gaetano Granozzi Gaetano Serapione Serafino Brunetto Carmelo Vecchio Antonino Nicolosi Rosario 76 Bonaccorsi Antonino 77 Falà Salvatore 78 Contino Diego 79 Scuderi Antonio 80 Longo Francesco 81 Anastasi Gaetano 82 Macca Giuseppe 83 Incardona Bruno 84 Di Grazia Isidoro 85 Trovato Luigi 86 Vasta Giovanni 87 Bonaccorso Leonardo 87- bis Sciacca Alfio 88 Mazzeo Santo 89 Greco Antonino 90 Pernicano Salvatore 91 Iraso Giuseppe 92 Torrisi Santo 93 Badia Lorenzo
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140
MESSINA Di Stefano Carmelo Spanó Rosario 95-bis Rigano Antonino
94 95
TEOCLE Club 2 with cox team Calabrò Domenico Gallodoro Enrico Bisazza Giovanni Trovato Stellario Adorno Arcangelo Rizzo Pasquale Milone Antonino D'Andrea Nicola Vinci Mario Torre Giuseppe Muscolino Antonino Cacopardi Luigi Mantarro Santi Trimarchi Rosario Mondello Giuseppe Quartarone Giuseppe Salvago Sergio Santoro Giulio Zappalà Andrea Arrigo Antonino Ventimiglia Salvatore Minghelli Giovanni Colonna Giuseppe Gemelli Felice Ruggeri Nicola Auditore Carmelo Prestigiovanni Giuseppe Munafò Andrea Restuccia Francesco Stasi Enrico Nostro Giuseppe Gullace Aldo Micari Diego Tiano Giovanni Montalbano Domenico Rizzo Giovanni Donato Salvatore Chille Piero Bombaci Antonino Zodda Andrea Tiano Santi Migneco Mario Bonanno Giovanni Magazzù Vittorio REGGIO DI CALABRIA
141 142 143
Penna Aldo Romeo Antonino Candito Domenico
TORCHBEARERS LIST cont.
144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169
Febbe Filippo D'Ascola Dante Martini Ezio Matalone Angelo Riso Giuseppe Scotto Felice Mauro Carmelo Sorrentino Salvatore Golfo Giovanni Latella Vittorio Cuzzocrea Diego Perazzo Francesco Ferrandello Paolo Degirolamo Giuseppe Pizzinga Emilio Ielo Antonino Febbe Diego Britti Carmelo Romeo Elio Toscano Giuseppe Zampaglione Sergio Minicucci Domenico Lugarà Francesco Geria Annunziato Zumbo Antonino Macrì Carlo
170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195
Avenoso Michele Rato Giuseppe Scuncia Emilio Serranò Antonino Vacalebre Anselmo Gentile Giovanni Verduci Mario Iriti Antonino Battaglia Vincenzo Prestinicola Consolato Barreca Giuseppe Schipani Rodolfo Mordà Domenico Filangeri Aldo Ferrara Demetrio Marino Giovanni Laganà Antonino Errante Vincenzo La Piana Vincenzo Foti Giuseppe Sofia Biagio Mandalari Francesco Mollo Mario Toscano Antonio Gullì Franco Valenti Francesco
196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221
Lacava Carmelo Miceli Francesco Fara Nicola Boracchi Pasquale Ravenda Ferruccio Sartiano Antonio Frascà Luigi Caielli Antonio Caccamo Giuseppe Sergi Nicola Gallipari Rodolfo Monorchio Vincenzo Cotroneo Giuseppe Scimone Aldo Furci Roberto Galluccio Francesco Lombardo Giuseppe Galasso Domenico Caridi Antonino Prochilo Giuseppe Gasparro Giuseppe Pedullà Renato Carbone Carmelo Quattrone Antonio Sposati Vincenzo Favoino Carmelo
The " Vespucci " in navigation towards the Italian coast.
TORCHBEARERS LIST cont.
222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237
Campanella Giuseppe Muscolo Domenico Turiano Natale Tripodi Aldo Labate Francesco Falsone Rosario Torchia Carmelo Incorvaia Filippo Baldassare Giorgio Misitano Francesco Gatto Domenico Noto Gualtiero Berlingeri Antonio Armeni Vincenzo Labate Dante Iachino Francesco
CATANZARO 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271
214
Gallo Luigi Amatruda Leopoldo Galeno Pasquale Andricciola Giovanni Pisani Arturo Colloca Ernesto Villella Gianfranco Careri Antonio Dattilo Domenico De Masi Vincenzo Barbieri Matteo Ciliberto Vittorio Moschella Antonio Mazzitelli Francesco Barbuto Giuseppe Scopacasa Francesco Ciancio Antonio Apicella Fausto Pultrone Giuseppe Caminiti Antonio Palazzo Martino De Vita Elio Altamonte Fortunato Cosentino Francesco Solano Giuseppe Russo Vincenzo Spitale Santo Marcello Giuseppe Giofrè Domenico La Rocca Marcello Rito Giuseppe Primerano Rosario Vignardi Giovanni Piterà Cesare
272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323
Telesa Abramo Catarinella Anna Greco Giovanni Nitti Mario Di Lorenzo Ernesto Massimilla Sergi Francesco Raso Francesco Scicchitano Giuseppe De Maso Luigi Catarinella Giuseppe Severino Giuseppe Rizzo Carmine Cosentino Antonio Masciari Benito Puccio Antonio Plastino Giovanni Leone Giovanni Ranieli Giuseppe Sergi Giuseppe Rosi Antonio De Falco Giovanni Giacobbe Dante Ruga Francesco Grande Giuseppe Mirarchi Antonio Puccio Giancarlo Accurso Domenico Pisacane Pasquale Saraceno Raffaele Intrieri Antonio Potente Domenico Mirabelli Arnaldo Mirabelli Pietro Cosentino Antonio Barbieri Francesco Paparo Enrico Tozzi Vincenzo Cerviani Gaetano Carcea Claudio Scandale Sergio Covelli Antonio Vallone Mario Ammerata Armando Bombardieri Roberto Luzzaro Raffaele Mungari Franco D'Oppido Francesco Sorrentino Cosimo Noce Mario Boiano Alfredo Volterrani Mario
324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356
Schifino Fedele Cimino Tommaso Galena Luciano Guarnieri Silvano Tessitore Antonio Bortone Luigi Scerra Marcello Fazio Fedele Tancredi Annibale Rotondo Giuseppe Lattanza Antonio Tricoli Sergio Paturzo Menotti Pantisano Pasquale Varrese Vito Pollastro Luigi Longo Antonio Proto Giuseppe Torchia Giuseppe Pittelli Franco Blois Salvatore Tancredi Arturo Franco Mario Pasqualetti Carmine Viraldi Giovanni Sisca Antonio Galena Lorenzo Perrone Filippo Greco Daniele Lidonnici Saverio Riolo Mario Argentieri Antonio Bartolotti Umberto
COSENZA 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373
Cufari Giovanni Cariglino Cataldo Graziano Saverio Latanza Antonio D'Agostino Gilberto Abbritti Pietro Abbritti Giuseppe Celeste Olindo Di Pietro Francesco Arcuri Diego Liquori Romano Ippolito Aldo Porco Mario Perrone Giacomo Manna Ettore Zappone Umberto Apa Nicola
Having passed the historical Arch of Constantine, the Olympic Torch makes its waytowards the Sacred Way.
TORCHBEARERS LIST cont.
374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425
216
Costa Vittorio Greco Giovanni Riganelli Osvaldo Fucilla Ruggero Romano Francesco Pescatore Antonio Russo Ugo Scalise Alfonso Donato Martino Le Fosse Quintino Barone Serafino Petrini Antonio De Simone Alfonso Sapia Giovanni Campana Benito Scorza Aldo Pisano Carmine Le Pera Francesco Magliarella Guido Pirana Roberto Florio Luigi Campolo Giuseppe Liquori Gianpaolo Romano Michele Giuffrida Antonio Bevacqua Antonio Benvenuto Piero Benvenuto Alfonso Malomo Francesco Scorza Leonardo Guaragna Giuseppe Cardone Domenico Lauro Domenico Santini Luigino Decollatore Giovanni Perri Salvatore Campana Alberto Cirianni Enrico Andreotti Franco Del Gaiso Lorenzo Franzese Fulvio Lettieri Francesco Montalti Onorato Gerandini Leonardo Vitola Nicola Conte Damiano Dattoli Biagio Aurelio Rosario Minasi Francesco Pulieri Domenico Giacobini Luigi Cappa Enrico
426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442
Lanza Giuseppe Perrone Gennaro Lo Spennato Severino Donadio Fedele Gatto Raffaele Paese Antonio Carofiglio Antonio Ceraudo Franco Parise Giovanni Tito Enzo Toscano Franco Ziviello Vincenzo Spadafora Antonio Atteritano Cesare Toscano Enrico Annesi Antonio Cavalcanti Fabio
443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471
Sinno Primo Becucci Aurelio Giordano Antonio Massari Ettore Lorè Emanuele Serio Rocco Iannino Luigi Stanzione Gennaro Celano Giuseppe Forastiere Antonio Signorini Gino Cicchetti Enzo Virno Domenico Rana Giuseppe Fittipaldi Giuseppe Giugliano Michele De Leonardis Mariano Nicoletti Egidio Tomaselli Franco Parente Antonio Parisi Nino Lovecchio Antonio Lombardi Cosimo Caputi Francesco Narciso Mario Castronuovo Nunzio Bernini Rocco Avallone Vincenzo Lombardo Rosario
MATERA (Jonic Section)
TARANTO 472 473 474
Ceccherelli Victor Ugo Pierri Pietro Castellano Antonio
475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526
Bianchi Cataldo Conte Giovanni Longone Cosimo Caporlingua Giuseppe Del Vecchio Michele Galeone Vincenzo Peretto Antonio Musco Rodolfo Miolla Giuseppe Fago Cosimo Presicci Salvatore Torretta Domenico Lacapria Fortunato Pirami Paolo Pisani Giovanni Palminteri Lucio Tibaldini Antonio Silvestri Angelo Bianchi Giovanni De Florio Amedeo Vinci Giovanni Trono Giovanni Montemurro Fernando Romano Benito Ippolito Pietro Tursi Amedeo Pierri Lucio Castellano Francesco Baldi Nicola Santoro Gaetano Caliandro Walter Leggieri Salvatore Lucarella Antonio Galli Luigi Braini Remigio Ragone Michele Da Correggio Gino Carucci Stefano Tosoni Rinaldo Di Bisceglia Vincenzo Leone Eugenio Palagiano Emanuele Cicorella Salvatore Cavagna Federico Bettini Stefano Atza Antonio Sgammato Gennaro Marenco Carlo Sferra Giuseppe Ragone Pasquale Olivari Antonio Bozzo G. Carlo
TORCHBEARERS LIST cont.
527 Baini Sergio 528 Malfatto Roberto 529 Spreafico Giovanni 530 Motolese Raffaele 531 Valente Tommaso 532 Isi Tommaso 533 Lopinto Matteo 534 Morbidelli Claudio 535 Rana Domenico 536 De Vita Angelo 537 Colella Paolo 538 D'Aprile Paolo 539 Boezio Antonio 540 Caliandro Michele 541 De Gironimo Francesco 542 Kossler Franz 543 Miceli Gaetano 544 Zuccarini Marcello 545 Orfino Pietro 546 Scaglioso Vittorio 547 Abbamonte Nicola 548 Ciaccia Giuliano 549 Leone Pietro
MATERA (Appennine Section) 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575
Giordano Antonio Massari Vincenzo Lisanti Antonio Manicone Giuseppe Mazzi Eugenio Garubba Giuseppe Rana Giuseppe Becucci Aurelio Rochira Agostino De Leonardis Vincenzo Castore Michele Taratufolo Benito Sinno Primo Cicchetti Vincenzo Spada Francesco Strammiello Nicola Morelli Angelo Persia Giuseppe Bruno Antonio Cifarelli Vito Di Ginosa Antonio Di Sogra Antonio Di Pierro Francesco Fittipaldi Rocco Lavecchia Egidio Losignore Nicola
576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627
Massaro Aldo Martire Salvatore Lasalvia Franco D'Addiego Domenico Capodagli Domenico Casella Franco Labriola Antonio Fortunato Filippo Nocera Luigi Fortunato Rolando Zaccagnini Pietro Lamacchia Renato Manicone Belisario Maremonti Salvatore De Simmeo Nicola La Bella D'Anzi G. Battista Troccoli Vincenzo Cammarota Tommaso Vicenti Antonio Miulli Donato Cammarota Pietro Loponte Francesco D'Arienzo Vincenzo Marinaro Tonino Epifania Vincenzo Liuzzi Matteo Bollettieri Francesco Piccolo Antonio Camardella Antonio Allegro Giovanni Lombardo Salvatore Sarra Adolfo Mascolo Antonio Valluzzi Eugenio Piancazzi Pasquale Giglio Michele De Leonardis Raffaele Loperfido Vito Domenico Lorè Eustacchio Stella Nicola Murano Francesco Bruno Pancrazio Nicoletti Imperio Tommaselli Nicola Fittipaldi Giuseppe Venezia Eustacchio Sarra Filippo Donvito Francesco Coniglio Raffaele Stabile Ianora Raffaele Porcari Antonio Giugliano Rosario
628 629 630
Spinelli Mauro Fiore Vittorio Salerno Michele
POTENZA 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677
Riviello Michele Boero Elio Coriglione Maurizio Perciante Andrea Springher Antonio Tramutola Antonio Palese Franco Restaino Domenico Copertino Franco Basentini Rocco Continanza Amedeo Pennacchio Zaccaria Di Croce Vincenzo Gioioso Raffaele Caggiano Vincenzo Ferrone Francesco Ciorciaro Angelo D'Emilio Guglielmo Falciano Vincenzo Mitidieri Egidio Larocca Raffaele Bettinetti Roberto Telesca Paolo Ragone Giuseppe Siciliano Raffaele Rizzitiello Vincenzo Rivela Raffaele Giacomini Raffaele Zappella Decio Santarsiere Antonio Di Marti Vincenzo Barlin Costantino Pannucci Marcello Cippelletti Luigi Infantino Antonio Oppido Ottavio Garciuoli Mario Taddonio Emanuele Misuriello Vincenzo Orologi Edoardo Cerverizzo Salvatore Pepe Luca Atena Livio Cerverizzo Aldo Di Nuzzo Giuliano Matera Mario Santagata Giuseppe
217
TORCHBEARERS LIST cont.
678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723
Carpelli Luciano Cassino Biagio Taddonio Luciano Spirito Felice Vietro Aniello Lomagro Luigi Spreafico Enrico Ferraresi Eros Genovesi Luigi Massaro Domenico Villani Rocco Messina Paolo Emilio Bongiovanni Umberto Rosa Rocco Blasi Silla Napoli Mario Falconieri Carmelo Padulosi Luciano Carlone Luciano Carlone Vincenzo Aliastro Rocco Lovallo Salvatore De Luca Enrico Maggio Aniello Basile Filippo Ponticelli Vincenzo Ristelli Nicola Sforza Franco Pedretti Luigi Loy Felice Cantore Rocco Mancusi Giorgio Loffredo Gabriele Ungaro Rocco Veracchi Pasquale Ricciuti Vincenzo Gallino Venusto Dores Nicola Viggiani Michele Nolè Vincenzo Miccoli Mario Acciale Franco Zaccagnino Angelo Fabrizio Gerardo Cantore Antonio Chirichella Umberto
AVELLINO 724 725 726 727
218
Cicoira Ettore Galgano Giuseppe Cindolo Gennaro Ascione Pasquale
728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755
Galliano Silvio Gentile Nicola Genovese Antonio Liguori Domenico Pericolo Bruno Di Blasio Vincenzo Carbone Fulvio Saggese Enrico Benigni Italo Ruocco Bruno D'Agostino Donato Gengaro Pasquale D'Argenio Carmine Capolupo Francesco Mauro Antonio Vuotto Ezio Festa Vittorio Freda Rocco Chianca Ottone Del Guercio Carlo Delia Pera Claudio Grasso Antonio Perrottelli Vito Del Vecchio Antonio De Girolamo Giuseppe Antoniello Raffaele Sessa Gerardo Guarnaccia Virginio
SALERNO 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777
Benvenuto Felice Siano Ferruccio Cernera Salvatore Martinelli Romeo Lenza Antonio Ricca Orazio Formica Costantino Lardo Antonio Festa Giovanni Lenza Gerardo Franchomme Emilio Califano Francesco Vicinanza Vincenzo Giardella Angelo Bartone Antonio Lardo Vincenzo Anzalone Giuseppe Verdicchio Nicola Gasperro Antonio Pecoraro Virgilio De Sio Giovanni De Amicis Pietro
778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829
Cincione Elio Iannicelli Alberto Garofalo Salvatore Granito Giovanni Basso Francesco Parlato Guido Orsano Donato Moscarelli Vittorio Telese Sante Mottola Francesco Cuomo Alberto Strianese Vincenzo D'Apuleio Gianfranco Viviani Antonio Biasucci Giovanni D'Ascoli Antonio De Luca Aldo Mennillo Gerardo Voso Giuseppe Albano Antonio Tarallo Paolo Carola Francesco Benincasa Mario D'Aniello Federico Lo Cascio Vincenzo Iorio Pietro Nigro Carlo Capo Angelo Lopardo Eugenio Pisciottano Mario Voza Francesco Barattucci Alfredo Amabile Franco Landi Leonardo Di Giacomo Fiore Garbuti Edoardo Serra Salvatore Farina Orazio Volpe Francesco Guerritore Marcantonio Verta Giuseppe Rosamilio Vito Galderisi Mario Bove Pasquale De Stefano Bruno Proietti Domenico D'Aquino Arminio Proietti Giuseppe Vestuti Candido Vistocco Mario Di Luccia Alfonso Garofalo Donato
On August 24th, the Mayor of Rome lights the tripod on the Capitol.
TORCHBEARERS LIST cont.
830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883
220
Sapere Dalmazio Ginosa Alberto De Santis Costantino Grimaldi Antonio Rainis Raffaele Vicinanza Franco Barela Sergio Sica Luigi Filipponio Bruno Di Motta Vittorio Pepe Alfonso Parisi Bruno Rossillo Franco Santoriello Gennaro Benatti Andrea Giordano Giovanni Pisapia Bruno Crucito Bruno Gasperini Gennaro Marano Ugo Giordano Luigi Marino Amerigo Boarto Raffaele De Martino Antonio Sanniota Umberto Oliva Andrea Landi Gennaro Del Pizzo Elio Coscioni Bruno Coscioni Arturo Lembo Matteo Coscioni Luciano Tramontano Italo Pacileo Francesco Di Lieto Angelo Gargano Antonio Delia Monica Alfonso Rizzo Michele Scattaretico Giovanni De Maio Pietro Amendola Pietro Sanna Paolo Cristiano Lello De Vitis Roberto Nobile Ferdinando Forino Augusto Parisi Valerio Cinque Ferdinando Romano Giovanni Guadagno Michele Cassaro Antonio Kössler Franz Soriani Giorgio Parisi Franco
NAPLES 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933
Vignola Giovanni Ercolano Michele Cacace Mattia Zotti Alessandro Nasti Giovanni Catapano Pasquale Liccardo Giovanni Tartaglia Umberto Gargiulo Luigi Scarlini Adriano Calò Antonio Bracale Carlo Irolla Antonio De Gennaro Tommaso Giardulli Sergio Lombardo Virgilio Vigorito Carlo Cavaliere Benito Cesarano Francesco Buonocore Luigi Pappalardo Francesco Giordano Umberto Ammendola Antonio Saggese Enrico Pappa Italo Saporito Learco Cioffi Francesco Colella Pasquale Vosa Renato Savy Francesco Ambrosanio Mario Villa Umberto Lucariello Antonio Fogliamanzillo Felice Picarella Francesco D'Angelo Michele Auciello Livio Lullo Diego Delia Gatta Domenico Borrelli Antonio Scala Mario Negro Alfonso Misto Luigi Lococciolo Francesco Scalici Gaspare Burani Alessandro Erpete Giovanni Coppola Bruno Pasqualotto Ugo Occhiuzzi Norberto
934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985
Ottaiano Pasquale Libero Giovanni Kuhne Italo Formisano Luigi Longhi Ubaldo Grillo Luigi Bertolingrande Claudio Marzano Gaetano Costantino Salvatore Caggiano Alfonso Iovino Salvatore Raiola Bruno Marra Guido Gurgo Roberto Mazzagalli Franco Magliulo Giovanni Fasulo Luigi Magliulo Agostino Cavaliere Gaetano Susini Gian Paolo Artiaco Giuseppe Donati Carlo Cupido Agrippino Gagliardi Giuseppe Guardascione Michele Mastropasqua Gaetano Martino Antonio Illiano Giuseppe Romeo Romualdo Schiano Antonio Cosentino Salvatore Grasso Corrado Iaccarino Vittorio Perna Antonio Palmesino Umberto Flaminio Pasquale Formisano Ciro Petrucci Alfredo Di Mauro Mario Giovannucci Renato Santillo Alberto Tognaccini Rosario Lanni Antonio Scala Giuseppe Pelella Aniello di Tommaso Cervo Umberto Pianese Benedetto Faussone Oreste Fogliano Francesco Bottone Giovanni Ferrara Domenico Medas Giorgio
TORCHBEARERS LIST cont.
CASERTA 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036
Normando Mario Oioli Gian Pietro Gatta Eduardo Mandara Livio Vinci Camillo Gregori Vincenzo Manfredi Giuseppe Marcangeli Mauro Proia Enrico Leonardo Pietro Zechender Paolo Colella Domenico Sparaco Antonio Moriello Vittorio La Spina Franco Massa Bruno Tronco Nicola Gazzillo Vincenzo Vigliotta Ettore Batelli Giuseppe Miccoli Ciro Baldassatici Luciano Mazzi Dino Marini Duilio Maglione Armando Longano Luigi Aveta Raffaele Jodice Giovanni Bodenizza Vittorio Madonna Mario Preti Alberto Moscardi Bruno De Lucia Biagio Mingione Domenico Gramignoli Eugenio Faudella Luigi Cassinelli Luigi Panzeri Francesco Teso Lorenzo Pizza Giovanni Cappannella Olivo Merenda Giuseppe Crosato Angelo Lombardi Innocenzo Stellato Angelo Cerreto Aniello Lazzarini Giovanni Simioni Lucio Merlino Giovanni Bruschi Mario Franceschini Ivo
1037 Baggi Giovanni 1038 Cipriano Andrea 1039 Cipriano Luigi 1040 Vaglianti Achille 1041 Rillo Piero 1042 Decio Biagio 1043 Bonfanti Erino 1044 Tagliaferri Giulio 1045 Quattrini Cesare 1046 Padalino Vittorio 1047 Natalini G. Paolo 1048 Linguonotto Sergio 1049 Saragni Angelo 1050 Rossi Bruno 1051 Scandella Mario 1052 Izzo Pasquale
LATINA 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087
Ionta Salvatore Santorelli Mario Riccardi Silvio Treglia Paolo La Starza Pasquale Chiaromonte Romolo Lutrario Enrico Filosa Giovanni Santoro Raffaele Punzo Luigi Papponetti Elio Mesolella Vittorio Marciano Erasmo Incardona Pietro Ciano Aldo Simeone Manlio Kotler Querino Scinigariello Giuseppe Scicconardi Salvatore Magliozzi Damiano Recchilungo Giovanni Torres Giuseppe Garzia Marco Meconi Aldo Buccimozzo Franco Croatto Nevio Parisi Bortolo Sepe Bruno Soccodato Giancarlo Iudicone Franco Razzino Salvatore Colella Vincenzo Zoina Astolfo Masci Antonio Bianchini Bernardo
1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139
Farignoli Ubezio Di Micco Ettore Fantasia Erasmo Somma Roberto Fusco Romano Mandatori Silvano Del Monte Franco Faragnoli Giuliano Martelli Lanfranco Noro Luca Cassandra Angelo Di Raimo Luigi Di Marchis Cristoforo Matteoli Guglielmo Cearini Cesare Dell'Antonia Giuseppe Piattella Giancarlo Ventorusso Attilio Bagnariolo Orlando Marangoni Francesco Equipaggio Marina Militare Azzolina Antonio Rigoni Plinio Brunello Sereno Palese Giuseppe Ubaldi Francesco Pallotti Francesco Arca Silvestro Albanesi Mario Di Trapano Umberto Ceci Elio D'Amico Bruno Mastracci Nello Panico Aldo Zanchetta Adriano Ceci Giovanni Orelli Paolo Manzutti Valentino Stefani Bruno Cusumano Gino Tropiano Mario Pugliese Addis De Noni Luciano Severini Giancarlo Mangiapelo Paolo Salvini Roberto Castellani Benito Pompili Franco Caccioppola Franco Polinari Agapito Gianpaolo Rolando Imperiale Antonio
221
TORCHBEARERS LIST cont.
ROME 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170
Damiani Otello Segatori Flavio Colonnelli Vittorio Tedesco Damiano Andaloro Alessandro Pugnaloni Sandro Ballati Franco Giuffrida Rosario Garbaglio Andrea Barbieri Renato Aleco Lucio Maria Gaetani Mauro Cenciarelli Rodolfo Di Marzio Massimo Castagna Giancarlo Bettini Alfonso Pompili Aldo Veschi Giovanni Cascino Giovanni Cinque Erasmo Galeani Agostino Capitoli Domenico Bellardinelli Enzo Dinetti Franco Centi Gianfranco Ausili Pietro De Paoli Giorgio Romani Angelo Lo Giudice Giorgio Baghini Massimo Locatelli Romano
1171 1172 1173 1174 1175 1176 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187
Maggiacomo Adelmo Caputo Piergiuseppe Cumillo Franco Cremona Francesco Paoletti Enrico Oliva Beniamino Scarciello Antonio Polidori Paolo Gullo Antonio Rotundo Antonio Viragh Attila Nanni Franco Risi Umberto Andreotti Piergiorgio Guglielmetti Amedeo Orsini Riccardo Pensarella Giuseppe (From the Capitol to the Olympic Stadium)
1188 Sacchi Carlo 1189 Sbernadori Mario 1190 De Mohr Ugo 1191 Trobiani Carlo 1192 Covrè Giuseppe 1193 Gatti Giovan Maria 1194 Bigioretti Vincenzo 1195 Bambara Francesco 1196 Sole Italo 1197 Bottoni Stefano 1198 Di Ronzo Pierantonio 1199 Peris Giancarlo
The new model of the Torch, whose conception was inspired by Prof. Maiuri from torches reproduced on ancient monuments, was made in bronzed aluminium by the Curtisa Firm of Bologna. The Torch weighs 580 grams and measures 40 cms. in height. During the relay from Syracuse to Rome it was lit with capsules containing special resinous substances produced by the firm of G. Belardini & Figli of Rome.
222
THE OLYMPIC VILLAGE
T he choice of a locality for the construction of the Olympic Village was dictated by considerations of a practical nature but the particular difficulties arising out of the creation of a new residential quarter posed complex problems and the dynamic solution to these was, however, reconciled with considerable aesthetic sense. The urban complex was planned in accordance with criteria of structural unity and bearing in mind the absolute necessities that the quarter be self-supporting in nature. Thus the requirements of an Olympic Village were studied in harmony to those of a welcoming town quarter, as described in detail in the chapter " Olympic Venues ". During the Olympic Games, the rooms, spacious and bright, were modernly furnished with one or two beds, a table, chairs, luggage racks, a large wardrobe and everything else necessary for the comfort of visitors. Each group of 7 to 9 athletes had at their disposal a series of hygienic amenities which included showers and baths and each appartment was also equipped with a small kitchen for the immediate necessities, especially at night, of the guests. In the organisation of Olympic Games, the setting up of an Olympic Village undoubtedly constitutes work of an onerous nature from every point of view. Since we consider it of interest to furnish full details on the organising effort taken to bring into being and run the Village in its Olympic function, as well as to report on the complex material in a clear and practical form, it is felt that rather than providing an outline of the process of evolution of the whole enterprise (conception, organisation and execution), it would be better to provide a picture of the activity carried out in the organising phase with particular stress on the criteria which prompted the same, and describe the practical functionning of the various sectors and services during the period the Village operated as such. (Table No. 1). The " Olympic Village " Section, constituted in September 1958, initially provided for the drawing up of the broad outline of the plans necessary for the good order, organisation and life of the Olympic Villages, care being ta225 15.
TABLE NO. 1 MANAGEMENT OF OLYMPIC VILLAGE Giuseppe Fabre
GENERAL SECRETARIAT Michelangelo Bassignano Serse Ascenzi RECEPTION
VARIOUS ACTIVITIES SECTOR
DISPLACEMENTS
HEAD OF SECT. OFFICE
Steno Borghese
2
13
7
1
3
11
8
4
9
5
10
18
14
12
6
24
19
22
16
20
23
17
21
26
34
36
38
29
33
35
37
39
30
40
31
41
27
LODGING
SERVICES
HEAD OF SECT. OFFICE
HEAD OF SECT. OFFICE
Ferruccio Colucci
Raffaele Ruggeri
42
45
43
46
49
52
71
74
78
44
47
50
53
72
75
51
54
73
76
70
77
PROVISIONING
32
25
15
48
28
91
82
92
97
87
93
98
88
94
99
95
100
83
86
79
84
80
85
81
89
90
HEAD OF SECT. OFFICE
96 Fannio Maviglia ADMINISTRATION 55
56
61
64
67
57
62
65
68
58
63
66
69
HEAD OF SECT. OFFICE
Carlo De Biase
101
59
102
60
103
104
105
106 107
108
GLOSSARY
BREAKDOWN OF THE SECTORS OF THE OLYMPIC VILLAGE
RECEPTION
SERVICES
36. - TRANSPORT OFFICE 37. - ENTERTAINMENT
1. 2. 3. 4. 5. 6. 7.
- ARRIVALS & DEPARTURES OFFICE
38. - MEDICAL ASSISTANCE OFFICE
- GUESTS DISPOSAL
39. - HYGIENE
-
LUGGAGE
71. - INTERNAL 72. - MUNICIPALITY PERSONNEL
40. - SICK BAYS
- LUGGAGE DISPOSAL
70. - CLEANING OFFICE
73. - TENDERING COMPANIES
41. - VETERINARY
74. - EXTERNAL
- PARCEL DELIVERY
75. - SWEEPERS
- LOST PROPERTY
76. - STORES DEPOSITS
- VISITORS OFFICE
LODGING
8. - INFORMATION
77. - MAINTENANCE OFFICE 78. - TECHNICAL TEAMS
9. - INFORMATION TO PUBLIC 10. - INFORMATION TO PRESS 11. - PERMIT OFFICE 12. - PROTOCOL 13. - ATHLETES INFORMATION 14. - " SUNDRIES OFFICE " 15. - TRAINING AND COMPETITIONS 16. - TRANSPORT 17. - TRAVEL AGENCIES 18. - NEWS CIRCULATION OFFICE 19. - COPIES
42. - MALE DELEG. QUARTER OFFICE
79. - SPECIALISED COMPANIES
43. - HEADS OF BUILDING
80. - ENGINEERS
44. - CLEANING OF LODGINGS
81. - LABORATORIES
45. - FEMALE DELEG. QUARTER OFFICE
82. - SUPERVISING OFFICE
46. - HEADS OF BUILDING
83. - MALE QUARTERS
47. - CLEANING OF LODGINGS
84. - GATES
48. - QUARTER PERSONNEL OFFICE
85. - INTERNAL
49. - MALE GROUP
86. - FEMALE QUARTER OFFICE
50. - DRESSING ROOMS
87. - GATES 88. - INTERNAL
51. - LODGINGS
89. - QUARTER PERSONNEL OFFICE
52. - FEMALE GROUP
20. - CIRCULARS
53. - DRESSING ROOMS
21. - SERVICES TO DELEGATIONS
90. - QUARTER SERVICES OFFICE 91. - SERVICES OFFICE
54. - LODGINGS
22. - COMMUNIQUES DISTRIBUTION
92. - VARIOUS
23. - DESPATCH RIDERS
93. - SAUNAS AND SHOWERS 94. - SHIPPING
24. - PUBLIC OFFICES
PROVISIONING
25. - BANCA NAZIONALE DEL LAVORO
95. - G O N D R A N D & Co. 96. - CUSTOMS
26. - POST AND TELEGRAPHS
55. - STATISTICS AND ATTENDANCE OF-
27. - TELEPHONES
FICE
98. - INTERNAL TRANSPORT
56. - CONTROL OFFICE
99. - LAUNDRIES
57. - FOODSTUFFS
DISPLACEMENTS
97. - SERVICES MESSES
100.
-
STORES
58. - LOCAL PURCHASE
28.
- PUBLIC OFFICE
ORDER
29. 30.
-
CASTELGANDOLFO
31.
-
NAPLES
AND
SECURITY
- PRATONI DEL VIVARO
59. - KITCHENS
ADMINISTRATION
60. - PAVILIONS 61. - INTERNATIONAL
WAGONS - LITS
COMPANY
62. - 10 RESTAURANTS 63. - VICTUALLING AND PERSONNEL
VARIOUS ACTIVITIES
64. - STORES OFFICE 65. - FOOD STORES
32.
- OLYMPIC CARDS OFFICE
101.
- CONTRACTS OFFICE
102. 103. 104. 105.
-
SHOPS
-
SERVICES
66. - EXTERNAL DEPOSITS
33. - CEREMONIAL
67. - OTHER COMPANIES OFFICE
34. - PRESS OFFICE
68. - SERVICE MESS
35. - TRAINING AND COMPETITIONS
69. - DISLOCATED MESSES
106. 107. 108.
AND
EMPLOYMENT
- PERSONNEL PAY OFFICE - ACCOUNTANCY OFFICE
AND
STATEMENTS
- PAYMENTS OFFICE STORES - DELEGATIONS
ACCOUNTS
OFFICE
227
Aerial view of the Olympic Village.
ken in the course of this work to bear in mind the many and differing requirements of an international community. In other words, the Section took measures and provisions adequate to bring together, lodge, feed, assist and facilitate the living conditions of thousands of athletes and accompanying personnel. It therefore created the organisation for the Management of the Olympic Village employing qualified and expert personnel competent to deal with the various branches of activity, both for the management and executive sides; it saw to the provision of materials and means in the quantities, varieties and types required by services and offices; and lastly it undertook gradually to attain the full working efficiency of the vast complex for the date fixed for the opening, the 25th July 1960. The two Sections of the Village, for men and for women, constructed in the area of Campo Parioli, and separated by a well-guarded fence, were completely autonomous as regards lodging and hygienic services, whilst they both shared the facilities of use of the canteen and all the other services laid on by the Committee composed of the following members:—Baraldi Rolando, Gotta Andreina, Davanti Mario, Funaro Giuseppe, Merlo Luciano and Turilli Gaetano. The possibility that all were able to share the places of general use constituted a special feature of the Rome Olympic Village. (Table No. 2). 228
GLOSSARY I Quarter 1 Building A CQ CE 33 C MB MG MV P J K Y W Z --
Staircase Head of Quarter Head of Building Infirmary Rest Room Luggage Stores Central Stores Foodstuffs Stores Parking Lot Post & Telecommunications Reception Bank Information Office Management of O.V. Internal boundary
TABLE NO. 2
ACCOMMODATION ALLOCATED TO EACH DELEGATION MALE QUARTERS
Nation
Initial
Afghanistan Antilles Argentine Australia Austria Bahamas Belgium Bermuda Brazil British Guiana Bulgaria Burma Canada Ceylon Chile Chinese Rep. Formosa Colombia Cuba Czechoslovakia Denmark Dutch Antilles Ethiopia Figi Finland France Germany Ghana Great Britain Greece
AFG ANT ARG AUS AUT BAH BEL BER BRA GUA BUL BIR CAN CEY CIL RCF COL CUB CSV DEN ATO ETI FIG FIN FRA GER GHA GRB GRE
Building no. 11 3 3 19 31 29 31 11 3 24 24 11 26 10 4 10 4 4 23-24 16-17 4 4 11 16 32 30 11 25-26 21
Nation Guatemala Haiti Holland Hong Kong Hungary Iceland India Indonesia Irak Iran Ireland Israel Italy Japan Kenya Korea Lebanon Liberia Liechtenstein Luxemburg Malaya Malta Mexico Monaco Morocco New Zealand Nigeria North Borneo Norway
Initial GUT HAI PBA HOK UNG ISL IND INS IRK IRN IRL ISR ITA GIA KEN COR LIB LIE LIC LUX MAL MAT MEX MON MAR NZE NIG BOR NOR
Building no. 4 3 17 26 22 16 10 11 11 10 17 29 20-21 21 11 11 10 11 24 31 10 29 4 31 10 19 11 11 17
Nation Pakistan Panama Peru Philippines Poland Portugal Puerto Rico Rhodesia Rumania San Marino Singapore Somalia South Africa Spain Sudan Surinam Sweden Switzerland Thailand Tunisia Turkey Uganda U.A.R. U.S.A. U.S.S.R. Uruguay Venezuela Viet-Nam Yugoslavia
Initial PAK PAN PER FIL POL POR PRI RHO ROM SMA SIN SOM SAF SPA SUD SUR SVE SVI TAI TUN TUR UGA RAU SUA URS URU VEN VIE JUG
Building no. 10 29 4 4 24 4 3 29 24 32 26 11 29 3 4 17 17 24 11 11 11 11 10 27-28 24 4 ?4 11 22
FEMALE QUARTERS All nations were accommodated in buildings 12-13-14-15-16-17-18 and distinguished by their respective initials.
The body responsible for the work of organisation and management, rendered necessary by the daily requirements of the guests and created on a scale sufficient to meet the estimated number of guests, was divided off into six separate sectors corresponding to the basic requirements, i.e. Reception—Lodging—Provisioning—Services—Administration—Displacements. In addition, a Management Office with its Secretariat was set up to direct and co-ordinate the activities of the aforesaid sectors and to maintain contact both with the Organising Committee and with the Organisations and persons interested in the Olympic Village. Specific tasks were assigned to each sector, i.e.:— (a) Reception Sector, to provide for the organisation and functioning of the " Arrivals and Departures " services, for the settling of the customary formalities; " Information Services " for the collecting and publication of news for the use of guests of the Olympic Village, the public and other Services and Offices of the Organisation; " Visitors Service " for organising the flow of incoming persons; " Social and Recreation " to render the stay of the guests of the Olympic Village more pleasant and interesting; " Public Services and Shops " for bank, postal and telephone services and to allow the quick location of basically essential articles. 230
Busy movement and waving of flags at the entrance to the Olympic Village.
(b) Lodging Sector, to see to the organisation and management of lodging for:—the athletes and their accompanying personnel and for the personnel in charge of the services of the Olympic Village:—to the accommodation organised in ten "Quarters", each composed of a varying number of "buildings". (c) Provisioning Sector, for the organisation and management of feeding arrangements for the athletes and their accompanying personnel, for the personnel in charge of the services of the Village, assuming a structure made up of " Offices " (Direction, Restaurant, Management, Food Stores Management, Inspection Office, Statistics Office) and " Installations " (10 Restaurants—a staff canteen—centralised depot for foodstuffs with 4 shops inside and refrigerating units outside the Olympic Village). (d) Displacements Sector, for the lodging organisation of displacements from the Olympic Village to those zones or places where the yachting events (Naples), rowing (Castelgandolfo) and equestrian sports (Pratoni del Vivaro) took place; to co-ordinate the use of specialised soldiers, grouped into a " supporting detachment " to meet the requirements of particular services, for the Village and for the above-mentioned displacements. (e) Administration Sector, to see to the settlement of formalities of an administrative nature directly or indirectly interesting the management of the Olympic Village, on the basis of technical bookkeeping, or general and specific instructions given by the Administration Section of the Organising Committee, and divided off into offices corresponding to the various branches of administrative activity:—Book-keeping, Payment and rendering of accounts, Bursar's Office, Delegatian Accounts. (f) Services Sector, to provide for the organisation and working of services of general use such as:—cleaning of places of general use and outside areas; maintenance of installations, buildings and gardens of the Village; inspection inside and on the borders of the Village; accessory services; saunas and showers, Customs, Transport, etc. The major problems in the organisation of the Village created the necessity of determining and providing the necessary personnel and materials; of establishing the criteria of allocation of the appartments and providing in good time for their equipment and, lastly, of creating an adequate service of provisioning. The solution as regards finding suitable personnel also included the determination of the quotas of personnel to be employed in stipulated tasks and particular services; the individualisation of sources and the settlement of forms of recruitment; the formulation of a plan for the gradual assumption of the personnel chosen. The determination of the " quotas " and " tasks " (Table No. 3) was established according to the organic structure of the Direction of the Olympic Village and according to the onus of the number of guests, and the corresponding amount of work involved. 232
TABLE NO. 3
Various activities
—
—
—
—
—
—
— 1 2 8 — — — —
— 1 1 — 10 29 — —
— 1 1 7 — — — 1
—
— — — —
— 1 1 4 — — — —
— 1 — 4 — — — —
— 1 — 3 — — 40 1
1 1 7 5 31 10 29 40 2
— — 17 2 6 — — — — — — 4 — — — — — — — — — — — — — — —
— — 55 26 24 30 — — — — — — — — — — — — — 30 — — — — — — —
— — 63 5 7 — — — — — — 2 109 — — — 91 — — — — — — — — — —
— — 68 2 10 — 143 77 111 262 204 2 — — — — 70 — — — — — — — — — —
— — 10 — 4 — — — — — — — — 41 32 40 — 540 17 — 30 113 — — — 14 —
— — 22 1 3 — — — — — — 2 — — — — — — — — —. — — — — — —
— — 10 2 2 — — — — — — — — — — — 69 — — — — — 53 7 7 — —
14 14 4 5 4 — — — — — — 2 — — — — 33 — — — — — — — — — 192
14 14 249 43 60 30 143 66 111 262 204 12 109 41 32 40 263 540 17 30 30 113 53 7 7 14 192
32
176
318
959
846
1 — 4
34
155
313
TOTAL
Displacements
—
Lodging
1 1 — — 1 — — — —
Reception
Administration
TOTAL
Services
Director Vice-director Heads of Sector Vice-heads of Sector Heads of Office Heads of Quarter Heads of Building Doctors Veterinaries Physiotherapists and Assistants Nurses and masseurs Employees Interpreters Shorthand typists and typists Runners Heads of Restaurants Services Coffee servers and Dispensers Commis Waiters Kitchen staff Ushers Cloakroom attendants Specialised workmen Gardeners Sweepers Servants Women cleaners Men cleaners Porters Labourers Gate-keepers Public Security agents Traffic Police Fire Brigade personnel Night watchmen Drivers
Management
QUALIFICATION
Feeding
STRUCTURE OF PERSONNEL OF THE OLYMPIC VILLAGE
2,833
233
The measures taken for the individualisation of sources and the settling of forms of recruitment were conditioned by the necessity to:— - be assured, above all, of the conscientiousness, and continuous working capacity of the individuals forming part of the Organisation; - carry, as far as possible, the onus of the expense, in view of the fact that the temporary nature of employment and the coincidence of the tourist season would not have favoured either requirement, especially in the case of certain specialisations. Thus recourse was had to:— - the collaboration of personnel offered by Government, Municipal and civil bodies, as a general rule using their skills for the carrying out of tasks of management; - the assumption of the majority of the personnel employed for office duties by means of open offer, with contract for a fixed period; - the holding of courses within the competence of the E.N.A.L.C. (Italian Restaurant Training Institute) to guarantee the availability of staff and waiters for the restaurant services; - private firms with exclusive contracts for the carrying out of determined services (management of restaurants and food stores, cleaning of buildings, maintenance of houses and installations, transport of guests' luggage, etc.). In order to graduate the incrementation of personnel with the development of the organising complex a plan was formulated for the gradual assumption of personnel destined to work in the Olympic Village. (Table No. 4). An estimate of the requirements both in quantity and variety was necessary before the material could be provided this being:— - furniture series (bed, mattress, blankets, sheets, bedside table, small table, wardrobe, bedside mat, chairs) for bedrooms; - furniture and typewriters for the Direction and Delegation Offices; - materials and equipment for the restaurants and staff canteen; - consumable materials for hygienic, maintenance and heating services; - equipment for stores; - communication and transport services. It should, however, be pointed out that the criterion generally followed to ensure the availability of materials was to proceed, after appropriate enquiries, to contracts stipulated with organisations or firms, by which the necessary materials were hired for a fixed period of time, thereafter being returned after use. In addition, arrangements were made for the free use of apparatus and instruments such as television and radio sets, electric razors, irons, cooking stoves, washing machines, etc. Lastly, recourse was had to actual purchase of limited quantities of consumable materials (with the exception of liquid gas) and others not otherwise obtainable (kitchen ware, uniforms for the restaurant staff, etc.). 234
TABLE NO. 4
INFLUX AND ATTENDANCES OF PERSONNEL IN THE OLYMPIC VILLAGE DIRECTIVE PERSONNEL
GENERAL ORDER PERSONNEL
EXECUTIVE PERSONNEL
TOTAL
A policeman explains the significance of the symbol of Rome, hoisted at the entrance to the Olympic Village, to a group of Philippine athletes.
The preparation of lodgings. The following provisions were made for the equipment and allocation of the lodging quarters:— — the composition and arrangement of beds according to the dimensions of the rooms available in the various appartments; 236
- the planning of operations for arrival and arrangement of furniture according to availability of time between the handing over of the appartments and the opening of the Village. Such planning entailed the drawing up beforehand of programmes to cover transport and equipment operations. The distribution of appartments for men was made to groups of ethnically related Delegations, gathered in a " quarter " or " building " of their own, according to the numerical strength of their components. Each Delegation was lodged in a " building " according to its numerical strength and, for each Delegation, one (or two) rooms were equipped for office use and one (or two) for massage rooms. Centralised showers and saunas were available in addition to the hygienic services in each appartment. The women were gathered in a single quarter completely enclosed, with one or more appartments for each single Delegation; showers and saunas separate, besides the hygienic services available in the appartments; a room equipped for massages in each building. The decision to include to Women's Section of the Village in the same area as the Men's presented no problems of any kind. We may even go further and state that this appeared the ideal solution; the women could make use as they wished of the restaurants, assembly rooms, the streets of the Village being open to all the athletes without distinction. On the other hand, it was strictly forbidden to cross the closely-guarded gates leading to the Women's Section of the Village.
The feeding of the guests. The feeding of the guests called for a series of provisions to guarantee the success of the provisioning service. These concerned the provisioning and supply of foodstuffs and the composition of the various dishes. In order to ensure the provision of foodstuffs in the necessary varieties and quantities, it was decided to compile a general list of dishes, which was then submitted for approval to all the Olympic Committees taking part in the events; to make out on the basis of this list another list of foodstuffs, with the estimated quantity of each required; after careful enquiry, to stipulate a network of contracts for supplies "according to consumption" extended to the whole of the national market and, in some cases, also to the foreign market. In order to assure the prompt supplying of foodstuffs, it was decided to organise a series of centralised depots where, if necessary, sufficient quantities of products supplied could be stored so as to provide daily replenishment for the restaurants of the quantities and varieties required by these. To guarantee that the foodstuffs provided satisfied the requirements of guests widely differing in tastes and habits, it was decided to entrust the management of the restaurants to a specialised and well-reputed firm (the Inter237
The walker, D. Thompson, having had his luggage placed in his room in the Olympic Village, is not smiling... at the photographer but the English athlete will be smiling at the finish of the 50 kms. Road Walk: a gold medaller.
238
The Russian, R. Shavlakadze, is trimming his moustache after his victory in the high jump with 2.16 metres.
national Company of Wagons-Lits), so as to benefit from its wide experience and particularly well-qualified and expert personnel; to integrate the general list of foodstuffs with the compilation of particular lists composed of absolutely typical dishes in use in the various Countries present; to include among the cuisine personnel of each type cooks recruited from the various Countries or who had come in response to a request on behalf of the Organisation to personally superintend the preparation of the most popular dishes; to stimulate the daily agreement between the Heads of Delegation and the respective Restaurant Managers in the compiling of the list of food to be served to the guests the following day. The adoption of these measures also permitted the individual athletes to choose and follow the type of diet best suited to the requirements of their particular sports, the scrupulous observance of this diet—it should be stressed— being the exclusive responsibility of the athlete and personnel of each Delegation. The preparation of the restaurants was seen to and completed on the basis of an experimental programme carried out in conjunction with a course for the training and qualifying of staff and waiters. 239
The experimental programme allowed final touches to be made to the allotments of material and equipment for each pavilion and a plan for the preparation of the remaining restaurants. Other solutions which may be termed secondary, i.e. having an accessory nature, were nevertheless absolutely indispensable for the complete functional efficiency of the Village. These requirements bore especially on the field of assistance and included hygienic health service; maintenance of order and security in the Olympic Village; the functional and pleasant living conditions in the Village under the headings of a number of particularly important living amenities of the guests (communications and transport—immediate availability of information, essential services and articles—postal, bank and telephone services—possibility for recreation and social meetings); the protocol of greeting to mark the arrival in the Village of the various national delegations. The measures taken in these fields were adapted to the particular character and nature of each and every requirement and thus the measures and services which resulted remained outside the organising and functional competence of the Management of the Olympic Village. The importance and interest assumed by the hygienic health assistance service within the framework of the Olympic Organisation led to the creation of a special Committee linked to the Medical and Scientific General Committee and composed of famous personalities in the various fields of medical and surgical science and hygiene. This Committee had the task of organising and directing all the necessary health hygiene services in each sector of Olympic activity and, therefore, also in those of the Olympic Village. In order to ensure pleasant inhabitation of the Olympic Village, a system had to be evolved—as co-ordinated and economical as possible—of qualified services to provide facilities for the guests staying within the wide limits of the area (some 13 km. of road in an area of 350,000 sq. m.). Thus arrangements were made for the acquisition of news on the availability of training venues and on the programme of events; for the effecting of bank and postal and telegraphic operations; internal communications and easy location of services (hairdresser, tailor, shoemaker), of personal articles and objects (medicaments, laundry and cleaning, newspapers) were ensured while, lastly, possibilities of meeting and entertainment were created. It was therefore decided to detach personnel and transport from other Sections of the Committee to certain offices of the Management of the Olympic Village, linking their work and integrating their activities:—personnel from the Technical Section to the Information Office, to see to news on the availability of training venues and programmes of events; personnel from the General Secretariat to the Arrivals and Departures Office, to deal with the stamping of the Olympic Cards; personnel from the Protocol Section to the Reception Sector, for anything in connection with Ceremonies for the official greeting by 240
The Olympic Village.
TABLE NO. 5
SHOPS AT THE OLYMPIC VILLAGE ARTICLES SUPPLIED
CONCESSIONARY FIRMS
Air travel Footwear and sports articles Florist Tourist services Non-alcoholic beverages Newspapers and magazines Electrical domestic appliances Men's and ladies' hairdresser Shoeblacks Typewriters Clocks and watches Philatelic assistance Photographic accessories General stores Men's and ladies' tailor
Alitalia Burdese Cardilli & Zamponi C.I.T. Coca-Cola F.I. Newspaper Editors Hoover Maestrelli & Sons Marchioni Brothers Olivetti Omega Philatelic Office Vasari Zingone Zingone alla Maddalena
TABLE NO. 6
ACTIVITY AND TIMES PHASE
TIME
ACTIVITY
Ideas. Premises. Directives. Up to June 1,959
Preliminary
Study and estimate of the requirements. Outline of the organising complex. Definitions, criteria and provisions. Various arrangements.
from June 1959 to June 1960
from June 1960 to 25 August 1960 from 25 August 1960 to 20 Sept. 1960
Planning for influx of personnel and equipment. Planning for preparation of living quarters, restaurants and services. Organic completion.
Organising
Preparation Executive Management
Effecting of plans for preparation of offices, lodgings and services. Arrival, stay and departure of guests.
241 16.
the Committee and Management of the arriving Delegations; personnel from the Press Section to the Reception Sector for the service of communiques to the Press; personnel and vehicles from the Transport Section to the Services Sector for the organisation of transport for the Management and Delegations (a jeep and scooter for each Delegation). In another pavilion, the offices for the postal and telegraphic service functioned, with personnel and transport placed at their disposal free of charge by the Ministry of Post and Telecommunications and a bank office with personnel and transport offered by the Banca Nazionale del Lavoro. A number of public offices for the sale and distribution of articles and objects of a personal nature and primary importance were placed under the jurisdicion and control of the Reception Sector. To this end shops standing under the porticoes of a number of buildings were leased out to private qualified Firms, these being managed by the concessionary Firms themselves. See table No. 5. In order to complete the picture of the various matters dealt with which will give some idea of the work carried out, the periods allowed for development of the various activities and the consistency i.e. the study, planning and implementing of the whole enterprise, must be stressed and remembered. The comparison of data will be sufficiently indicative. (Table No. 6).
Reception Sector. The organisation of the Reception Sector disposed of a " Direction " prepared for all services of reception; of an " Arrivals and Departures Office " for the settling of the habitual formalities in connection with the arrival and departure of the guests; of an " Information Office " for the collection and propagation of news useful to the guests of the Village, the Management Offices and visitors to the Village; of a " Visitors Office " for the granting of the necessary passes; of a " Social and Recreation Office " to render more comfortable and pleasant the hospitality offered to guests; and of a group of " Public Offices " for postal, telephone and bank services. The activities of the Arrivals and Departures Office consisted of explaining formalities regarding the arrival and departure of the guests; formalities which became identified with the actual framework of the Office, which was divided into three branches, i.e. reception, to welcome the guest with the customary greeting; lodging, for the complete assistance to the guest moving into and leaving his lodging on arrival or departure; book-keeping, for entering, keeping up-to-date, and communication to all other interested Offices of personal data and the numbers of guests in the Village. In practice, each arrival was communicated in advance to the Protocol Sector while each departure was preceded by notice of same in advance by 242
the Head of Mission to the Arrivals and Departures Office, followed by the help of the Olympic Village Transport Department for the accompanying of the departing persons and their luggage as far as their points of departure; each departure was concluded by the consequent variations to the " Delegation Account " and communication of the departures to the interested offices. The situation of the daily presences of guests (by names and numbers) was brought up-to-date daily by means of the mechanographic system on the
The American, Jeff Farrell, one of the strongest swimmers in the Olympic 4 × 200 metres relay, gives a haircut to the Ghana athlete, W. A. Quaye, whilst his friend E. Q. Quartey looks on amused.
243
basis of " Olympic Cards " temporarily deposited by guests and of information on the arrivals and departures of same; thus this situation was communicated to all interested Offices and Services by means of lists of names of arrivals and After having received the gold medal for the 3-metre diving, the American, Gary Tobian, signs autographs for his admirers.
TABLE NO. 7
ARRIVALS AT THE OLYMPIC VILLAGE
departures; by means of a general name index of persons present subdivided by nation and sex, in alphabetical order; by means lastly, of a summarised numerical outline of the situation, distinguished by nationality and listed in alphabetical order, of persons present from day to day and of the total presences of guests and horses from the date of opening of the Olympic Village. These operations made it necessary for the Office to operate during all twenty-four hours of the day, employing a total of 30 persons, alternating in three shifts of eight hours each. The work accomplished was considerable and the results obtained without doubt satisfactory when we consider that the movement of guests in one single day registered such impressive figures as the following peak points in the same day:—964 persons arriving and 1,487 persons departing. (Tables Nos. 7, 8, 9 and 10). 245
TABLE NO 8.
DEPARTURES FROM THE OLYMPIC VILLAGE
The Information Office. If it is true that the information compiled by certain Delegation Accounts on the persons in question was not absolutely exact this was always due to circumstances beyond their control, for example the guest who possessed an Olympic Card declaring him resident in the Olympic Village but who preferred to stay in a hotel; or a number of Missions who completely omitted to declare the departure of some of their athletes, or else compiled the appropriate forms giving notice of departure inexactly. The " Information Office " set up for the diffusion of news useful to the guests, visitors and various services of the Village, following on considerable work of preparation for the gathering, sorting and cataloguing of informative 246
TABLE NO. 9
PRESENCES OF ATHLETES IN THE OLYMPIC VILLAGE
material, was adapted during the period of functioning of the Olympic Village to the many information requirements, i.e. the following services came into being:— - information services within the Village reserved for the guests to provide further guidance in all fields of the Olympic activities with the help of eight interpreters (alternating in two shifts) and by means of informative material mainly consisting of collected news arranged by subject-matter and in alphabetical order. This work was carried out in co-operation with personnel detached from other sections (Technical Section for information of the programmes of training and events; transport section for requests for transport not already provided for); 247
TABLE NO. 10
PRESENCES (PERSONS x DAYS) OF PERSONS AND HORSES FOR EACH DELEGATION PERSONS
HORSES
DELEGATIONS PRESENCES
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43.
248
-
Afghanistan Antilles Argentine Australia Austria Bahamas Belgium Bermuda Brazil British Guiana Bulgaria Burma Canada Ceylon Chile Chinese Republic of Formosa Colombia Cuba Czechoslovakia Denmark Dutch Antilles Ethiopia Figi Finland France Germany Ghana Great Britain Greece Haiti Holland Hong Kong Hungary Iceland India Indonesia Irak Iran Ireland Israel Italy Japan Kenya
383 369 2,663 5,536 1,765 484 1,929 122 2,412 302 2,339 419 2,506 194
GUESTS
43
PRESENCES
288 108 9 44 192 85 96
334 1,661 454 291 2,497 2,238 114 462 104 2,305 4,278 6,827 628 5,286 1,171 40 2,881 115 4,128 230 1,500 1,291 728 1,043 1,007 838 7,515 6,014 860
48 61
140 146 165
78
118
407
36 100
GUESTS
PERSONS
HORSES
DELEGATIONS PRESENCES
44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63. 64. 65. 66. 67. 68. 69. 70. 71. 72. 73. 74. 75. 76. 77. 78. 79. 80. 81. 82. 83. 84. 85.
-
Korea Lebanon Liberia Liechtenstein Luxemburg Malaya. Malta Mexico Monaco Morocco New Zealand Nigeria Norway Pakistan Panama Peru Philippines Poland Portugal Puerto Rico Rhodesia Rumania San Marino Singapore Somalia (did not participate in the Games) - South Africa - Spain - Sudan - Surinam - Sweden - Switzerland - Thailand - Tunisia - Turkey - Uganda - United Arab Republic - U.S.A. - U.S.S.R. - Uruguay - Venezuela - Viet-Nam - Yugoslavia F.I.B.A. TOTALS
GUESTS
1,928 429 311 141 814 410 362 2,033 357 1,869 1,391 531 858 1,669 183 599 1,669 3,429 1,669 531 601 3.922 294 224 125 2,169 3,561 376 33 2,393 2,647 725 1,419 1,852 332 2,654 9,327 9,956 1,350 1,353 138 2,176
PRESENCES
GUESTS
84
19
176 172
380
297
24
200 130
13
300 208 406 402 140
3 146,739
811
4,628
13
249
- information service for outside the Village, reserved for the public and especially for visitors to the Village—this functioned by means of interpreters and informative material on the Olympic Village; - communiques and bulletins service set up for the publication among the guests of official news and news on certain aspects of life in the Village. Communiques and bulletins (three weekly publication) were stencilled in three different languages (French, English and Italian). TABLE NO. 11
VISITS BY THE PUBLIC TO THE OLYMPIC VILLAGE
250
A copying service was also set up for the translation into the official languages and the reproduction in copies of official communiqués, for internal circulars and for the printing of posters, and the compiling of cards and passes. A centre for collecting and distributing the communiques and various compilations saw to the distribution of all informative and propaganda material. Thirty persons, for the distribution and delivery of communiqués or particularly urgent packets, were used for this service. A special information service on the telephone numbers of the Village was rendered necessary by the fact that the telephone network of the Village was directly inserted into the urban network of the Italian Telephone Service. This service was carried out by military telephonist-interpreters who worked in shifts, thus assuring a constant 24-hour service. The absolute necessity of organising the large numbers of people who all had some reason or right to enter the Village itself led to the organisation of a Visitors Office. This office, located in the entrance pavilion, provided for the release of passes after due compilation of the appropriate form and the deposit of an identification document from the applicant. Free entrance was allowed to all those holding an Olympic Card, who were issued with permanent cards. The total number of passes issued reached a total of 34,906, of which 8,577 for the press, 26,329 to the general public, with a peak of 1,847 passes issued in the single day of 4th August. (Table No. 11). Particular care was devoted to the activities of the Social and Recreation Office. Its policy was to try and create an atmosphere of relaxation and entertainment for the guests who had decided to spend their free time in the Village. One of the main tasks of this Section was the organisation of a large meeting-room where non-alcoholic beverages, ice-creams and sweetmeats could be obtained. It was furnished with armchairs and small tables and contained a record-player. In addition to this, some 80 television sets were installed in the porticoes of the buildings, and 1,000 armchairs and ten table-tennis tables were provided. Lastly, programmes were drawn up for evening cinema sessions as well as various other entertainments and programmes of music and songs. Television and cinema programmes were especially popular with the guests. It should be noted that the open-air cinema in the Village showed 50 consecutive hours of programming with a total of 33 evening shows and a total audience of 24,000 persons, with a maximum evening attendance of over 1,000 spectators.
Lodging Sector. The organisation of the Lodging Sector was composed of:—Management of Sector dealing with all lodging services; ten Services of Quarters, each corresponding to a definite group of buildings (a Quarter) for the lodging of the 251
guests of the two Sections of the Village and the personnel of the services; two Branches (at Villa Glori and Pratoni del Vivaro) for the lodging (in stables) of the horses entered for the equestrian events and for the accommodation (through lodging services) of their respective personnel; a centralised service for the washing of sheets and towels and for the constant supply of articles of general consumption. The preparation and distribution of buildings was carried out on the principle of keeping the guests grouped together within their own Delegations; of grouping the Delegations as far as possible according to their ethnic affinities;
A writing room for the athlete guests of the Olympic Village.
setting aside for the individual national groups a number of beds and of general purpose rooms (representation offices and massage rooms for the Delegations—offices and stores for the lodging services) in accordance with the numerical strength of each of these and contained within the limits of one or more buildings of the same quarter (groups of ethnically related Delegations). In view of the necessities of the personnel of the Management of the Olympic Village it was decided to divide the buildings into 8 quarters for the Men's Section of the Village, 1 quarter for the Women's Section and 1 quarter for services, each of these including a varying number of buildings and thus of appartments and rooms. Each quarter was provided with its own lodging service whose size depended on the number of buildings included in the corresponding quarter. On the assumption that the buildings were composed of appartments with receptive capacity varying from 2 to 5 rooms and from 1 to 2 bathrooms (besides kitchen) and that each bedroom took at least one or two beds (three in exceptional cases), the equipment of the buildings was undertaken with materials as indicated in Table No. 12. This material served to equip a total of:—7,594 beds, 184 rooms for use as offices and 146 as massage rooms in the Men's Section of the Village; 921 beds, 248 bathrooms, 27 rooms for use as offices in the Women's Section; 1,634 beds, 25 rooms for office and other use in the Services Quarter; 181 beds in detached sections. (Table No. 13). The work undertaken by the Sector responsible for the furnishing of accommodation was particularly noteworthy. It was a question of obtaining, organising the influx and placing in 7,683 variously located rooms (4,723 normal rooms and 2,960 service rooms) of a total of 1,500 tons of varied material with a volume of over 20,000 cubic metres in a period of time slightly in excess of forty days. The undertaking was completed thanks to a very careful plan of preparation, which included control of transport and the actual placing of furniture into the respective appartments, but above all because of the enthusiasm and steadfast sense of duty on the part of the personnel of the Sector. The functioning of the services of the quarters was ensured by 842 persons who included:—10 Heads of Quarter, 29 Heads of buildings; 30 storekeepers, 21 assistant store-keepers and 12 employees; 108 lady housekeepers and 550 women cleaners. (Table No. 14). The choice of suitable personnel for duties of a somewhat delicate nature such as Head of Quarter, Head of Building and storekeepers naturally fell on military personnel, whilst choice was made from school services personnel, kindly placed at disposal by the City Administration, for the linen-room duties. 253
TABLE NO. 12
THE FURNISHING OF LODGINGS MATERIAL
FOR LODGINGS Cupboard
4,806
Drying racks
970
Vacuum cleaner
110
Clothes hangers
3,783
Plastic container
MATERIAL
QUANTITY
QUANTITY
Mirror with bracket
4,932
Table
6,570
Small tables
161
VARIOUS SERVICES Lorries
66
200
Cars
5
Blanket
6,454
Jeep
105
Bed cover
8,048
Motor-scooter
100
Bed table
3,134
Motor-scooter rickshaw
Table cover Bookcase Pillow-case Ironing iron
70 100 21,610 344
10
Motorcycle
3
Alfa Romeo car
2
Horse-van
16
Special mobile crane
3 7
Woollen pillows
10,116
Special trailers
Clothes hanger
22,672
Telephones
584
291
Radio receiving sets
150
Sheets
45,638
Waste-paper baskets
1,505
Bed
10,389
Caps for servants
2,004
Drying cloths
7,075
Washing machines
Polisher Table lamps Sewing machine Woollen mattress
24 4,183 27
Gowns for servants Lavatory paper rolls
71 20,000
10,708
Aprons
4,317
Bench
517
Jackets
2,312
Arm-chair
111
Typewriter
Refrigerator Electric razors Bedside carpets Chair Luggage carrier Desk Book racks Stools W.C. brushes
254
149
64
Ash-trays
2,150
296
Key-rings
4,364
3,078
Trousers
710
Dust collectors
46
3,132
Racks
41
6
Cloths
1,500
10,276
127 12,616 1,774
Clothes brush
52
Dustbin
91
Plastic bag
9,600
MATERIAL
Glass covers Massage tables
MATERIAL
QUANTITY
7,000 150
Saucepans
QUANTITY
229
Sieves
51
Ping-pong tables
10
Bread-baskets
90
Key holder boards
57
Cutlery boxes
62
Television sets
70
Coffee pots
107
378
Fruit forks
7,500
Forks
7,502
Ventilator
FOR RESTAURANTS Refrigerator stores
40
Gas boilers
20
Cold plate bench
100
Steam cooker benches
60
" Elco „ gas cookers
10
" Elco gas cooker mod. 5 & 1
10
Refrigerated container
160
Fruit juice containers
40
Iced water fountains
20
Ice cream refrigerator
20
Automatic washing machine
10
Sink Mincer, grater and vegetable slicer machine Potato peeler machine Kitchen table
110
Meat hook Grater
11
Toasters
15
Funnel
24
Salad bowls
120
Ladle
130
Axe
10
Oil-cruet
218
Frying pans
134
Soup sieves
31
Potato peeler
40
Kitchen shovel
50
Pots 10
Plates
10
Egg-cups
160
400
110 35,310 500
Flour sieve
41
Glasses
29,002
Bone saw
11
Bowls
4,000
Skimmer
80
Basins
76
Spatula
10
Ferton bath
43
Salt cellar
605
Water basin
493
Trencher
100
White bags
610
Baking-pan
220
Weighing-machine Cooks headgear Meal trolley
12 242 55
Pan Cup and saucer Paper napkins
37 6,000 2,020,800
Knives
7,583
Tablecloths, cotton
1,100
Coffee spoons
8,000
Cotton napkins
6,000
Spoons
7,506
Resin tray
5,000
255
The assignment of Duties. In order to give a clear idea of the functioning of the Quarter services and to demonstrate the sense of responsibility that guided the Organisers in setting up services of this kind, it has been decided to outline the duties of each person and to point out the particular requisites called for. The Head of Quarter, a senior Army officer with a knowledge of the language spoken by the guests of his quarter, was responsible for keeping up courteous and friendly contacts with the Heads of Missions and all guests, providing all information in connection with the internal organisation of the Village, the Games and events of a cultural, artistic and folkloristic nature taking place in occasion of the Olympic Games. He had to welcome Heads of Missions and athletes on their arrival and accompany them to the premises
Past and present glories of athletics; the unforgettable Owens, protagonist in the 1936 Olympic Games, during a visit to the Olympic Village attempts, for fun, to beat the German, Armin Hary, at a spurt.
TABLE NO. 13
BEDS PREPARED FOR MEN
BEDS
PREPARED
QUARTER
MAXIMUM SERIAL
No.
DELEGATIONS
GUESTS
NUMBER PRESENT TOGETHER
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Antilles Argentine Brazil Chile Colombia Cuba Dutch Antilles Ethiopia Haiti Mexico Philippines Peru Portugal Puerto Rico Spain Sudan Uruguay Venezuela TOTAL
II
19 20 21 22 23 24 25 26 27 28 29
Afghanistan Bermuda Burma Ceylon Figi Ghana India Indonesia Irak Iran Kenya
for service personnel
for guests
20
18
20
137
111
147
100
95
105
10
10
13
27
23
28
12
10
12
6
6
7
14
14
18
2
2
6
90
90
99
45
44
59
48
42
50
68
68
80
35
33
38
188
183
210
20
20
24
53
49
65
47
47
55
922
865
16
16
23
15
11
12
15
16
23
7
7
8
16
1,052
4
4
6
11
11
16
76
66
90
76 32
66
90
32
37
36
36
50
33
33
41
257 17.
QUARTER
BEDS PREPARED MAXIMUM SERIAL
DELEGATIONS
No.
31 32 33 34 35 36 37 38 39 40 41 42 43 44
Korea Lebanon Liberia Malaya Morocco Nigeria Pakistan Rep. of China - Formosa Somalia Thailand Tunisia Turkey U.A.R. Uganda Viet Nam TOTAL
45 46 47 48 49 50 51 52 53 54
Australia Denmark Finland Holland Iceland Ireland New Zealand Norway Surinam Sweden TOTAL
IV
55 56 57
Greece Italy Japan TOTAL
258
NUMBER PRESENT TOGETHER
30
III
GUESTS
for service personnel
for guests
65
63
75
22
22
27
9
9
13
17
17
22
80
78
100
19
19
25
61
61
76
59
58
66
5
5
6
38
38
53
67
65
75
82
72
96
106
100
140
15
15
16
7
7
11
931
893
190
171
16
1,168
205
139
115
152
139
120
152
111
108
124
13
13
14
62
55
65 40 52
38
38
49 3
43 3
4
130
117
145
874
783
16
969
51
49
62
343
370
206
299 202
600
550
12
224 668
QUARTER
BEDS PREPARED
V
MAXIMUM SERIAL
No.
DELEGATIONS
TOGETHER
58 59
Hungary Yugoslavia
60 61 62 63 64 65 66 67
British Guinea Bulgaria Czechoslovakia Liechtenstein Poland Rumania Switzerland U.S.S.R. TOTAL
VII
68 69 70 71 72 73 74 75 76 77 78
Bahamas Canada Great Britain Hong Kong Israel Malta Panama Rhodesia Singapore South Africa U.S.A. TOTAL
VIII
NUMBER PRESENT
TOTAL
IV
GUESTS
79 80 81 82 83 84 85
Austria Belgium France Germany Luxemburg Monaco San Marino TOTAL
203 139
189 138
342
327
8 157 134 10 233 143 187 366
8 128 130 10 215 141 137 259
1,238
1,128
3 104 254 5 44 12 5 13 5 63 333
3 88 230 5 42 12 5 9 5 63 312
841
774
110 125 259 356 59 15 14
110 113 213 302 48 15 14
938
815
for service personnel
for guests
5
260 171 436
9 175 150 12 250 159 197 376
16
1,344
4 116 270 6 51 13 6 15 6 73 370
16
946
118 135 270 375 62 20 15
16
1,011
250
The youngest guest in the Olympic Village: the Rumanian cox, Roger Mircea, has the day off... adequately escorted.
260
BEDS PREPARED IN QUARTER IX RESERVED FOR WOMEN BEDS PREPARED MAXIMUM SERIAL
DELEGATIONS
NUMBER
GUESTS
No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Antilles Argentine Australia Austria Belgium Brazil British Guinea Bulgaria Canada Chile Chinese Republic - Formosa Cuba Czechoslovakia Denmark Finland France Germany Ghana Great Britain Holland Hong Kong Hungary Iceland Indonesia Ireland Israel Italy Japan Korea Luxemburg Mexico New Zealand Panama Philippines Poland Portugal
2
PRESENT
for
for service
TOGETHER
guests
personnel
2
2
1
1
1
34
34
45
23
23
34
8
8
8
1
1
1
3
3
3
13
13
12
12
19 12
1
1
1
4
4
4
2
2
2
15
15
21
13
13
24
11
11
12
28
28
40
60
60
82
2
2
2
49
47
60
35
35
46
2
2
2
3
3
3
1
1
1
2
2
2
2
2
2
6
6
6
43
43
44
24 1
24
36
1
1
6
6
6
7
7
7
5
5
6
5
5
5
7
7
7
25
25
36
7
6
7
32
261
BEDS PREPARED MAXIMUM SERIAL
DELEGATIONS
GUESTS
No.
NUMBER PRESENT
for
for service
TOGETHER
guests
personnel
37
Puerto Rico
1
1
1
38
Rhodesia
6
6
6
39
Rumania
23
23
34
40
San Marino
1
1
1
41
South Africa
2
2
2
42
Spain
14
14
15
43
Sweden
20
20
22
44
Switzerland
3
3
3
45
Turkey
3
3
3
46
U.S.A.
63
63
75
47
U.S.S.R.
64
64
64
48
Venezuela
6
6
6
49
Yugoslavia
10
10
10
50
Various guests
8
8
8
715
712
TOTAL
921
allocated to them, see that his quarter functioned properly, supervise the work performed by his subordinates, inform the Heads of Reception, Administration and Lodging Sectors daily on the number of guests and staff present and bid farewell to Heads of Missions on their departure from the Village. Furthermore, he had to keep a daily register of guests present; find solutions to all possible requests made by Heads of Missions, referring matters to the Directorate of the Olympic Village only when he was unable to solve them himself and, finally, immediately report to his Head of Sector any incident, however slight, that might have taken place. The Head of Building, a junior Army officer, was responsible for meeting the Heads of Missions on their arrival and accompanying them to their respective premises; keeping a daily record of the number of guests, signing appropriate reports to be sent out to various offices; superintending the activities of the service personnel assigned to him and working out routine timetables; immediately reporting the slightest incident to his Head of Quarter; requesting the Services Sector for any help required from the maintenance team, 262
TABLE NO. 14
ORGANISATIONAL CHART OF QUARTER SERVICES
QUARTER
NUMBER OF BUILDINGS
BEDS
WOMEN CLEANERS AND SERVANTS
HEAD OF QUARTER
HEAD OF BUILDING
EMPLOYEES
1
3
6
58
12
HOUSEKEEPERS
I
3
1,052
II
3
1,168
1
3
6
58
12
3
6
58
12
III
3
969
1
IV
2
668
1
2
4
46
8
V
1
436
1
1
2
34
4
3
6
58
12
VI
3
1,344
1
VII
3
946
1
3
6
58
12
VIII
3
1,011
1
3
6
58
12
IX (a)
3
921
1
5
14
110
12
X (b)
2
1,634
1
2
4
60
11
Detached
1
181
—
1
3
47
2
27
10,330
10
29
63
645
109
TOTAL (a) Women's quarter. (b) Services quarter.
reporting to the Services Sector by signed reports of all cleaning personnel in his building and bidding farewell to Heads of Mission on their departure from the Olympic Village. The storekeeper had the duty of giving his full cooperation to the Head of Building and replacing him during his absence; checking daily on the number of guests present; compiling the report on the number of guests present; assisting the Head of Building in taking over both the premises and material therein; controlling the work of the housekeeper and cleaning personnel; keeping a check on the distribution of the material handed over to him and generally assisting the guests in his building in whatever ways were considered necessary. The assistant storekeeper acted as substitute to the storekeeper during his absence; checked on the changing of linen and the functioning of the service and installations, saw to regular changing of sheets; organised the withdrawal and return of the athletes' personal washing. He was furthermore responsible for all materials in store; kept an up-to-date record of material belonging to the Armed Forces as well as the property of the various firms 263
Entrance to the Women's Village, suitably protected; thus the quarter reserved to the female athletes' world functioned independently both for accommodation as well as for amenities.
and a check on the bed linen in reserve in case of unexpected requirements which also had to be taken into consideration. The housekeepers, four in number per building, worked in two shifts from 7 a.m. to 14.30 and from 14.00 to 21.30 hrs each day. They helped the storekeeper in storing material and keeping order in the storeroom premises; took charge of the building's linen, sheets and other consumable material; prepared beds in the case of unexpected arrivals and were at the general disposal of the guests for small mending, the removal of stains and sewing on of buttons etc. as well as the ironing of clothes only. The room personnel, who came from private organisations especially in the case of cleaning services, were entrusted with keeping offices and accommodation premises tidy; the internal cleaning of kitchens, bathrooms, floors, stairs and balconies; replacing consumable material (toilet paper, disinfectants, deodorants); the cleaning of windows, fixed assets, furniture and bric-a-brac and the making of beds and replacement of bed linen. 264
TABLE NO. 15
STANDARD PLAN OF A RESTAURANT
In order to carry out their tasks, the Heads of Quarter and Heads of Buildings had suitably furnished premises in the building which were used as office and lodging; storekeepers and housekeepers had premises as stores at their disposal whilst the room personnel made use of dressing-rooms situated in the 265
Services Quarter where they changed into uniform, thereafter being posted to the various buildings in accordance with a pre-arranged plan of allocation. The Accommodation Section attended to the organisation of the Villa Glori and Pratoni del Vivaro sectors for arrangements in connection with the stabling of horses entered for the equestrian events and lodging of the personnel in charge of the horses. The Villa Glori complex, which comprised seven buildings, having been suitably furnished, was able to accommodate some 100 to 150 grooms as well as making use of other premises as offices, stores and forage stores. The organisation of displacements was attended to by the Displacements Section which consisted of military personnel and comprised:—a Head of Displacements, a Head of Quarter, a veterinary officer, a warrant-officer farrier, a warrant-officer storekeeper and 4 soldiers. The Pratoni del Vivaro complex, where the " Dressage " and " Endurance " tests of the Equestrian Event were held, consisted of six groups of buildings set up especially for the purpose. In two of these, 120 beds were available as well as offices, stores, saddle store and other accommodation services. The other four were used as stables with a capacity of some 120 horses. Special arrangements made with local enterprises made it possible for this displacement to be autonomous as regards food for the personnel (the displacement staff, grooms and athletes participating in the competitions), forage for the horses, the removal of horse dung from the stables and the repair of saddles. Apart from managing the stock of material for furnishing the buildings and offices, the Accommodation Sector carried out other tasks which, although accessory, called for arrangements and measures of a certain importance in view of the considerable amount of consequent work. This was mainly composed of services for the cleaning of bed linen and towels and the replenishing of consumable materials. For the entire period of functioning of the Olympic Village a total of 60,140 sheets, 23,609 pillow-cases and 8,111 bedspreads were changed for some 7,000 beds in all. The replenishing of consumable materials in the lodgings i.e. toilet paper, soap, toothpaste and other toilet products was effected by the Administration Section at such times as to pass unnoticed by the guests. During the entire period of functioning of the Olympic Village the following quantities were distributed in the buildings:—20,000 rolls of toilet paper, 11,520 tins of shoe whitener, 5,000 tablets of soap, 5,000 tubes of toothpaste, 1,000 litres of liquid deodorant besides other consumable material of lesser interest. 266
The Provisioning Sector. The functioning of the Provisioning services was assured by an appropriate Management for the Sector and whose main task was that of co-ordinating the various services made responsible to offices under its jurisdiction:—the statistics and reports offices for the registration of goods consumed and the persons present and the checking of replenishments, the kitchens, the feeding halls and hygiene; the restaurant and food stores management offices which were entrusted to the International Company of Wagons-Lit on the one hand (restaurants) and the Italian Federation of Agricultural Consortiums on the other (food stores). Each of the ten restaurants was equipped with fixed installations, comprising a refrigerating and chilling unit (provided by the Stanzani & Co.) used to store edible provisions (with a constant room temperature of 0° to 10° C.) and capacity of 120 sq. m.; with a larder (also provided by Stanzani & Co.) chilled for conservation of meat and fish and for the preparation of certain dishes (constant room temperature adjustable right up to 15° C), capacity 74 sq. m.; with a whole range of kitchen equipment for the needs of the various sections, provided by the firm of Zoppas, i.e. cafeteria, washing of vegetables, cooking of dishes, washing of saucepans, crockery and glasses, cold dishes service, distribution service with 10 chilled shelves, 6 steam cookers, hot chambers, 4 shelves for dishes and 2 sliding trays. The mobile fittings for kitchen and restaurant allowed the maximum number of diners to be served in each restaurant in a two-hour session by means of the " self-service " system. Each restaurant, in addition, disposed of equipment for cool and iced drinks, in the form of refrigerating units provided by Zoppas (from four to six) with a total capacity of 6,000 litres; refrigerators for small bottles provided by Coca-Cola, 16 in number and with a total capacity of 9.60 cu. m.; two refrigerators for ice-creams supplied by Motta & Co. with a capacity of 3 cu. m. for 1,000 bars; four fruit juice distributors with a total capacity of 60 litres; two small iced-water fountains (provided by the FIAT company). The placing of this equipment in each of the 20 canteen rooms is shown in the graph contained in Table No. 15 together with the lay-out of the tables. The preparation and initial functioning of the restaurants was governed by the numbers of guests present and the consequent needs, in as short a time as possible and according to a detailed plan of preparation. By the 25th July (the date of the Opening of the Village) 4 restaurants were functioning and, of these, one had been in operation from 20th May onwards for the training of 120 assistants and 240 waiters recruited by the E.N. A.L.C. (Hotel Training Association). The further 6 restaurants were prepared and entered into operation between 28th July and 7th August, at the rate of one every two days. 267
Cordial conversation during moments of rest.
268
Preparations called for the utilisation of 60 men for a total of 180 working days; of 40 vans for transporting goods from general stores to restaurants; and of 20 visits by the disinfection team. The functioning of services was assured in each restaurant by personnel trained and specialised in the different branches. A " Head of Pavilion " carried out the task of overseeing and co-ordinating the service of the various sections, to see to administrative questions, and to account for all provisions as they were unloaded. The Head of the Room was encharged with the task of collaborating in inspection, direction of service in the room and distribution to the self-service of hot dishes and organisation of the shifts of the waiters. Lastly, the Head of Larder was responsible for all goods in store and had the task of gathering together each evening orders from the kitchen, attending to the preparation of breakfast and directing his personnel to lay out the cold snack bar. For the cleaning of the restaurants and area surrounding the pavilions workmen were employed in eight-hour shifts, i.e. from 5 to 13 hrs; from 11 to 19 hrs; from 17 to 01 hrs. (Table No. 16). During the period of maximum movement (28th August-6th September) the number of kitchen-boys, waiters and assistants had to be increased (to 120 persons in all) in the most popular restaurants.
Not even a hairdresser is lacking; here are a few athletes being attended to by the able hands of an expert.
269
TABLE NO. 16
ORGANISATION OF EACH OF THE TEN RESTAURANTS STAFF
TOTALS
FUNCTION Restaurant
Kitchen
Larder
Cleaning
Head of Pavilion
1
1
Head of Restaurant
2
2
24
24
6
6
Waiters Kitchen-boys Head Cook
1
1
Heads of Section
5
5
12
12
Porters
5
5
Dishwashers
2
2
Parlour-maids
2
2
Butcher
1
1
Assistants
Head Storekeeper
1
1
Storekeepers
5
5
Head coffee-maker
1
1
Coffee-makers
4
4
Manual workers TOTALS
33
28
11
3
3
3
75
In order to satisfy the various food requirements of the different Delegations, these were divided off into nine groups, according to racial and dietetical similarities and each group was assigned a separate restaurant. In addition, a " general menu " of dishes consisting of items of widely differing appeal was compiled to meet the needs of an international community, while each of the nine restaurants were provided with " special menus " containing more typical dishes of the countries in question. (Tables Nos. 17, 18 and 19). So as to avoid the possible inconvenience caused by a misunderstanding between Head of Delegation and Head of Pavilion on the pre-arrangement of the " daily menu ", the following measures were taken daily in all kitchens for the use of the general menu of dishes, i.e. foods classed as breakfast dishes were available daily as well as hors-d'oeuvre and cold buffet, fruit juices, cheeses, beverages. Two or three different dishes were prepared each day, for the items falling under the categories of vegetables and cream of vegetables soups, thick and clear coups, fish, meat vegetables, sweets. 270
TABLE NO. 17
ALLOTMENT OF RESTAURANTS PER GROUPS OF DELEGATIONS 1
2
3
4
5
NORTH AMERICA BRITISH ISLES
LATIN AMERICA IBERIA
GERMAN SPEAKING NATIONS
EASTERN EUROPE
SCANDINAVIA POLAND
Great Britain Ireland
313 80
Argentina Mexico Spain Uruguay
113 302
Austria Switzerland
411
393 Canada U.S.A.
138 70 115 88
Brazil Chile Colombia Cuba Panama Peru Portugal Puerto Rico Venezuela
114 50 31 47 15 9 78 20 51
Germany Liechtenstein
159 225
Czechoslovakia 143 U.S.R.R. 259
384
402
322 7
Hungary Rumania
257 170
Denmark Norway Sweden
120 93 185
398 Finland Iceland Poland
159 16 269
415
415
329
427
444
808
826
713
829
842
6
7
8
9
10
CENTRAL AND WESTERN EUROPE
INTERNATIONAL
MEDITER. NATIONS BALKANS
COMMONWEALTH AFRICA
ASIA
Belgium France
299 140
Destined for guests arriving late or for those engaged in sports activities outside Rome.
Greece Italy Lebanon Tunisia
118 77 68 8
Antilles Australia Bermuda Dutch Antilles Ethiopia Kenya New Zealand Rhodesia South Africa Uganda
Bulgaria Turkey Yugoslavia
123 99 227
15 130 11 7 39 20 60 13 70 19
Afghanistan Burma Borneo Ceylon India Korea Pakistan Philippines Singapore Thailand Viet Nam
Ghana Irak Iran Liberia Morocco Nigeria U.A.R.
16 23 46 17 41 39 164
15 11 9 34 71 56 77 38 49 17 25 402
384
471
439 Holland Israel Luxemburg Monaco
37 333 33 68
China Figi Hong Kong Japan Indonesia Malaya
63 3 8 224 47 46
271
449
346
391
710
920
730
793
271
TABLE NO. 18
THE MENU LIST PETIT DEJEUNER
POISSONS.
Lait – Chocolat – Thé – Café – Nescafé – Nescafé décaféiné – Ovomaltine – Beurre – Toast – Petits pains au beurre – Brioches – Croissants – Miel – Marmelades – Confitures d'orange – Fruits divers – Porridge – Corn Flakes – Yogourt – Jus de fruits et de tomates – Pamplemousse – Fruits – Compotes – Oeufs – Bacon – Jambon – Filets de harengs – Saumon – Haddock (aiglefin fumé) – Rollmops – Croquettes de poisson – Fromage – Viandes froides – Haricots.
Dental – Ombrine – Sole – Turbot – Bar – Truite – Langouste – Cabillaud – Mulet – Cre– vettes – Calmars – etc.
HORS–D'OEUVRE ET BUFFET FROID.
Jambon de Parme – Jambon de Modène – Jambon fumé – Saucisson – Galantine – Langue – Langue fumée – Pâtés – Terrines – Oeufs: durs, mollets, pochés – Thon – Sardines – Saumon fumé – Salades mixtes – Salades de poisson – Olives – Champignons et coeurs d'artichauts confits – Cor– nichons – Concombres – Anchois – Tomates – Poivrons – Aubergines – Salade de poulet – Roast– beef – Noix de veau – Poulet – Agneau – Dindon – Riz au lait – Salade de riz – Salades de saison crues et cuites. SAUCES.
Mayonnaise – Tartare – Griniche – Menthe – Chutney – Suédoise – Savora – Moutarde – Worcester – Piccalilly – Ketchup – Chili – Horse radish – Mixed pickles. FARINEUX – POTAGES – CRÈMES – CONSOMMÉS – SOUPES.
Pâtes (farine de blé de lère qualité): « macca– roni » de différentes formes assaisonnées comme suit: au beurre et parmesan – aux tomates fraîches – au jus de viande – a la bolonaise – à la crème – au gratin – en timbale – etc. Gnocchi (petites quenelles de semoule). Riz: Pilaf nature ou garni – Créole – Risotto – en timbale – Croquettes. Potages: de légumes frais ou secs – de semoule – etc. Crèmes: Volaille – Riz – Tomates – Avoine – Orge – Haricots – Lentilles – Petits pois – etc. Consommés: Chauds ou froids – au tapioca – au riz – aux pâtes – etc. Soupes: à l'italienne, au riz ou aux pâtes – Minestrone – etc. Bouillons de légumes.
272
VIANDES.
Boeuf: Roastbeef – Grillé – Braisé – Bouilli – Carbonnade – Fricassé – Filets tartare – Pau– piettes – Goulasch à la hongroise – Biftecks. Veau: Rôti – Grillé – Bouilli – Escalopes – Blan– quette – Curry – Pojarski – Paupiettes – Sauté de veau à la hongroise. Mouton: Rôti – Grillé – Braisé – A l'irlandaise – A l'écossaise – Au curry – Ragoût. Agneau: Rôti – Grillé – Blanquette – Au curry – Sauté d'agneau – Ballotine d'agneau – A la romaine. Poulet: Rôti – Grillé – Braisé – Farci – Fricassé – Au vin blanc – Curry. Gibier: Rôti – Grillé – Farci – Sauté. Pigeon: Rôti – Grillé – Farci – Sauté. Canard: Rôti – Farci – A l'orange. Lapin. Jambon cuit et Langue au Madère. LÉGUMES.
Frais: Pommes de terre – Tomates – Courgettes – Aubergines – Carottes – Champignons – Chou rouge – Céleri – Epinards – Bettes – Poivrons – Haricots verts – Haricots frais – Laitue – Chou – Betteraves – Concombres – Oignons – Artichauts. Secs: Haricots – Lentilles – Pois – Pois chiches – etc. FRUITS.
Pcches – Poires – Raisin – Reinettes – Oranges – Prunes – Melon – Abricots – Pamplemousses – Pastèque – Bananes – Fruits secs. DESSERTS.
Glaces au choix aromatisées – Tartes aux fruits – Strüdel – Gâteaux divers – Fraises. FROMAGES.
Gruyère – Chester – Gorgonzola – Bel Paese – Parmesan – Mozzarella (fromage frais) – Mozza– rella fumée – Laitages frais – Hollande – Yogourt – Provolone doux ou piquant – Stracchino – Ca– ciotta (fromage fabriqué dans la région de Rome ou en Toscane). BOISSONS.
Eaux Minérales (gazeuses ou non) – Orangeades – Coca-Cola – Jus de fruits – Lait – Thé – Café – Chocolat – etc.
The athletes engaged outside the Village at meal times could, on request, obtain picnic lunches which were available on the spot. Over three thousand picnic lunches were prepared during the entire period. TABLE NO. 19
MEAL TIMES IN THE TEN RESTAURANTS BEFORE AND AFTER THE GAMES
RESTAURANTS
MEALS
Breakfast Normal (Nos. 1 to 9)
to
7
9
total hrs. daily
2
from
6
to
total hrs. daily
9.30
3.30
Lunch
11.30
14
2.30
11
15
4
Dinner
19
21
2
18
23.30
5.30
9
11
2
10.30
1
Lunch
14
15
1
15
16
1
Dinner
21
22
1
24
3
3
Breakfast International (No. 10)
from
DURING THE GAMES (*)
TOTAL HRS.
10.30
9.30
18
TOTAL HRS.
(*) Times at which athletes could freely eat meals: 6
7
8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1
2
3
times
The Restaurant services. The international restaurant also served as a refreshment centre for all guests, who showed their approval of this initiative by making full use of this facility. During the whole period of its functioning this restaurant distributed approximately 20 thousand meals, plus a very large number of sandwiches, fruit, fruit juices, and beverages. In the canteen restaurants a sort of " self-service " was set up and so arranged that the guest, on entering could at once see the " daily menu " displayed on a large board placed above the distribution counter. Proceeding from one end to the other of the " self-service " counter he could pick up the following: tray, crockery and cutlery, hors d'oeuvre, cold dishes, hot dishes, fruit, and sweets. Then, from a second counter placed in the centre of the room, he could help himself to sauces, various condiments, 273 18.
The German, Heidi Schmid, after having won the gold medal in the individual foils, gaily dresses up in the Mexican poncho given to her by the Mexican, Roldan.
fruit juices, bread, etc. Before sitting down the guest could take his choice of beverages (mineral water, orangeade, coca-cola, etc.) directly from the various refrigerators set out along the walls of the room. The tables (with six places per table) were laid by the waiters with the following only: carafes of water, glasses, and napkins. No limitation was set on the guest who could serve himself time and again with whatever dishes he fancied. The waiters saw to the cleaning of the tables (changing of dirty trays, crockery, and glasses). The right of using the canteen was limited to guests of the Village officially registered by the Reception Office as they entered the Olympic Village and thus furnished with an Olympic Card with the words " Olympic Village " stamped across it. Each Delegation, however, could invite guests to the Olympic Village canteen, on the condition that the Delegation in question had provided its guests with a special " meal ticket " on sale directly from the Village Bank or from the Head of Pavilion. The guests of the Village were not subjected to special formalities in order to enjoy the canteen services. The restaurants of the Village were considered as part of their home and it was the desire of the Organizing Committee that they should make use of the canteen at will, as if in their own homes. 274
Naturally, the Olympic Village possessed its own shops: Here you see souvenirs and various articles for women.
However, to ensure order, a discrete watch was kept on proceedings by the Head of Pavilion, restaurant superintendents and Heads of Buildings. A clearer idea may be obtained of this service if we consider that in all 640,323 meals, chosen from at least 30 daily menus (three per restaurant), were served, with daily variations but with an average content of: mixed hors d'oeuvre, thick soup, three to four meat or fish dishes, sweet, ice-cream, fruit, coffee, and various beverages. To these figures must be added the distributions made by the international restaurant which, as mentioned above, also ran a refreshments service.
45,495 Work days. The service in all restaurants entailed an activity equal to 45,495 workdays on the part of the staff. In order to ensure the arrival in good time of foodstuffs of the quality and in the quantities necessary for the daily working of the restaurants, a network of supplies by means of stipulating " contracts 275
on consumption " were set up, this constituting a centralised depot for a determined quantity of all types of foodstuffs necessary for the preparation of dishes appearing on the " general " and " special " menus. The daily supplying of provisions from the centralised depot to the individual restaurants was made on the basis of specific requests. The depot was run by a director, an accountant, two assistant accountants, a chief storekeeper, 36 manual workers for loading and sorting provisions, a storekeeper, and a butcher. The technical management was in charge of an expert from the Provisioning Offices situated near the stores. The transportation of all provisions necessitated the use of 1 motor van and 6 medium-sized lorries with drivers for the requirements of the internal stores, 3 refrigerating lorries with drivers for the outside depot (refrigeration units), whilst for the refrigeration depot the following were necessary: 12 goods hoists, 300 metres of shelving, 12 scales and other accessories. Each restaurant when it began to function was equipped with a " reserve larder " comprising various types and quantities of foodstuffs. The stores of the central depot were equipped with 5 supply points, each for the exclusive use of two restaurants. The daily cycle of supply operations began at mid-day each day with the notification from the Statistics Office to the Restaurant Section of the number of guests present the previous day. This cycle developed following the requests for specific foodstuff's made by the Heads of Pavilions to the stores management office. Such requests had to be submitted before 4 p.m. each day. Between 4 p.m. and midnight each day the stores management prepared from each supply point the quantities and types of foodstuffs required and at 5 a.m. the following morning saw to the handing over and transport of the goods required by the restaurants. The cycle closed at 11 p.m. approx. with the transport of the last batch of requests of the preceding day. In the period between 25th July and 20th September 1960 a total of 1,370 tons net of foodstuffs were distributed by means of 1,200 medium-sized lorry-loads from internal depots to restaurants, covering over 2,000 kms. In addition, 310 transport lorries running between external and internal depots covered some 6,000 kms. This transportation service required in all 2,450 work days. (Tables Nos. 20 and 21). The work of removing empty bottles and wrappings was also considerable since it was indispensable to keep clear the corridors through which supplies were carried to the restaurants which easily became cluttered with empty bottles and tins, etc. from the restaurants themselves. This service was carried out by the transport and staff from the stores, taking advantage as far as possible of the return journey of vehicles which had transportated supplies to the restaurants. These operations generally took place between the end of 276
TABLE NO. 20
ITEMS CONSUMED IN THE RESTAURANTS CONSUMPTION SERIAL
No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
ITEMS Unit of measurement
Vinegar Bananas Butter - 1st quality Cocoa Coffee - unroasted Coffee - roasted Cinnamon Meat: Lamb " Mutton " Fresh beef " Frozen beef " Veal " Sweetbread " Tongue " Smoked pork " Fresh pork " Sucking pig Cloves Chocolate Sweets: Savoyard biscuits " Cakes without cream " Cakes with cream Flour: 1st grade " Oatmeal " Rice " Barley meal " Flour starch " Porridge " Barley pearl " Semolina " Tapioca Cheeses: Astro " Bel Paese " Caciotte " Fontina Norsk " Gorgonzola " Buffalo milk " Dutch " Parmezan " Provolone
Litres Kgs. " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " " "
Quantity
1,905 40,052.700 7,563.500 158 2,682 1,553 0.600 2,070 87 27,622 33,889.500 26,221.500 763.900 2,484 350 1,688.800 31,300 1 5 11.750 4,182.750 9,625.300 1,633 63.200 169.600 37.600 98 319.800 42.400 94.400 34.600 14.850 777.400 163 186 327 413.700 1,195.950 2,519.600 1,636.500
277
CONSUMPTION SERIAL
No.
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84
278
ITEMS Unit of measurement
Cheeses: Provolone spiced